Council archive · source document
07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published] · 142007.2081
INTEGRATED PLANNING ACT 1997
State-controlled road-miatters
For more informati
reel tothe se Copa
of Main Roads (DMR) as a referral agency.
In certain circumstances MR wit bean
- agency; while in ther circurna
be a concurrence agericy”
Schedule 2of the ‘iP, Requilation
adel OMR is an.
neu agency: for-the application.
Pa
oo
. . IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick applicable box/es)
(1) development on land contiguous* to a State controlled road and for -
(2 @ material change of use assessable against the planning scheme;
LD (b) reconfiguring a lot unless -
+ the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased:
0 {c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
* associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
hw) development on land not contiguous to a State-controlled road and -
(a) material change of use -
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds.set by
that schedule;
CD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
“+ and exceeding the thresholds set by that schedule; .
‘c) operational work (not associated with a material change of use assessable against ©
+ planning scheme or reconfiguring @ lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. that schedule.
ai none of the above
~ Clearing vegetation
For more information refer to Guide 12.
Unless you answered." ‘none of the above” ta Q3,
.the application requires assessment by the
“Department of: Natu Resources and Water
“INR
‘fan agency other than NRW is! ihe assessment
manager for.the application, NRW.is a *
concurrence agency for the application in relation
to this matter. -
Ifyou ticked-Q3()} or (ii), your application requires}
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.
The application: involves: (tick applicable box/es)
OD (i). material change of use -
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown ona property map of assessable vegetation; or
+ ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
{d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot -
(a) on alot containing a category 1, 2 or 3 area shown on a property map of -
‘assessable vegetation or, if there i is no property map Of assessable vegetation “®
the lot, remnant vegetation;
(b) -where the size of the lot before the reconfiguration is 2 hectares or larger;
{c) where 2 or more lots are created; and
{d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
aptly operational work: -
, (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA, and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 4
{iv) none of the above.
Odi)
Strategic port land
For more information refer to Guide 11.
Hyou ticked (i) - the retevant Port Authority is.the
assessment manager for-the application. .
‘Ifyou ticked (ii) Queensland Transport is a
concurrence agency for the application.
The application involves:
[4 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part ! of Form 1
(1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1
Mii) none ofthe above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if, pat of the land is within 100m of the Stale-contolled toad; 0 or that is par of of a future State-
contolled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2081 - Operational Works - Landscaping, Carparking & Access, Civil Works, Frontage Works, Stormwater Drainage and Infiltration Pit [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.