Council archive · source document
Part 1 of 37 IDAS Forms for Noosa on Weyba MCU12/0208
Very large file (21.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
1. What is the nature of the work or development proposed by the application? (Tick applicable box/es.)
D Operational work -
complete table A ~ Material Change of Use -
complete table B
D Reconfiguring a Lot-complete table C D Building Work -
complete table D
Table A -
Operational Work
Does the operational work involve the following? (Tick applicable boxles.)
a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and reclaimed land)? (Tick applicable box/es)
~ No DYes
If yes, what is the purpose?
I I
D Private purpose (e.g. private pontoon)
D Another purpose (e.g. commercial marina)
Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?
~No DYes
If applicable what is the estimated value of the proposed works?
l I
b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g. excavating
or moving sand, gravel or any other earth material on State land such as roads, esplanades, parks or unallocated
state land) on state coastal land above high-water mark.
~ No DYes
If yes, which of the following?
D Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.
D For purpose directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.
D For other purposes (please state below).
I I
If applicable what is the estimated value of the proposed works?
I I
c) Disposing of dredge spoil or other solid waste material in tidal water?
~ No DYes
If applicable what is the estimated value of the proposed works?
I I
d) Constructing an artificial waterway?
2 IDAS form 23-Tidal work and coastal management districts
Version 2.0 17 December 2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 1 of 37 IDAS Forms for Noosa on Weyba MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 21.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.