Council archive · source document
W6107fd f15.pdf - form 15 footing & slab design · OPW16/0220
Attached to the e-mail Operational works application OPW16/0220.
Building measurements & siting and existing services. The builder must ensure the building is located in the correct location and building dimensions are used from architectural plans and not measured from the footing & slab plan. The sewer line indicated is the only service line identified on site which could influence the footing performance. We were not informed of any other existing services line excavations. Where other service line excavations do exist and are not identified or specifically addressed by the footing design; then the footing & slab elements above the critical line must be piered to below the stable line indicated in the attached drawing “supporting footings near temporary excavations” . Footing & slab inspections. The person inspecting the footing and slab must check that the soil types are representative of the ground profiles indicated in the soil logs and the site preparation is as recommended. Where the ground profiles or the site preparation differ significantly from the information supplied the designer must be contacted for further advice. W6107fd 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
W6107fd f15.pdf - form 15 footing & slab design.pdfRelated documentApplication case desk ↗
About this file
- File size
- 561 KB (small file)
- File type
No other editions are linked here.