Skip to the record
Search everything, all in one place.

Council archive · source document

Decision Notice - Approved by Delegation of Authority - OPW26 0103 (As Published) · OPW26/0103

of 6

Text shows just the words. Original shows the document exactly as it was published.

               4.     ASSESSMENT MANAGER CONDITIONS

                      APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.       Rev.   Plan/Document Name                                      Date

                        12752 L 01     B      Landscape Plan – Cover Sheet, prepared by 2 July 2026
                                              Saunders Havill

                        12752 L 02     C      Landscape Plan – Layout and Planting Plan, prepared 9 July 2026
                                              by Saunders Havill

                        12752 L 03     C      Landscape Plan – Construction Details, prepared by 9 July 2026
                                              Saunders Havill

                      CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 18 September 2028 unless an application to extend the currency
                      period is approved by Council.
                      PRIOR TO COMMENCEMENT OF WORKS
               3.     A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
                      at least five business days’ notice). The prestart meeting must be attended by the responsible
                      persons for:
                      a.      Landscape works.
                      DURING CONSTRUCTION
                      General
               4.     Landscape works must be supervised, undertaken and certified by qualified persons*. All
                      works must be completed in accordance with this Decision Notice.
                      (* Refer to Advisory Note)
               5.     Where damage occurs to any Council asset as a result of the development works, it must be
                      repaired immediately where it creates a hazard that presents risk to person or property. Other
                      damage must be repaired prior to completion of works.
               6.     All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      The relevant conditions of the higher order Material Change of Use approval viz.
                              132006.413.06 to which this approval relates.
                      c.      All relevant Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.




                                                                                                       Page 2 of 6
Document Set ID: 25185835
Version: 3, Version Date: 18/09/2026

Used in these records

About this file

File size
147 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority - OPW26 0103 (As Published).pdf · 147 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.