Geotechnical Assessment · 142007.743.03
4 September 2023 J002100-001-L-Rev0 Tim & Lidia McNamara Email: [email protected] SLOPE STABILITY ASSESSMENT PROPOSED SWIMMING POOLS – 36 VENTURA STREET, SUNRISE BEACH Dear Tim, At your request, Core Consultants Pty Ltd (Core) has undertaken a slope stability assessment for proposed swimming pools at the above site. Our assessment was based on a review of available information and a walk-over survey (including insitu soil testing). This report presents the results of our desk study and site observations/testing, together with our slope stability assessment and recommendations. Site Description & Proposed Development The property is described as Lot 1 (Unit 1) and Lot 2 (Unit 2) on SP236316, covering a combined area of 608 m2. Image 1 below presents an aerial view of the site. The existing carpark and duplex residences cover most of the site, with proposed pools to be located at the rear (east) of the lots (refer Image 2 below). A detailed description of the site is given in the following sections. Photographs 1 and 2 show the general site conditions at the time of our walkover on 25 August 2023. The proposed works comprise the construction of two pools, one at the rear of each lot (unit). Earthworks are expected to comprise mostly excavations for the pools. Some filling of up to about 0.5 m high is also expected to form paved areas around the pools. The lot is connected to council water supply, sewerage, and stormwater systems. Image 1: Aerial view of site (courtesy Noosa Council [NC] on-line Public Mapping System)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
J002100-001-L-Rev0
4 September 2023
DCP2
DCP1
Image 2: Layout of proposed pools (Bright Building Design Dwg No. 02, Job No. 22.015) & DCP test locations
Photograph 1: Site conditions at Unit 1 (looking southwest)
Photograph 2: Site conditions at Unit 2 (looking southwest)
2
Page 3
J002100-001-L-Rev0
4 September 2023
Method and Scope of Investigation
As part of our slope stability assessment, a desktop study was carried out comprising a review of published
geological maps of the area and NC online mapping. No site specific soil test had been carried out at the
time of reporting.
Following the desktop study, a walkover survey was conducted to make an appraisal of the general condition
of the site, including assessment of existing nearby structures, earthworks, topography, drainage, vegetation
cover, geology, erosion and slope stability. The walkover survey was carried out by an experienced
geotechnical engineer from Core on 25 August 2023. Two dynamic cone penetrometer (DCP) tests were
also carried out during the site walk-over.
The results of the desktop study and walkover survey are given below.
RESULTS OF ASSESSMENT
Geology
The Queensland Geotechnical Database (QGD) indicates that the site geology comprises the recent
Pleistocene age “Quartz sand; parabolic sand dunes” (Qpd/1). An extract from the QGD geology map is
shown below in Image 3.
Site
Qpd/1
Image 3: Extract from QGD Geology map1
A soil test had not been carried out prior to our site visit. However, Core carried out two DCP tests (DCP1
and DCP2) to depths of 2.4 m and 2.9 m below ground level (BGL), respectively at the locations of the
proposed pools (refer Image 2 above). Results are attached in Table 1 below and indicate loose sand to
about 0.3 m to 0.6 m BGL, then medium dense, becoming dense from depths of about 1.2 m to 2.2 m BGL
continuing to test termination.
Pale grey/grey sand was observed at the ground surface and along nearby road cuttings.
3
Page 4
J002100-001-L-Rev0
4 September 2023
Table 1: DCP test results
Blows per 100 mm penetration
Depth
(m, BGL)
DCP1 DCP2
0.0-0.1 1 1
0.1-0.2 2 2
0.2-0.3 3 2
0.3-0.4 2 2
0.4-0.5 3 1
0.5-0.6 3 2
0.6-0.7 3 3
0.7-0.8 3 3
0.8-0.9 4 3
0.9-1.0 4 3
1.0-1.1 3 3
1.1-1.2 4 2
1.2-1.3 5 3
1.3-1.4 5 4
1.4-1.5 5 3
1.5-1.6 7 4
1.6-1.7 6 3
1.7-1.8 6 4
1.8-1.9 5 4
1.9-2.0 6 4
2.0-2.1 5 4
2.2-2.2 7 5
2.2-2.3 7 5
2.3-2.4 8 6
2.4-2.5 - 6
2.5-2.6 - 5
2.6-2.7 - 6
2.7-2.8 - 7
2.8-2.9 - 7
Existing Structures
The existing structure on site is a single and two level duplex building comprising rendered lightweight board
cladding with a block partition wall between the units (refer Photograph 3 below).
A large manhole was noted on the adjacent lot to the south, however, NC and Unitywater records do not
indicate that either a stormwater or sewer line runs along the rear of the subject site (refer Photograph 4).
All existing nearby structures appeared to be in good structural condition, with no obvious damage visible on
the exterior that may be attributable to slope movement (e.g., no cracking in house walls or concrete
driveway).
4
Page 5
J002100-001-L-Rev0
4 September 2023
Photograph 3: Front of existing units (looking from Ventura Street)
#36
(Unit 2)
Photograph 4: Stormwater or sewer manhole at northeast corner of adjacent lot
Topography
The site is located on the northeastern flank of a knoll that has a high point about 250 m to the southwest of
the site. The natural ground surface continues to fall across David Low Way towards a drainage channel to
the north-east. Natural ground slopes have been altered due to cut/fill earthworks for houses and roads
(refer Image 4).
Ground slopes recorded using a handheld clinometer are less than 3° across the proposed pool areas, and
for about 2 m to 3 m beyond the rear fence, where the slope steepens to about 22° along the cut bank down
to David Low Way (refer Photograph 5).
5
Page 6
J002100-001-L-Rev0
4 September 2023
Image 4: Topographic setting (1m contours; extract from NC on-line Public Mapping System)
Photograph 5: Cut bank down to David Low Way beyond the rear (east) of the site
6
Page 7
J002100-001-L-Rev0
4 September 2023
Groundwater
No signs of groundwater or seepage were noted during our site walkover.
Surface Drainage
Based on observations of the ground conditions during the walk-over, the site is considered to be well
drained as expected, having a permeable dune sand profile.
Future site drainage from structures is expected to be directed towards the existing stormwater pits located
in the rear corners of the lot, which are then connected to the council stormwater system.
Vegetation
The proposed pool areas comprise short grass, with some trees more than 3 m high located along the
boundary lines and on the sloping bank just outside the rear boundaries (refer Photograph 5 above).
ASSESSMENT & RECOMMENDATIONS
Existing Conditions
The lot is mapped on the NC Landslide Hazard Overlay (susceptibility) as having area of Moderate and High
hazard at the rear of the site (refer Image 5). As the site is relatively flat, it appears that the Moderate and
High hazard ratings are associated with the cut batter along the western side of David Low Way, just east of
the rear site boundaries.
Image 5: Extract from NC Landslide Hazard Overlay.
Stability Assessment
The risk assessment has been carried out following the Australian Geomechanics Society ‘Landslide Risk
Management Guidelines’ (AGS 2007). Relative levels of risk and their implications are given in Table 2
below and the Qualitative Terminology for Use in Assessing Risk to Property is attached in Appendix B.
7
Page 8
J002100-001-L-Rev0
4 September 2023
Table 2: Stability Risk Levels
Risk Level Example Implications
Unacceptable without treatment. Extensive detailed investigation and research, planning
VERY HIGH
VH and implementation of treatment options essential to reduce risk to Low; may be too
RISK
expensive and not practical. Work likely to cost more than value of property.
Unacceptable without treatment. Detailed investigation, planning and implementation of
H HIGH RISK treatment options required to reduce risk to Low. Work would cost a substantial sum in
relation to the value of the property.
May be tolerated in certain circumstances (subject to regulators’ approval) but requires
MODERATE
M investigation, planning and implementation of treatment options to reduce risk to Low.
RISK
Treatment options to reduce to Low risk should be implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk to
L LOW RISK
this level, ongoing maintenance required.
VERY LOW
VL Acceptable. Manage by normal slope maintenance procedures.
RISK
Note: 1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
depend on the nature of the property at risk; these are only given as a general guide.
With reference to the qualitative measures of likelihood and consequence given in the attachment Qualitative
Terminology for Use in Assessing Risk to Property, failure of the cut batter along David Low Way is
assessed as Rare. (i.e. the event is conceivable but only under exceptional circumstances over the design
life). The Consequence to Property (residence and pool) of such an event occurring is assessed to be
Medium (i.e. moderate damage to the pool and/or significant part of the site requiring large stabilisation
works). A combination of these measures in the risk matrix results in a property risk classification of Low.
The assessment of Rare is based on the lack of evidence of past movement (no damage to existing road
pavement or kerb/channel); the site geology and slope (medium dense to dense sand; nearly flat site and cut
batter about 22°); and the relatively good drainage across the site and surrounds.
This level of risk is generally acceptable to regulators (i.e. NC) provided the recommendations given below
are followed.
To maintain a ‘Low’ risk classification, the following measures must be implemented for future construction:
Temporary cut batters are to be no steeper than 1V:1H. If loose sand or groundwater is encountered,
temporary dewatering and flatter batters will be required (e.g. up to 1V:3H). If required setbacks cannot
be achieved due to the proximity of site boundaries or existing structures, some form of temporary
retaining will be required.
Surface drainage measures must be installed to direct stormwater flow away from the pool (and
residence) towards a legal point of discharge (e.g. stormwater drains at rear of lot).
8
Page 9
J002100-001-L-Rev0
4 September 2023
LIMITATIONS
Your attention is drawn to the document Limitations, which is attached.
Please contact the undersigned should you wish to discuss any of the above matters.
Yours sincerely,
CORE CONSULTANTS PTY LTD
Darryn Quinn Simon Maggiora
BE(Geological) MIEAust RPEQ 7602 BE(Civil) CPEng NER RPEQ 12467
Principal Geotechnical Engineer Principal Geotechnical Engineer
DQ/SM/dq
Attachments: Qualitative Terminology for Use in Assessing Risk to Property
Limitations
9
Page 10
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALITATIVE MEASURES OF LIKELIHOOD
Approximate Annual Probability
Implied Indicative Landslide
Description Descriptor Level
Indicative Notional Recurrence Interval
Value Boundary
10-1 5x10-2
10 years The event is expected to occur over the design life. ALMOST CERTAIN A
20 years The event will probably occur under adverse conditions over the
-2
10 100 years
design life.
LIKELY B
-3
-3 5x10 200 years
10 1000 years The event could occur under adverse conditions over the design life. POSSIBLE C
5x10-4 2000 years
The event might occur under very adverse circumstances over the
10-4 10,000 years
design life.
UNLIKELY D
-5 5x10-5 20,000 years
10 The event is conceivable but only under exceptional circumstances
100,000 years RARE E
over the design life.
-6 5x10-6 200,000 years
10 1,000,000 years The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Description Descriptor Level
Indicative Notional
Value Boundary
Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
200% CATASTROPHIC 1
stabilisation. Could cause at least one adjacent property major consequence damage.
100%
Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
60% MAJOR 2
stabilisation works. Could cause at least one adjacent property medium consequence damage.
40%
Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
20% MEDIUM 3
Could cause at least one adjacent property minor consequence damage.
10%
5% 1% Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR 4
Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
0.5% INSIGNIFICANT 5
notional boundary of 0.1%. See Risk Matrix.)
Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.
(3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
(4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa
91 Australian Geomechanics Vol 42 No 1 March 2007
Page 11
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)
QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
LIKELIHOOD CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
Indicative Value of 1: CATASTROPHIC 2: MAJOR 3: MEDIUM 4: MINOR 5:
Approximate Annual 200% 60% 20% 5% INSIGNIFICANT
Probability 0.5%
A – ALMOST CERTAIN 10-1 VH VH VH H M or L (5)
-2
B - LIKELY 10 VH VH H M L
C - POSSIBLE 10-3 VH H M M VL
D - UNLIKELY 10-4 H M L L VL
-5
E - RARE 10 M L L VL VL
-6
F - BARELY CREDIBLE 10 L VL VL VL VL
Notes: (5) For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
time.
RISK LEVEL IMPLICATIONS
Risk Level Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
VH VERY HIGH RISK options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.
Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
H HIGH RISK
risk to Low. Work would cost a substantial sum in relation to the value of the property.
May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
M MODERATE RISK implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
implemented as soon as practicable.
Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
L LOW RISK
required.
Acceptable. Manage by normal slope maintenance procedures.
VL VERY LOW RISK
Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
given as a general guide.
92 Australian Geomechanics Vol 42 No 1 March 2007
Page 12
LIMITATIONS This Document has been provided by Core Consultants Pty Ltd (“Core”) subject to the following limitations: This Document has been prepared for the particular purpose outlined in Core’s proposal and no responsibility is accepted for the use of this Document, in whole or in part, in other contexts or for any other purpose. The scope and the period of Core’s Services are as described in C o r e ’s proposal, and are subject to restrictions and limitations. Core did not perform a complete assessment of all possible conditions or circumstances that may exist at the site referenced in the Document. If a service is not expressly indicated, do not assume it has been provided. If a matter is not addressed, do not assume that any determination has been made by Core in regards to it. Conditions may exist which were undetectable given the limited nature of the enquiry Core was retained to undertake with respect to the site. Variations in conditions may occur between investigatory locations, and there may be special conditions pertaining to the site which have not been revealed by the investigation and which have not therefore been taken into account in the Document. Accordingly, additional studies and actions may be required. In addition, it is recognised that the passage of time affects the information and assessment provided in this Document. Core’s opinions are based upon information that existed at the time of the production of the Document. It is understood that the Services provided allowed Core to form no more than an opinion of the actual conditions of the site at the time the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings, or any laws or regulations. Any assessments made in this Document are based on the conditions indicated from published sources and the investigation described. No warranty is included, either express or implied, that the actual conditions will conform exactly to the assessments contained in this Document. Where data supplied by the client or other external sources, including previous site investigation data, have been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is accepted by Core for incomplete or inaccurate data supplied by others. Core may have retained subconsultants affiliated with Core to provide Services for the benefit of Core. To the maximum extent allowed by law, the Client acknowledges and agrees it will not have any direct legal recourse to, and waives any claim, demand, or cause of action against, Core’s affiliated companies, and their employees, officers and directors. This Document is provided for sole use by the Client and is confidential to it and its professional advisers. No responsibility whatsoever for the contents of this Document will be accepted to any person other than the Client. Any use which a third party makes of this Document, or any reliance on or decisions to be made based on it, is the responsibility of such third parties. Core accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this Document. Limitations Page 1 of 1 Date: 12/07/2018 FRM-065 Uncontrolled When Printed Issue: 1.02
Used in these records
Geotechnical Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.