Skip to the record
Every meeting, every word.

Council archive · source document

Part 1 of 37 IDAS Forms for Noosa on Weyba MCU12/0208

of 37

Text shows just the words. Original shows the document exactly as it was published.

Very large file (21.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

    1. What is the nature of the work or development proposed by the application? (Tick applicable box/es.)




     D Operational work        -

                                   complete table A        ~ Material Change of Use      -

                                                                                             complete table B

     D Reconfiguring a Lot-complete table C                D Building Work    -

                                                                                  complete table D



Table A         -
                    Operational Work

    Does the operational work involve the following? (Tick applicable boxles.)

    a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
       boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
       seawalls, slips, training walls, wharves and reclaimed land)? (Tick applicable box/es)

    ~ No              DYes
    If yes, what is the purpose?


I                                                I
    D Private purpose (e.g. private pontoon)
    D Another purpose (e.g. commercial marina)
    Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?

    ~No              DYes
    If applicable what is the estimated value of the proposed works?


l                                                I
    b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g. excavating
          or   moving sand, gravel or any other earth material on State land such as roads, esplanades, parks or unallocated
          state land) on state coastal land above high-water mark.


    ~ No              DYes
    If yes, which of the following?

    D Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
          with endemic native plants, or stinger net enclosures.

    D For purpose directly related to the provision of lifesaving or rescue services by a volunteer community
          organisation.

    D For other purposes (please state below).

I                                                I
    If applicable what is the estimated value of the proposed works?


I                                                I
    c) Disposing of dredge spoil or other solid waste material in tidal water?

    ~ No              DYes
    If applicable what is the estimated value of the proposed works?


I                                                I
    d) Constructing an artificial waterway?

      2                                                                   IDAS form 23-Tidal work and coastal management districts
                                                                                                       Version 2.0 17 December 2012

Used in these records

About this file

File size
21.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 1 of 37 IDAS Forms for Noosa on Weyba MCU12_0208.pdf · 21.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.