07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081

of 28

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
State-controlled road-miatters
For more informati

  
 

 

reel tothe se Copa
of Main Roads (DMR) as a referral agency.

In certain circumstances MR wit bean

- agency; while in ther circurna
be a concurrence agericy”
Schedule 2of the ‘iP, Requilation
adel OMR is an.
neu agency: for-the application.

 
  
   

 

Pa

 

 

oo

. . IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick applicable box/es)
(1) development on land contiguous* to a State controlled road and for -
(2 @ material change of use assessable against the planning scheme;

LD (b) reconfiguring a lot unless -
+ the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased:

0 {c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
* associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
hw) development on land not contiguous to a State-controlled road and -
(a) material change of use -
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds.set by
that schedule;
CD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“+ and exceeding the thresholds set by that schedule; .
‘c) operational work (not associated with a material change of use assessable against ©
+ planning scheme or reconfiguring @ lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by

. that schedule.
ai none of the above

 

~ Clearing vegetation
For more information refer to Guide 12.

Unless you answered." ‘none of the above” ta Q3,
.the application requires assessment by the
“Department of: Natu Resources and Water
“INR
‘fan agency other than NRW is! ihe assessment
manager for.the application, NRW.is a *
concurrence agency for the application in relation
to this matter. -

Ifyou ticked-Q3()} or (ii), your application requires}

referral to NRW for assessment regardless of

whether vegetation clearing is proposed or not.

 

The application: involves: (tick applicable box/es)

OD (i). material change of use -

(a) assessable against the planning scheme;

(b) on a lot containing -

* acategory 1, 2 or 3 area shown ona property map of assessable vegetation; or
+ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;

(c) where the existing use of the land is a rural or environmental use; and

{d) where the size of the land is 2 hectares or larger - complete Part J of Form 1

reconfiguring a lot -

(a) on alot containing a category 1, 2 or 3 area shown on a property map of -
‘assessable vegetation or, if there i is no property map Of assessable vegetation “®
the lot, remnant vegetation;

(b) -where the size of the lot before the reconfiguration is 2 hectares or larger;

{c) where 2 or more lots are created; and

{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

aptly operational work: -
, (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA, and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 4

{iv) none of the above.

Odi)

 

 

Strategic port land

For more information refer to Guide 11.

Hyou ticked (i) - the retevant Port Authority is.the
assessment manager for-the application. .
‘Ifyou ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

The application involves:

[4 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1

(1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1

Mii) none ofthe above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if, pat of the land is within 100m of the Stale-contolled toad; 0 or that is par of of a future State-

contolled road.

Page 2

 

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published].pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.