Council archive · source document
Town Planning Report · MCU15/0005
Attached to the e-mail MCU15/0005 Development Application.
d) Carparking spaces and the associated manoeuvring areas provided are designed to be safe
and functional and meet the reasonable requirements of the particular land use;
e) Adequate provision is made for the standing, parking, loading and unloading, access and
manoeuvring of service vehicles within the development site;
f) Development does not adversely impact on existing public parking;
g) Adequate monetary contributions are made in circumstances where Council considers the
provision of external parking will fulfill the parking demand generated by the development and
will not have an adverse impact on existing public parking; and
h) Vehicular access does not impact adversely upon existing landscaping or native vegetation.
Comment: The proposal achieves compliance with the Specific Outcomes of the Driveways and
Carparking Code as follows:-
The access arrangements proposed are safe and efficient. The development will not lead to any
adverse safety or road condition impacts in the locality.
All cars will be able to enter and leave the site in a forward motion.
Being located within the Shire Business Centre the site achieves good connection to established
alternative means of transport (e.g. pedestrian walkways, bikeways and bus stops).
12 carparking spaces are provided which complies with the requirement for the higher generating
use of Industrial business Type 2.
A single unit truck is able to load/unload and manoeuvre on site within the building and driveway
area.
EARTHWORKS CODE
A summary of the proposed development’s compliance with the purpose of the Eathworks Code is
included below.
The purpose of this code is to ensure:
a) To ensure that earthworks do not unreasonably impact on the natural environment or other
properties with regard to—
i. land stability (including differential settlement or expansion in reactive soils);
ii. contamination of land;
iii. flooding and drainage;
iv. groundwater, watercourses and wetlands;
v. loss of native remnant or regrowth vegetation; and
b) Earthworks are designed and constructed to be structurally sound.
Comment: The site is development ready and minimal earthworks are required for the proposed use.
The proposal will be able to achieve compliance with all Specific Outcomes of the Earthworks Code.
Detailed compliance will be demonstrated in a subsequent Operational Works Application.
EROSION AND SEDIMENT CONTROL CODE
A summary of the proposed development’s compliance with the purpose of the Erosion and Sediment
Control Code is included below.
The purpose of this code is to ensure:
a) there is no significant environmental harm caused by the effects of erosion and sediment
transport associated with development;
b) disturbed areas are stabilised and restored promptly and effectively; and
c) disturbance of land is minimised.
Comment: The site is development ready and minimal earthworks are required for the proposed use.
The proposal will be able to achieve compliance with all Specific Outcomes of the Erosion Control
Code. Detailed compliance will be demonstrated in a subsequent Operational Works Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.