Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

10/0431 - Op Works Viridian Noosa - Vehicle Turn-in [As Published] · 142010.431

of 24

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

Integrated Development Assessment System form

 

 

 

Application details—IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

 

You MUST complete ALL questions unless the form indicates otherwise. Incomy eeDeveloprnigert amrnater

information and documentation will result in your application not being a properly made application.

 

For all development applications, you must: Z 5 MAR 2010
* complete this form (Application details—IDAS form 1) . a
« complete any other forms relevant to your application ‘ , Tewaniin

 

 

 

¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

 

This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au

 

 

 

Applicant details (note: the ‘applicant is the person responsible for making the application and need-not be the owner of
the land. The applicant is responsible for ensuring the information provided on alt IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this apptication will be issued to the
applicant.) °

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Name/s (individual or company name in full) Leevbaryy Noord Sr LZD
For companies, contact name Zok BorRBER
Postal address (Zo Box aS GO
Now AEDS jv Are

Contact phone number SF SVTFFFO
Mobile number (non-mandatory) OAL Deeg
Fax number (non-mandatory) S FAT As FF
e-mall address (non-mandatory) 406. berger

@ Lopt- Low eee.

 

 

 

~
DEER AEE eT eis @ikp Wee

Government

 

 

 
Full text of the other 23 pages

Page 2

LI

 

 

1, What is the nature of development proposed? (tick all applicable box/es)

 

E] material change of use of premises

LE] building work
[A operational work

| reconfiguring a lot

 

2. What type of approval is being sought? / ,

 

me development permit

| pretiminary approval

LE] both—provide details below

 

 

 

 

3. 4s the application fora mobile and temporary environmentally relevant activity (ERA)?

 

[yy No

EJ Yes—complete table A and then go to question 5

 

Table A~—name of each local government area in which the mobile and temporary ERA is proposed to operate

 

 

 

4. Location of the premises (complete table B and/or table Cas-applicable. Identify each lotina separate row)

 

 

Table B—street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

[street address/lot on the plan

LE] street address/tot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

 

 

Street address Lot on plan description
Unit | Street | Street name and official suburb/ | Post- Lot no. Plan type
no. no. locality name code and plan no.

Local government area
(e.g. Logan, Cairns)

 

 

Ss

 

 

My vee ce

Ds vé
Noa IEA.

AY]

 

 

oa

lp Escrve

 

 

Sew ty at
Queer sT

 

 

Application details—IDAS form 1
Version 1.0 18 December 2009

 

 

 

Page 3

LIL

 

Table C—premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)

 

 

Coordinates . Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude

 

C] GDA94
, (_] wese,

C] other

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate hectares or m2).

 

 

 

 

He

6. Current use/s of the premises (e.g. vacant land, house, apartment Building, cané farm, etc.)

 

 

Lawevay

 

 

7-Provide a brief.description of the proposal e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

 

Sarezy fartsbkes oS LEE L STEPS Fede
VEWECE FRAN YN

 

 

 

8. Is owner's consent required for this application?. (refer to notes at the énd of this forrh-for thore information),

 

 

_

[| Yes—complete either table D, table E or table F as applicable

 

Table D

 

Name of owner/s of the land

 

1/We, the above-mentioned owner/s of the land, consent to the making of this application.

 

Signature of owner/s of the land

 

 

Date

 

 

 

3 Application details—lDAS form 1
Version 1.0 18 December 2009

 

Page 4

LIU

 

Table E

 

Name of owner/s of the land

 

 

EC] The owner’s written consent is attached or will be provided separately to the assessment manager

 

 

Table F

 

Name of owner/s of the land

 

 

| By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.

 

 

9. Does the application. involve a state resource? (e: g. the Bilication involves state land, or taking quarry | materials.
Refer to,the ‘notes at the end of this form for more information) » See

 

 

 

i | Yes—complete table G

 

Table G—state owned resources (provide details for each state resource in a separate table)

 

Nature of state-owned resource

 

Nature of evidence required (tick the
appticable box and attach a copy of the Cl

Evidence of an allocation of, or an entitlement to, the resource
evidence to this form)

LE] Evidence the chief executive of the department administering the
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource

CJ Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource

 

 

 

 

10. tdentify If any of the following apply to the premises (tick applicable box/es)

 

 

LC] adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete table H
C] on strategic port land under the 7ransport Infrastructure Act 1994—comptete table 1

| in a tidal water area—complete table J

 

Table H Name of water body, watercourse or aquifer

 

 

 

 

 

4 Application details—IDAS form 1
Version 1.0 18 December 2009

Page 5

LI

 

Table t Lot on plan description for strategic port land Port authority for the lot

 

 

 

Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)

 

 

 

 

 

11, Are there any existing easéments on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)

 

No LC ] Yes—ensure the type, location and dimension of each easement is included in the plans submitted

 

12. Does the proposal include new building work or operational work on the premises? (including any Services)

 

 

C] No [- Yes—ensure the nature, location and dimension of proposed works are included in plans submitted

 

13; Is the payment ‘ofa portable long service leave levy applicable to this application? (refer to notes at the end of this
form for more information) ' : .

 

[I No—go to question 15 LI Yes LV On. ALLLID Z Lminerate

 

 

44. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information) -

 

 

[A Ne
Yes—complete table K and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form

 

Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E, Lor P)

 

 

 

 

 

 

 

15. Has the local government agreed to apply a superseded ptanning scheme to this application under section 96 of
the Sustalnable Planning Act 2009?

 

 

ow

| Yes—please provide details below

 

 

 

 

 

 

 

 

Name of local government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
5 Application details—IDAS form 1

Version 1.0 18 December 2009

Page 6

LIL

 

16.: -List below all of the forms and supporting information that accompany this ‘application. (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application Note: this question
does not apply. for applications made f -line. -using Smart eDA) af a .

ge.

 

     

 

 

Description of attachment or title of attachment Method of lodgement to

 

assessment manager
Lae kaeNwE Serta

 

 

A gpewetid ~~ TBP CrrnnfcrTre

 

AG DAcELOAIE TT aA - Ze coe 2 Flav Se 2 ( Lz La
A nace ~ Le BAR Mh Soret 2 O |

 

 

Lo

 

 

 

“a7: Applicarit’s

 

Sf

 

 

[Mey making this application, | dectare that all infofpration in this application is true and correct (note: it is unlawful to
provide false or misleading information). L

 

 

Notes for completing this form

Question 8:

e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an
application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.

« Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.

Question 13:

« The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.

« The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

e The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.

e Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.

 

6 Application details—IDAS form
Version 1.0 18 December 2009

Page 7

LILI

Privacy—the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required
by Pasliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

Date received

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

To

 

 

 

Reference numbers

 

 

 

Council. | have been engaged as the private certifier for the building work referred
to in this application

 

Date of engagement

Name

BSA Certification license number

Building
classification/s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Description of the work

Qleave Project
Number

Amount paid

(3)

Date paid

Date receipted
form sighted by
assessment
manager

Name of officer who
sighted the form

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Application details—IDAS form 1
Version 1.018 December 2009

 

 

Page 8

 

 

 

 

 

 

 

Integrated Development Assessment System form

 

 

 

Building or operational work assessable
a planning scheme—IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

 

This form must be completed for development applications for building works or operational work assessable against a
planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a pro application.

For all development applications, you must:
« complete Application details—IDAS form 1
. complete any other forms relevant to your _—!
e
application.
Attach extra pages if there is insufficient space on this form.

 

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic port land under the 7ransport Infrastructure Act 1994.

 

This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au

 

 

4. What is the nature of the work that Tequires assessment.against a planning Scheme? (tick applicable box/es)

 

C] building work—complete table A [A operational work—complete table B

 

 

Table A

What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?

 

 

 

 

What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)

| development permit L] preliminary approval

Are there any current approvals associated with this application? (e.g. material change of use)

 

List of approval reference/s Date approved Date approval lapses

 

 

 

 

 

 

 

 

 

 

PRT EM AL oe Ia Gul 4

   

Queensland
Qin @®\ Government

 

 

 

Page 9

 

LUO

 

Table B

What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

road works C ] stormwater EC] water infrastructure
C] drainage works LC] earthworks | sewerage infrastructure
LC] landscaping C] signage C] clearing vegetation under the planning scheme

 

C] other—provide details

 

 

 

What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)

[7 development permit CI preliminary approval C] both—specify below

 

 

 

Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

 

 

No C] Yes—specify the number of lots being created

 

 

Are there any current approvals associated with this application? (e. & material change of use)

[] No [P] Ves—provide details below bee Yee

of

 

List of approval reference/s Date approved Date approval lapses

2coh/oFLS wy oF Sarit Canta 2.

 

 

 

 

 

 

 

 

 

2. What Is the dollar value of the proposed building work? (inc GST, materials and labour)... | $2, 200

 

 

 

7

3. Confirm that the following mandatory supporting information accompanies this application

 

 

 

 

 

 

 

 

Confirmation of Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following: [confirmed “sy bar
e the location and site area of the land to which the application relates
(relevant land)
¢ the north point
e the boundaries of the relevant land
¢ the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)
2 Building or operational work assessable against a planning scheme—lDAS form 6

Version 1.0 18 December 2009

 

 

Page 10

LIL

 

¢ any existing or proposed easements on the relevant land and their function
¢ any access limitation strips
¢ all existing and proposed roads and access points on the relevant land

 

a statement about how the proposed development addresses the local
government’s planning schemes and any other planning documents relevant to
the application

 

[Hconfirmed 7

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:
* existing and proposed contours
¢ areas to be cut and filled

e the location and level of any permanent survey marks or reference stations
used as datum for the works

« the location of any proposed retaining walls on the relevant land and their
height

* the defined flood level (if applicable)

¢ the defined fill level (if applicable)

| confirmed

 

Applications for operational works involving roadworks

 

 

drawings showing:

e existing and proposed contours

« the centreline or construction line showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points

© information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)

© kerb lines including kerb radii (where not parallet to centreline) and tangent
point changes (where not parallel to centreline)

¢ edge of pavement where kerb is not constructed

© position and extent of channelisation

¢ location and details of alt traffic signs, guideposts, guardrail and other street
furniture

* pavement markings including details on raised pavement markers

* catchpit, manhole and pipeline locations

e drainage details (if applicable)

* cross road drainage culverts (if applicable)

* concrete footpaths and cycle paths

e location and details for access points, ramps and invert crossings

¢ changes in surfacing material

(7 contirmed

 

 

 

 

3 Building or operational work assessable against a planning scheme—IDAS form 6

Version 1.0 18 December 2009

 

Page 11

LIU

 

Applications for operational works involving stormwater drainage

 

drawings showing: [] confirmed
e existing and proposed contours
« drainage locations, diameters and class of pipe, open drains and easements

¢ manhole location, chainage and offset or co-ordinates and inlet and outlet
invert levels

« inlet pit locations, chainage and offset or co-ordinates and invert and kerb
levels

 

Applications for operational works involving water reticulation

 

drawings showing: C] confirmed
¢ kerb lines or edge of pavement where kerb is not constructed

¢ location and levels of other utility services where affected by water
reticulation works

© pipe diameter, type of pipe and pipe alignment

¢ water main alignments

¢ water supply pump station details (if applicable)

¢ minor reservoir details (if applicable)

¢ conduits

e location of valves and fire hydrants

© location of house connections (if appticable)

e location of bench marks and reference pegs

 

Applications for operational works involving sewerage reticulation

 

drawings showing: CI confirmed
¢ location of all existing and proposed services

e location of all existing and proposed sewer lines and manhole locations
¢ location of all house connection branches

e kerb lines or edge of pavement where kerb is not constructed

e chainages

e design sewer invert levels

e design top of manhole levels

e type of manhole and manhole cover

¢ pipe diameter, type of pipe and pipe alignment

© location of house connections (if applicable)

® sewer pump station details (if applicable)

 

Applications for operational works involving street lighting

 

 

drawings showing: Cy confirmed
© location of all light poles and service conduits

¢ location of all other cross road conduits

© type of wattage and lighting

* any traffic calming devices

e additional plans for roundabouts and major roads (if applicable)
© details of any variations to normal alignment

¢ details of lighting levels

 

 

 

 

4 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009

 

Page 12

LILI

 

Applications for operational works involving public utility services

 

drawings showing: Cl confirmed
* any existing light potes and power poles

© any existing underground services
details of proposed services

e alternation to existing services

 

Applications for operational works involving landscaping works

 

drawings showing: CJ confirmed
¢ the location of proposed plant species

« aplant schedule indicating common and botanical names, pot sizes and
numbers of plants

* planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge

¢ the location and type of any existing trees to be retained

© construction details of planter boxes, retaining walls and fences

« the proposed maintenance period

¢ irrigation system details

 

 

 

 

 

Notes for completing this form:

e This form can also be used for development applications for building works or operational works assessable against
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the fand use plan for the airport land.

Privacy—please refer to your assessment manager for further details on the use of information recorded in this
form.

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.

 

5 Building or operational work assessable against a planning scheme—IDAS form 6
Version 1.0 18 December 2009

Page 13

 

NOOSA PROJECT

A Leighton / Macquarie Joint Venture

OPERATIONAL WORKS APPLICATION FOR PROVISION OF SAFETY
BARRIERS AND WHEEL STOPS TO EXISTING DRIVEWAY RAMP IN

MORWONG DRIVE ,NOOSA HEADS

. As depicted on TOD ENGINEERS DRAWING SkK2 the works are within
the road reserve boundaries and provided as safety measures to the
existing ramp access to Halse Lodge.

. These minor works have been undertaken and certified by TOD
ENGINEERS - refer attached letter of 19 March 2010.

. The driveway to Halse Lodge is to be used for turning vehicle denied
access at a boom gate to be installed within the boundaries of the
Viridian Noosa Resort [ Lot 903 in SP 221527 ] in order to comply with
the requirements of Condition 265 of Development Approval 2006/823

. Signage has been placed / will be placed according to the outline in the
attached copy of letter to Council dated 18 March 2010.

. As part of the requirements of Condition 265 a control mechanism is to
be placed within Lot 903 at the boundary with the road reserve . The
form of device is a boom gate as described in the letter of 18 March
2010.

Page 14

ATTACHMENT A -

LOCALITY PLAN &TOD ENGINEERS
DRAWING SK2

ay
a

Page 15

   
    
       
   
   
   

FRENCH
QUARTER

 

ram (ASSOOATED Coun FANT

PROPOSED TURNING AREA

MORWONG DRIVE

NOOSA HEADS

for

LEIGHTON CONSTRUCTIONS PTY. LTD.

ENGINEERS

STRUCTURAL CIMIL

 

Page 16

(tere

1603

   
   
 
    
 
  
    
  

z
es \ FRENCH
HALSE s enc
(1686 , NEW HIGH TIMBER
BARRIER / SCREEN FENCE
681 EXISTING LOW TIMBER POST

wn
S
ws
ne
o

ANO RAIL BARRIER FENCE Sm

70 BE REMOVED {re — (eel eel

NEW TIMBER WHEEL STOPS SCALE 1: 100 UNREDUCED AT A3

1725,

PROPERTY
BOUNDARY

Ayanb 42 sdove

Nee Gateass auois yo do:

as
>
&
a satefrain gf
3 : $
° ry 5 €89¢ OF boerdenlk lundergralnd
nate Pg ci ‘3,
fall erat ot = - =
ye
a
19.94
aw 1S
SHH® ae
VIRIDIAN soi
S swe)
(1629
=
z=
3

 

19.75
19.72
1.87

  

 

 

    
      
     
    

on
a AS 2890 B85 = i
4.91m x 187m CAR

   
 

PROPOSED TURNING AREA ae
MORWONG DRIVE TURNING AREA BASS SURVEY || roo Rese

 

241 Gumboll Road ENGINEERS

NOOSA HEADS PLAN
for
LEIGHTON CONSTRUCTIONS PTY. LTD.

BTAUCTURAL CIV,

EMAL. pahase@bigpond com

Page 17

ATTACHMENT B -

CERTIFICATION BY TOD ENGINEERS

Page 18

TODCONSULTING

TOD CONSULTING PTY LTD DIRECTORS
CIVIL AND STRUCTURAL ENGINEERS S Prystupa oe. weamcreyarca
ABN 39 128 805 336 P McGrath arco cud Mit Ave Anca

C Dowding 02. mies acco
D. Reynolds oc. mipweaue aPED

SP:LN LOSII-t
19 March 2010

Viridian Noosa Pty Ltd

PO Box 2360

NOOSA HEADS QLD 4567
ATTENTION: Bob Borger

Dear Sir

20 Mary Street Noosaville OLD 4566
PO Box 61 Noosavillo GLD 4566,
P07 5449 9600

FO? 5449 5494

E [email protected]
www.todconsulting.com

RE: TURNAROUND IN MORWONG DRIVE - ADJACENT TO HALSE

LODGE DRIVEWAY

1 Stefan Prystupa here by confirm I have inspected the turnaround at the Halse Lodge
access in Morwong Drive and hereby Certify that the Safety barriers and whcel stops
constructed are adequate for the purpose of restraining vehicles form tipping over the

edge of the wall during a 3 point turning manoeuvre.
Yours faithfully

STEFAN noel

TOD CONSULTING PTY LTD

 

ek ee

Page 19

ATTACHMENT C -

LETTER TO COUNCIL 18 MARCH 2010
with following Annexures

e Morwong Drive Sign Opposite Turn-in
e Sign notifying hours of access to resort

e Image of Proposed Boom Gat

ee ae

Page 20

   

VIR|DIAN

Viridian Noosa Pty Ltd
ACN 104 525 135

Administration Office
33A Viewland Drive
Noosa Heads Q 4567

PO Box 2360
Noosa Heads Q 4567

Telephone (07) 5455 4440
Facsimile (07) 5447 2384

NOOSA PROJECT rest

18 March 2010

[email protected]

 
  
 

Mark Lewis

Sunshine Coast Regional Council
9 Pelican Street

TEWANTIN 4565

Dear Mark

VIRIDIAN NOOSA : NORTHERN ACCESS CONTROLS
Following further investigation it has been established that an acceptable turning stot will work within
the existing configuration on the rear access driveway into Halse Lodge. We have tested the turning

arrangements as witnessed by Tony Doughty.

We have reinforced the barriers on the turning slot and included signage ‘TURN AROUND BAY
ONLY - NO PARKING’.

Other Signage
1. Opposite Turn Around We have placed an order for a sign as per the attached proof .
2. Morwong Drive Hours of Access Sign. As per attached proof
3. Morwong Drive Head of Cul-De-Sac. We have placed an order for a LIMITED ACCESS
sign (Black on Yellow) to be placed on existing pole for turn around sign , which will remain
in situ.
Control Devices
We will install very shortly a boom gate of the type illustrated in the attached image but with a blade
length that still allows passage of the postman’s bike. The gate will be situated on the boundary
between our property and the road reserve .
The Viridian Noosa Residences Body Corporate will be provided with 36 two button remote controls to
match the residents existing garage door remotes. Spare remotes can be retained by the Residences
Manager and provided to garbage, council, service trades. The gate will be programmed to otherwise
open and shut at the hours nominated in the Development Approval.
We will be retaining the new gate installed within the boundaries of our site further to the south. The
need for this gate is to restrict guests exiting the resort from inadvertently transgressing Little Hastings
Street private road opposite the Residences and then finding there is no exit at the boom gate.

We trust that the arrangements as outlincd are accepted by Counvil.

Yours faitiffully

BOB BORGER
PROJECT DIRECTOR

cc Clint Sloan

Page 21

 

450mm X 750mm ALUMINIUM SIGN

WHITE REFLECTIVE BACKGROUND
WITH VINYL LETTERS TO FACE

-

 

Private
Access

Turn
Around
Bay

 

 

 

 

Wa a

 

 

 

Page 22

fl
SUMNER +=
baa

@: Sunrise Group cf Companies

SUH

SUNSHINE COAST
P.O. BOX 1663

NOOSA HEADS Q. 4567

PH: 5447 3485
FAX : 5447 3480

| we

© Sgn oe ei acter eg 8

800mm

Matrix - ViridianStage 3

Sign # 11-12_V4 Illuminated Entry signage

8en Morland

Grant Pawson

42/2/2010

. ARTWORK PROOF

 

 

1800mm

 

400mm

Kien thine Gay

7 OMeZOM)

[Dayjtime entry

 

 

i PLEASE PROD

~  AREFUotY

 

 

LONG ONE

Dayatimejentry)
Velie

Nighi.timezentry,

 

 

J] The signing of this proot indicates you have checked all spetlng and details and confirmed they are
all correct and ready to start production. Sunrise Designs and Sumner Signs wili not be hable for
any typographical errors. Any changes clients make after the final approval of arcwork will be

| charged at clients expense

Powdercoated Woodland Grey
Backplate 8mm Aluminium
Text - Intracut - {iluminated
via Internal Flouro tubes

 

 

 

 

P

Contast Cotour
to be Nominated
Sample Provided

 

If OK to proceed please sign and fax to (07) 5447 3480 or email acceptance to [email protected]

Page 23

eee

 

 

Ng

 

Page 24

   
    
   
 
  

S | aj ( . C DEVELOPMENT FEES & CONTRIBUTIONS
SUNS h INE * OaS (Cashier: Please Retum to Admin Officer, Development}
F CJ )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Plan Examination Calculation

 

  
    
 
   
 

Developer Contribution - Road Other than PSP
Developer Contribution - Drainage Other than PSP
Developer Contribution - Pathway Other than PSP : Inspection Calculation

Developer Contrib. — in Liev Off St Parking (PSP13 Car parking) ee |
Developer Contribution — Other Parks and Community rr ee
ICS — Community Land (Not currently active) | fT

ICS - Public Transport

(C5 - Sewerage PSP Rural [|__| ___®57___| Readiection:
ICS — Sewerage (PSP Coastal) ; sid 613
ICS - Sewerage - South Peregian (PSP Maroochy) ee ee

ICS - Water Supply (PSP) 614

ICS - Sport and Recreation Land (PSP Parks) §59

ICS - Drainage (PSP Noosaville Master & Ward Street} Ct
ICS — Road (CMRNICP) If BA not entered then use 594 583

ICS — Pathway (PSP} 584

Total of Fees Paid (Excluding Bonds) $ T4¢g¢-00

 

 

  
 
 

 

    
  
   

 
 
 
      
 
   

   
 
 
     

 

Payee Name:
Address:

  
  

 

Po Bok 2260
ooSA HEA’ S Quo GSe? .

 

 

Development Location:

    

[CPllDate: is i N IRECEIPTATYPE,

S Stores
Hi ate; : JUNT: [ P i] File Numbers or Reference:
[Seon Oxpstsretonestiaioeratnonecinoisems [| sical) | 2OLO-4 81 ]

. Date application properly made:
Total of Fees Paid dnciudins Bond _ | Date application properlymade: sf
al of Fees Paid (Including Bonds) $_ 14¢4-00 ReceintNe: [4 f'I7 Qo, [Receint bate: DS/ZITT)

 

P:Land DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

 

Used in these records

About this file

File size
901 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0431 - Op Works Viridian Noosa - Vehicle Turn-in [As Published].pdf · 901 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.