Council archive · source document
07/2132 - MCU - Detached House [As Published] · 132007.2132
NOOSA Checklist - Applications Involving Land Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. - as some - - 4. APPLICATION FORMS ~ us eee . : 7 4.1. Form’ PartA 1.1.1. Ensure that the form is fully completed. | 1.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners consent is required. 11.2.4 ifthere are multiple owners, the consent of each owner is required. 4.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required. 4.2. Form! Part B-O Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. - ae - =a 2. REFERRAL INFORMATION ee oo 2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. 3, " ENVIRONMENTALLY RELEVANT ACTIVITIES, 3.1. Ensure that Part G is completed if EPA referral is required. 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. 4. ’ FORM2-REQUEST.TO CHANGE APPROVAL ~ 7 ' 4.1 Ensure that items 1-28 have been checked and/or completed including information regarding [1] applicant details and owners consent. 5. PLANS . a 5.14 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! Works) accompanies the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. 6. - SUPPORTINGINFORMATION 0 os De ne 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration _ and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. [=] 6.2. Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 7 PEE Se STR TS CR EE UV a s 7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees, a accompanies the application or has been paid. 7.2 Ensure that the fee which has been paid is recorded on the application form. 4 Receiving Officer Having completed this form and accepted the ap, fication, please deliver both to the following IDAS Application Receiving trays:- «Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section. * Ifthe application is for an Materia! Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. ¢ Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. e In alt other circumstances — AOP1’s desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 27 pages
Page 2
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
1 Development Application
Common details
_
<
a.
The completion of all applicable questions on Part A is mandatory for aft applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
: tequired, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
i Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide'4,
"Description of land
1 Aland the subject of the application, must be
1.
Street address: fnctudinghouse number, street name, suburblocality name & postoode) (if applicable)
[5 COMPASS PLACE. , SUNRISE BEACH, S67 |
@
i identified, However, a descripfon ofthe land is not
| Etemonaly Reena ERA) 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 if .
‘Sree sepa arn | wi] — = J
3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
saben comcatng Most land can be
"identfied by alot on plan description. These details | LoT 50 RP :9062n4 |
eae com tte documents orthrovgh he | 4 “The above description is for (tick applicable box)
; However, it the Land on which the developmentis LA) the tand on which the development is proposed; or
i niemurheond.,-eahoeser atone ie (ij) the land adjoining the water body or watercourse, within which the development is
' watercourse) provide — ; proposed; or
oor C1 (iti) the water body or watercourse.
o Sfonlateeetied rnieconsay, |S. Shop/tenancy number, 6. Storey /level: 7. Total area of land: (m? or ha):
- Q7 does ith
‘eee oa opt [NIA] [Zunes | [ioso
Pecoraro Secreta area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Wooce0 ett.) (if applicable)
_ Net: Areas oy ih wate maka at win | : |
Jocal govemment’s area
; Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
" Advice for completing Q9 - Q9 applies if i . .
an orn satiodora cratege development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
,Patland tidal area, For more datas refer to Guido 11 | NOOSA, -
‘Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
Ht there is insufficient blo, detats may bo
poniad to Steet oan [ VACANT |
11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquacutture in
ponds with total area of 7 ha for which wastes are released into waters etc).
t
[ ResingaTiee DWELLING |
, Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
Y
; Part A must sfways be accompanted by other [ Paar Dd |
j completed parts of Form 1. For information about :
j when a part of Form ‘1 may apply refer to Guide 1
‘Applicant details 13. Applicant's name: 15. Contact person:
{ppt nood note ths owne oe land LMIGHAG) biod EOS | LMatre. Moree _|
i tng eno tet 14. Contact number: 16. Facsimile number/e-mai-agdres
peion pve scoot The eae _ [019762 344 i
manager, any referral & the Chief Executive
i ea ay ne 17. Postal address:
Te sopcat ie a company contact person | wa NETHERBY RISE, SUURISE Bec, ate uRERENTED
ust be shown. 18. Signature: wf
z=
Page 3
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
HLand owner's consent (# applicable) 20. Land owner's consent to the making of this application: . oe
¥ Secon 3 2.1(3) ofthe [PA prserbes tht .
| ampoln mast contin ot be supped by, he Name Signatyss _7|___Date
| fin concent olan owner a pian ( °
in @ material change of use; MM wenn te t MOH _ we
ers Vand babe hgetter mak & ot win (i)
ii) on
{cana as defined under the Coastal Protection end PSNR MRA
Management Act 1995:
toa work on all ooridr land defined under the (iii)
1 Transport Infrastructure Act 1994, eo
Saction 3.8.1(2}(a) of the IPA provides that .
; landowner's consent is pot required for a mobile or {iv)
i temporary ERA . | fae tense eee c ees ee seen ec ec ec etn cece epee erence cette errr cease er cette pete e eee ecene
|For more Information refer to Guide 1, (v)
{Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
| Section 3.2.45) cite Pa requires erie O mary on Si coastal land under the Coastal Protection and Management Act 1995)?
“Iwo a resorbed Slate esauroe NO - goto 024 (DYES - goto 022
[sen aoe eae lon ana 22. This application is accompanied by evidence: {tick applicable box)
«without evidence ine Tesourre entitlement (1 (i)_ of the allocation of, or entitlement to, the resource - attech evidence and go to Q23(v)
Refer to scheduta ‘Ootthe Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
fation 1998 that the nature of evidence
nates oy the State Cet at an edgnp at ne development is consistent with an allocation of, or entitlement to, the resource - go
" development application.
C7 (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or @
, entitlement to, the resource - go to Q23
Advice for completing Q23 ____ 123. Evidence of the resource entitlement:
ee Tie es ty aenmaoy “evdenceis | (j) Resource entitlement / authority details (vii) Official stamp of the department
‘Rear ne em he eit eee
Resources, Mines and Water is mandatory where the . épplicable)
application involves any water or riverine quamry (i) Name of delegated officer
ceo eamees CC
Stale eae ot
ti jence . (vi) mus: iii’ iti
somplted «tho erldenea is tine tnitod (iii) Position of jated officer
(iv) Signature of delegated officer ‘
(vy) Date
(vi) re date of evidence f “ae =
‘ Assessment triggers 24. 1s the IDAS Assessment Checklist completed and attached to this application? e
‘This chectdst does not apply tthe application requires [AYES [INO - the assessment manager may refuse to accept this application on the
“must bo omelets rater apes "grounds thatthe appleton hes not been property made
‘Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
7 An application should be accompanied by details to -
» Support the proposal & enable the assessment
manager, referral agencies and any person viewing
“ the apptication during public scrutiny or public
- Notification to understand the scope of the proposal
and any potential impact.
Plan / Drawing / Report Number
(iv) 200-03 Lc)
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
1 DATE RECEIVING OFFICER'S ‘REFERENCE
FEEG) 650 | RECEIVED LGfce fer | WANES *1P) dumee [Romer 107/332 |
Notification of Engagement of Private Certifier (Optionat onal /
To, Council. | have been engaged as the private certifier for thé building work referred to in this application.
Date ofengagement / /
Accreditation Number.
Name: Signature:
Page 4
\TED PLANNING ACT 1997
_ Material change of use
assessable against a local government’s planning scheme
Part D, Version 2.0, 4 October 2004
Form 1 Development Application
Completion of all appficable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.
Nature of the application
A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process
and does not authorise development to occur.
1.
»
©
This application is for: (tick 1 or both # applicable).
Preliminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (ie.
: consideration of the proposal concept)
AND/OR
Vi at Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.
The subjectland 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of ‘gross floor area” go to
Forte defniion ctarss foovanaso® | x [ Qeladed Zona wn laolem Beaches,
application will be assessed.
3. Existing gross floor area: (eppicabley | NL. |
4, Are there any existing easements on the land?
CINO
[M1 YES - attach plans of the location and details of the purpose of the easement
Material change of use details 5. Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment buikiing,
vacant land to industry {lyre manufacturing) etc.)
[ Peace EAVES COVERALE - ]
6. Number of employees: { NA . ‘|
7. Operating days and hours: ‘TSA. : |
Associated building works details (if ,
applicable) 8. Site cover: 24 BY.
Seton rot yet, :
area’ and * 30 tthe planning 9, Gross floor area: iw ee “
against which the-application
against wien the-epp willbe 10. Number of on-site car parking spaces: [ 2 |
11. Number of storeys / maximum height above natural ground:
12. Number enpoyes
13. Hours and days the use will operate [ni . ‘|
Associated operational works details |14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.)
(if applicable)
DIA. _|
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY (eppicable to assessment manager)
DATE RECEIVED
REFERENCE
NUMBERS
Page 5
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
WN Form 1 Development Application
IDAS Assessment
Checklist
{Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1.
2.
10.
il,
This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept of Natural Resources and Water, Queensland Heritage Council etc.).
.This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
tis the responsibility of the applicant to accurately complete this checklist. .
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application wil rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the sole of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application. .
Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.gid.gov.au. 7
Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
t
| Note: The fottowing state assessment triggers apply.to development other than for building work assessable against the Building Regulation 2006.
SECTION 4 - STATE ASSESSMENT (completion mandatory) .
Environmentally relevant activity 1. The application involves: (tick appiicable box/es}
For more information refer to Guide 4. (1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above" to Q1, \ has not been made - complete Part G of Form 1
the application requires assessment by the - ~~. : . .
admnsteting authority? ¥ DL (i) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering Made - complete Part G of Form 4
authority, is the assessment manager for the Hii none of the above
Act 2000 is required.
pplication, the administering authority is a
‘oncurrence agency for the application in relation
to this matter.
Note. An application involving ERA 19 and/or 20
will also require completion of Part Kz of Form 1
for
approval where an allocation under the Water|
_ Continued overeat
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (applicabte to assessment manager)
“ DATE RECEIVED i. | + REFERENCE NUMBERIS
The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA,
For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fishesies (for a delegated ERA). .
Page 1
Page 6
INTEGRATED PLANNING ACT 1997
State-controlled road matters
For more information refer to Guide 3,
‘Unless you answered “none of the above” to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.
In certain circumstances DMR will be an advice
agency, while in ather circumstances DMR wil
be a concurrence agency.
Schedule 2 of the IP Requlation will assist you to
determine where DMR is an advice or
concurrence agency for the application.
~ Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above” to 03,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRWis the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.
If you ticked Q3(i) or (ji), your application requires!
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.
2.
IDAS Assessment Checklist, Version 20, 2 Aprit 2007
The application involves: (tick applicable box/es)
(1 (i) development on land contiguous* to a State controlled road and for -
(J (a) material change of use assessable against the planning scheme;
(b) reconfiguring a fot unless -
« the total number of lots is not increased; and .
« the total number of lots abutting the State-controlled road is not increased;
(1 (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
* associated with access to a State-controlled road; or
« for filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LU (ii) development on land not contiguous to a State-controlled road and -
(a) material change of use -
» assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(2) (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
“~~ and exceeding the thresholds set by that schedule;
[L () operational work (not associated with a material change of use assessable against
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. that schedule.
aw (iii) none of the above
The application:involves: (tick applicable boxes)
(J (i) material change of use -
(a) assessable against the planning scheme;
(b) ona lot containing -
« acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot —
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; @
(b) - where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and .
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
operational work -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i} or reconfiguring a lot mentioned in (ii) - complete Part J of
Form1
iv none of the above.
D iii
D iii
Strategic port land
For more information refer to Guide 11.
If you ticked (i) - the relevant Port Authority is the
assessment manager for the application.
If you ticked (i) Queensland Transportis a
concurrence agency for the application.
The application involves:
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part f of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part | of Form 1
(iii) none of the above
4° Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean tand - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2
Page 7
INTEGRATED PLANNING ACT 1997 Acid sulfate solls 5. For more information refer to Guide 10, Unless you answered ‘none of the above" to Q5, the application requires assessment by Department of Naturat Resources and Water (NRW), fan agency other than NRW is the assessment manager for the application, NRW is an advice agency for the application in relation to this matter. IDAS Assessment Checklist, Version 20, 2 April 2007 The application involves development on land situated in an identifieds local government area and where the surface of the land is: (tick appticable box) (1 ()_ below 20m AHDS and the development will involve the excavation of 1000m? or more of soil or sediment at or below 5m AHD, or . D1 Gi) at or betow 5m AHD and the development will involve filling the site with 1000m? or more of material iii none of the above Major hazard facilities or possible 6. major hazard facilities For more information refer to Guide 17. Ifyou answered "YES" to Q6, the application requires assessment by the Department of Emergency Services (DES). Ifan agency other than DES is the assessment manager for the application, DES is a concurrence agency for the application in felation to this matter. Does the application involve a material change of use for a major hazard facifity or possible major hazard facility as defined under the Dangerous Goods Safety Management Act 20017 NO [DYES - complete Part L of Form 1 Water related development under the | 7. Water Act 2000 For more information about items (a) - (f), refer to Guide 15. For more information about item (9), refer to Guide 14 Does my application involve assessment of a referable dam? e Unless you answered "none of the above” to Q7, the application requires assessment by the Department of Natural Resources and Water (NRW). If an agency other than NRW is the assessment manager for the application, NRWisa - concurrence agency for the application in relation to this matter. The application involves: [1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is: (tick applicable box/es) (J (a) in a watercourse, fake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ke, Ks, Ke, Ke, or Ks of Form 1 whichever is applicable; (J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part Ks of Form 7, . for a subartesian bore, in declared subartesian area’, or in a certain area covered by a water resource plan, for use for purposes other than stock and/or domestic US@ - complete Part K: of Form 1; for a subartesian bore, in certain declared subartesian areas, for use for stock and/or domestic purposes - complete Part K; of Form f: for taking overland flow water in certain areas covered by a water resource plan — complete Part Ks of Form 1; for interfering with overland flow water in a drainage and embankment area - complete Part Kio of Form 1 for constructing a referable dam® or works that will increase the storage capacity of a referable dam by more than 10% - complete Part Ks of Form 1; or none of the above. Of O@) Aiiy Removal of quarry material from a 8. Watercourse For more information refer to Guide 16. If you answered “YES" to Q8, the application requires assessment by the Department of Natural Resources and Water (NRW}. if an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in relation to this matter. Note: Part G of Form 1 is required to be completed as the activity of removing quany material rom a watercourse is also an Environmentally Relevant Activity (ERA). Does the application involve development for the removal of quarry material from a watercourse? requiring an allocation notice under the Water Act 2000? : [Ano (YES - complete Parts Kz and G of Form 1 5. The identified tocal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Coatoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maraochy, Maryboraugh, Mirium Vale, Mornington, Noosa, Pine Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsvile, Whitsunday. Australian Height Datum (AHD). Referable dam is defined under the Water Act 2000. Watercourse is defined in sch 10 of the IPA. wOIu]s The declared ground water areas are listed in Guide 13 Development in a declared catchment area. Page 3
Page 8
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 8. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “none of the above” to 09,
the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPAisa
concurrence agency for the application in
elation to this matter.
Loca! government is the assessment manager
for all prescribed tidal work.
9.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: ( tick the applicable box/es)
D6
O tii
Of)
Aww
tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act} that is not prescribed tidal work - complete Part M of Form 1; of
tidal work that is prescribed tidal work" other than in a canal’? -complete Pant P of Form 1; or
Carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) {0 (i) below are ticked.
(J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal12 intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or @
none of the above.
Ob)
Oe)
Od
Oe)
Of:
Og)
On)
mT)
Operational work betow high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tida! areas refer to Guide 24.
Untess you answered “none of the above" to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidal work.
10. The application involves operational work that is: ( tick the applicable box/es)
(i
tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; of
(1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; or
CI ii)
Ai)
carried out within a coastal management district's under the Coastal Act and for -
[1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;
[J (b) reclaiming land under tidal water - complete Part M of Form 1; of
De)
constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1;
none of the above.
Coastal management
For more information refer to Guide 18.
Unless you answered "none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
11.
The application involves: (tick the applicable box/es)
(i)
Diii
Diy
OW)
Aw
a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'5
a material change of use assessable under a planning scheme involving building e@
work, Carried out completely or partly in a coastal management district that is —
« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 — complete Part M of Form 1
none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Caastal Protection and Management Regulation 2003 and includes certain tidat works completely of partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2} of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA. goto the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construc! the artificial waterway.
Page 4
Page 9
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refes to Guide 18. For
information about prescribed tidat work refer to
Guide 24.
\fyou answered “YES" to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
developmentis -
* within 200m of a shipping channel or an entry
and exit shipping corridor for the port
* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds; -
within 1000m of a planned port facifity
identified in a land use plan approved under
the Transport Infrastructure Act 1994.
In all other situation the Port Authority is an
advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark'8 and within the limits of a port
under the Transport Infrastructure Act 1994?
Ano
(1 YES - complete Part M of Form 1, or Part P of Form 4 ifthe work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a:marina is prescribed
tidal work refer to Guide 24. The tocal
government is the assessment manager for all
prescribed tidal work.
Ifyou answered “YES” to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency. .
13. Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
(Ano
[DYES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Tidal works in strategic port land tidal
areas
For more information refer to Guide 18.
Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
apptication and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage
For further information refer. to Guide 19.
Ifyou answered "YES" to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.
Untess you answered “none of the above” to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
4. Dogs the application involve tidal works within a strategic port land tidal area20?
NO -
CIYEs: complete Part M of Form 1
=
15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
No
Olyes- complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
O(i) — amateriat change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992:
none of the above.
a)
Hii
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queenstand,
refer to Guide 13.
Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.
16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: {tick the applicable box/es)
0 (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
Ci (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
of out an environmentally relevant activity under the Environmental Protection Act 1994:
(iii)
none of the above
18 High water mark.is defined in the Coasta! Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995,
20 Strategic port Jand tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5.
Page 10
INTEGRATED PLANNING ACT 1997
Contaminated land
Applications involving material change of use
and or reconfiguring a lot may trigger this
referral.
For more information refer to Guide 5.
Unless you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
relation to this matter.
47.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es)
(1 (i) reconfiguring a lot for which alt of part of the premises are —
{a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d};
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
DD (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
A (iii) none of the above
Electricity infrastructure
For more information refer to schedule 2of the IP
Regulation.
Unless you answered “none of the abover to.
Q18, the application triggers referrat to the
agency to which the easement is. granted in in
favour of as advice agency.
18.
The application involves: (tick the applicable box/es)
(1 (i) reconfiguring a lot where any part of the lot is -
¢ subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or ,
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associat aD
with reconfiguring a lot if —
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
mA (v) none of the above.
Di)
Diii
Ov)
Land designated for community
infrastructure
Applications involving development on land
designated forcommunity infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP Regulation.
It you answered "YES" to Q19, the application
fequires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the ~
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.
. Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
NO
Cl yYes
Page 6
Page 11
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the
IP Requlation.
Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Uniess you answered “none of the above" to
Q20, the application requires assessment by the
Office of Urban Management {OUM).
Fisherles matters
For more.information refer to schedute 2of the IP
_ Regulation.
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary industries and Fisheries
(DPI&F).
If an agency other than DPI8F is the assessment
manager for the application, DPI&F is a
Concurrence agency for the application in
relation to items {i} - {iv) and an advice agency
in relation to item (v).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es} -
1 (i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
DD (i) anurban activity -
(1 sinan area included in a structure plan where the IPA, section 3.1.6
applies;
(0 inan area not included in a structure plan where -
+ the IPA, section 3.1.6 applies to the application for the material change
of use; or
+ the premises exceeds 10,000m2; or
¢ the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant planning scheme
DU (i) intensive animal husbandry, or
CO (iii) residentiat development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
CD (ii) residential development involving a rural residential purpose and not
: specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in section: 2.8(2);
(d) in the Investigation Area for -
OO (i) anurban activity and not specified in section 2.10(2);
0 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or :
C1 (ii) intensive animal husbandry
(1) (ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
ZA (ii none of the above
The application involves: (tick the applicable box/es)
Li (i) an assessable material change of use for aquaculture - complete Part O; of Form 1;
CJ (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 7;
Diiiii)
assessable operational work completely or partly within a declared fish habitat area-
OW)
21.
complete Part O2 of Form 1;
assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
development assessable under the IPA, schedule 8, part 1, on land that adjoins a .
declared fish habitat area; |
none of the above.
Page?
Page 12
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requiation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.
22. The application involves: (tick the applicable box/es)—
IDAS Assessment Checklist, Version 20, 2 Apri 2007
1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
D1 (ii) reconfiguring a lot—
(1 (a) onland that is completely or partly within a a public transport corridor, and the
total number of lots increases;
LJ (b) _ ontand that is completely or partly within a future public transport cortidr or
an airport's public safety area;
O(c). on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
L1(d) . for a residential purpose within the 25 ANEF contour for an airport;
(J (e) fora residential purpose resulting in 100 or more allotments.
_ [1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
L (a) _ is completely or partly within a public transport corridor or a future public
: transport corridor;
(J (b) _ will resuit in work that encroaches into an airport's operational airspace.
A (iv) none of the above.
For more information refer to schedule 2of the IP
Regulation
Unless you answered “none of the above”, the
application triggers referral to the holder of
pipeline ficence No 1 issued under the Petroleum}
Act 1923, currently Santos QNT Ply Ltd, for
advice.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
- BA the IPA & schedule 7 of he IP Regulation ulation, D0 mentioned in schedule 13D of the IP Regulation end excending the tnesholds set by that
Unless you answered “none of the above’, the
application tiggers referral to QT as a schedule.
concurrence agency. (1 (ii) reconfiguring a fot—
C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(J (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(J (c)_— on tand that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(-] (4) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
(J (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the tota) number of lots increases;
C1 (f) for a residential purpose resulting in 100 or more allotments.
(1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) e@
above, involving extracting, excavating or filling greater than 50m3, on tand that—
(1 {a} _ is compieieiy or pariiy within rail corridor and or commercial corridor land, and
the work is not for rait transport infrastructure or other rail infrastructure;
(] (b) is completely or partly within future railway land, or a railway tunnel easement;
[1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
{Z\ (iv) none of the above.
Moonie to Brisbane pipeline 24, The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
(1 (ii) reconfiguring a lot
(](iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
{iv) none of the above.
Page 8
Page 13
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the iP Requiation.
Unless you answered “none of the above”, the
application requires referrat to the Environmental
Protection Agency as a concurrence agency.
IDAS Assessment Checklist, Version 20, 2 Apr 2007
25. The application involves: (tick the applicable box/es)—
[1 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in - .
[1 (a) clearing of native vegetation over an area greater than 2500m2;
[1 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
(1 (ce) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
(1d) extracting gravel, rock or sand from an area ‘greater than 5000m?;
[1 (e) excavating or filling an area greater than 5000m?;
[1 (f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
LQ (ii) reconfiguring a fot in a koala conservation area or koala sustainability area that will
resuitin- —~
{J (a) an increased number of lots; .
[11(b) clearing of native vegetation over an area greater than 2500m2.
(1 Gil) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2,
1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
C1 (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m2,
[1 (c) excavating or filling an area greater than 5000m/’.
Aw none of the above.
Wild river area
For more information, refer to Guide 27
Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This wilt
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development Is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
iver area because the application cannot be
accepted by the assessment manager.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
No
(yes
Preliminary Approval
{f you answered YES to Q27, the application
triggers referral to the Department of Local
Govemment, Planning, Sport and Recreation as
an advice agency.
27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?
MNo
CJ Yes
Wetlands
Domestic activity means the construction or use
of a single residence on a lot and any reasonably’
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.
Note: Wetland is defined in the Integrated
Planning Regulation 1998,
Unless you answered “none of the above" to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
28. The application involves: (tick the applicable boxes) -
LJ (i) a material change of use, other than for a domestic activity, assessable against the
planning scheme fhat is in or within 100m of a wetland:
C1 (ii) reconfiguring a tot -
In or within 100m of a wetland that will result in
(1 (a) more than 10 lots being created; or
C1 (6) lots tess than 5 hectares;
A aii none of the above
Page 9
Page 14
INTEGRATED PLANNING ACT 1997 Conservation Estate Urban purposes is defined in the Integrated Planning Act 1997 as “purposes for which land is used in cities or towns, including residential, indusbial, sporting, recreation and Commercial purposes, but not including environmental, conservation, rural, naturat or wildemess area purposes”. Unless you answered “none of the above" to Q29, the application involves referral to the Environmental Protection Agency as an advice agency for the application. IDAS Assessment Checklist, Version 20, 2 April 2007 29. The application involves: (tick the applicable box/es)— (1 (i) a material change of use for urban purposes that is in or within 100m of any of the following - (J (a) a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992;; (1 (b) a State forest or timber reserve under the Forestry Act 1959; LJ (co) a marine park under the Marine Parks Act 2004; (1d) arecreation area under the Recreation Area Management Act 1988; [1 (e) aworld heritage area listed under the World Heritage Convention; [1 Brisbane forest park under the Brisbane Forest Park Act 1977. O (ii) reconfiguring a lot if - [3 (a) any part of the lot is situated in, or within 100m of, any of the following - C1() a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; D1 di) a State forest or timber reserve under the Forestry Act 1959; Ci(ili) a marine park under the Marine Parks Act 2004; C1 (i) arecreation area under the Recreation Area Management Act 1988; [1 (¥) _ aworld heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and [1 (b) the reconfiguration involves more than 10 lots being created, or any lot resulting from the reconfiguring is less than 5ha; A (iii) none of the above. e@ Page 10 .
Page 15
i
i
i
INTEGRATED PLANNING ACT 1997
SECTION 2 - ASSESSMENT INA \ WILD RIVER AREA:
{completion mandatory if the proposed development is located in a wild river area) -
1.
Wild River Area
It the responsibility of the applicant to
determine if the development is proposed in
a wild river area.
Information about wid river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
- Natural Resources and Water (NRW), accessing
the department's website www.nrw.qld.qov.au or
contacting the department by email on:
wild.tivers@nmw,qid.gov.au
Note on Referrals
Referrals for development in a wild river area
{other than for agricuttural activities and animal
husbandry activities) are not changed from the
existing referral arrangements. -
Notes on development assessable
against the Wild Rivers Code
For Information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27. The retevant wild river
declaration wil provide Information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code In this section of the
checklist provide some guidance however this
may vary between wild river areas. The refevant
declaration will provide the information applying
to each wild river area,
Applications for some new developments will not
be accepted if the proposed developments in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration.
IDAS Assessment Checklist, Version 20, 2 Aptil 2007
Which wild river area is the development proposed in?
The proposed development is to.be located in: (tick the applicable boxes)
Li) a high preservation area (HPA):
(_] ii} a preservation area (PA) ;
0 ifi) a wild river floodplain management area (FMA);
(1 iv) a wild river nominated waterway;
(1) wa designated urban area (DUA).
Environmentally relevant activities
(ERAs) in a designated urban area
Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do nat need to complete the
remaining questions in Section 2,
'f you answered NO to Q2, please complete the
remaining questions in Section 2.
2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a desiqnated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
il) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
| YES (ensure you have completed Part G of Form 1)
[Ano
Clearing native vegetation
If YES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Gulde 27 for a list of relevant purposes for
which an application may be made in a HPA.
If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted.
Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do not complete the remaining questions
in Section 2.
4.
's the application operational work for clearing native vegetation in a HPA?
NO Q YES (ensure you have completed Part J of Form 1)
If YES, is the clearing?
Oi i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
OQ il) in a HPA outside a registered area of agriculture?
Page 11
Page 16
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas
if you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.
if you answered YES to 5 and ticked box j} in
Q6, your application is required to be referred to
the EPA.
Note: If specified works are proposed in a local
government area, it is prescribed tidat work - the
relevant local government will be the
assessment manager with the EPA as a
coneurrence agency
If you answered YES to Q5, and ticked box ii) or
iti) in Q6, your application requires referral to
DPIF.
If you answered NO to Q5 and licked box i) in
Q6, the application will not be accepted.
It you answered NO to Q6§, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above wilt
Not be accepted.
If you answered NO at Q5 and ticked box iii) in
Q6, the application may be made if the works are} .
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be ocated in a HPA.
Fos more information about specified works refer
to Guide 27
Residential, commercial or industrial
development
ff you answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.
If you answered NO to Q7 and ticked either box
i) or ii) in Q8, the assessing agency is the
relevant local govemment. The application must
be assessed against and must comply with the
Wild Rivers Code.
IDAS Assessment Checklist, Version 20, 2 April 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
NO Cl yes
The application is for one or more of the following:
O i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); oF
(1 ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1}; OF
Oo iii) Building or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1).
Is the application for residential, commercial or industrial development in a designated urban
area?
Ll yes
(no
If NO, does the application for residential, commercial or industrial development involve:
oO i} a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or
Q ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
®
Animal husbandry activities
lf you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal! husbandry activities (as defined
aa the Wild Rivers Act 2005) ina PA? .
NO oO YES (ensure you have completed Part R of Form 1) ;
Agricultural activities
lf you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soi! disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?
Ano
if YES is the application for:
QO YES {ensure you have completed Part Q of Form 1)
oO i) a material change of use; or
Cc] ii} operational works.
Page 12 ‘
Page 17
. INTEGRATED PLANNING ACT 1997 Works that take overland flow water The relevant wild river declaration wil state works that take overland flow water are either sel assessable or assessable, of are exempt from wild river requirements. Wyou ticked Q13 i), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. Ifyou ticked Q13 i) an application is not required to be made however the works must comply with the relevant self-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an apptication ts required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. If you ticked Q13 iii) your application is not Subject to wild river requirements. Applications for development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. 12. 13. IDAS Assessment Checkfist, Version 20, 2 April 2007 Does the application involve works that take overland flow water in a HPA or an FMA? NO LJ YES (ensure you have completed Part Ke of Form 1) If YES, is the application for works stated in the relevant wild river declaration to be? (J i) assessable works ‘ (ii) selt-assessable works Dit) exempt works Works that interfere with overland flow water The relevant wild river dectaration will state works that interfere with overland flow water that are either self assessable, assessable or exempt from wild river requirements, . If you ticked Q15 i), your application must be assessed by NRW against the Wild Rivers Code and must comply with the code. \fyou ticked Q15 i) an application is not required to be made however the works must comply with the relevant seff-assessable section of the Wild Rivers Code, otherwise the works become assessable development for which an application is required and must be assessed by NRW against the relevant part of the Wild Rivers Code and must comply with the code. Hyou ticked Q15 iii) your application is not subject to wild river requirements. Applications far development that is other than that stated to be assessable, self-assessable or exempt will not be accepted. Waterway barrier works / Apptications for building or raising waterway barrier works in a HPA will not be accepted. Ifyou answered YES.to Q16, your application must be assessed by DPIF against the Wild Rivers Code and must comply with the cade. 16. Dogs the application involve works that interfere with overland flow water in a FMA? Ano O YES (ensure you have completed Part Kio of Form 1) If YES, is the application for works stated in the relevant wild rivers declaration to be? (11) assessable works (J ii) self-assessable works (iii) exempt works Does the application involve building or raising waterway barrier works in a PA? NO oO YES (ensure you have completed Part Os of Form 1) Aquaculture (non ERA) Applications for aquaculture in a HPA will not be accepted. \f you answered YES to Q17, your application must be assessed by DPIF against the Wild Rivers Code and must comply with the code. Does the application involve aquaculture in a PA? NO (DYES (ensure you have completed Part OQ; of Form 1) Works that interfere with water in a watercourse Note: If the development is proposed in a HPA, applications for all works that interfere with water in a watercourse (including dams or weirs, stream realignment or stream diversion) will not be accepted. In a PA, applications for instream dams and weirs may be accepted in nominated waterways. if yau ticked box i) in Q19, your application will hot be accepted. Note: Operational works outside a HPA or nominated waterway are not subject to wild river requirements. More information and focations of nominated waterways is available by contact NRW, accessing the department's website www. nnw.did.gov.au or contacting the department by email on: wild [email protected] the application involve operational works that interfere with water in a watercourse that is in a nominated waterway in a PA? NO | YES (ensure you have completed the relevant Part K of Form 1) \f YES, 0 i) The application is for an instream dam or weir; or Ol ii) The application is for operational works that interfere with water in a watercourse, and is for development other than a dam or weir. Page 13
Page 18
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities
Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
fequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local govemment (see EPA website for more
information on devolved ERAs)
If you answered NO to 20 you do not need to
complete Qs 21-24.
Ifyou answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?"
against the Wild Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.
If you answered NO to Q21, you do not need to
complete 022. If you answered YES to Q21 you
are required to complete Q22.
\t you answered NO to Q22, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code,
If you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to Q23, the
application must be assessed by the EPA or
NRW (as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
if you answered YES to Q24 the application will
Not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs in a designated urban
area
If the development is proposed in a designated
Urban area there may be no wild river
requirements, See Section 2 Q2.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).
20.
21.
22.
23.
24.
IDAS Assessment Checklist, Version 20, 2 April 2007
Doés the application involve an ERA?
[4YNno O YES (ensure you have completed Part G of Formt)
ls the application for an ERA 20 instream?
[Ano Oyes
\s a quarry allocation notice held for the proposed ERA 20 instream?
NO C1 yes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream) .
No Cyves
is the proposed development for ERA 20 (out of stream) and;
— inaFMA; and
— not low impact; and
— not for a residential complex in the area, or for specified works.
Ano Cl yes
Documentation
If you answered NO to Q25, your application
may be subject to an information request and
processing of the application may be delayed.
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements 4
as set out in the relevant part/s of the Wild Rivers Code?
Cino Clves
2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14 {
Page 19
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
I
SECTION 3 - BUILDING REFERRALS (completion not mandatory)
Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.
Special fire services - generally
For more information go to schedute 2 table 1 and
Schedule 2A of the IP Regulation.
Assessment period 15 days. No response is a
deemed refusal.
1.
An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
Tequires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
(IP Regulation) or includes an alternative solution assessed against the performance requirements of the
Building Code of Australia.
For more information go to schedule 2 of the iP
Regulation
Fire safety for budget accommodation |2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
romere information go to schedule 2 of the [P the subject of the application requires the installation of a fire safety system for a budget accommodation
Regulation building. ;
Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For Renin information go to schedule 2 of the JP if the application involves a workplace incorporating spray painting.
ula’
Retail meat premises 4. An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedute 2 of the [P retail meat premises.
Regulation
Private health facilities 5.- An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the IP involves a private health facility.”
Regulation
Workplace area less than 2.3m? 6. An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
For mofe information go to schedule 2 of the {P application involves a work place area less that 2.3m2.
Regulation
Land contiguous to a State-controlled |7. An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road . agency if the application involves land contiguous to a State-controlled road.
For more information go to schedule 2 of the IP . .
Pastoral workers accommodation 8, An application may trigger referral to the Department of Industrial Relations (OR) as a concurrence agency
For more information go to.schedule 2 of the IP if the application involves pastoral workers accommodation.
Regulation
Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the
For more information go to schedule 2 of the IP application involves a childcare centre.
Regulation
Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
For more information go to schedule 2 of the IP if the application involves land completely or partly seaward of a coastal building line22.
Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application
For mora information go to schedule 2 of the IP involves a heritage registered place.
Regulation .
Fisheries matters 12, An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
For more information go to schedute 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regulation as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.
Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application
transport involves existing or future public transport corridors, or airport operational airspace?3,
For more information go to schedule 2 of the IP
Regutation
‘Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application
involves future railway land.
NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
The focal government, as the concurrence agency, is required to assess and provide a response for the fallowing building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For alt
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.
Amenity and aesthetic impact of
particular building work for single
detached class 1 building or class 10
building or structure
For more information go to schedule 2 table 1 of the
P Regulation.
Assessment period 15 days. No response is a
deemed approval.
15.
An application will trigger a referral to the local government if it is :
¢ fora single detached class 1 building or class 10 structure; and
* the local government has declared by resolution the following:
~ the appearance of the building or structure will have an extremely adverse impact on the amenity of
the tocality; and
— the appearance of the building or structure would be in extreme conflict with the character of the
locality.
% Coastal building lines are prescribed under the Coastal Protection and Management Act 1995,
% Operational airspace is as defined in State Planning Policy 1/02 “Development in the Vicinity of Certain Airports and Aviation Facilities”.
Page 15
Page 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Aprit 2007 Whether pajticular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a occupied for residential purposes feferral to the local government as the concurrence agency. For more information go to schedule 2 table 1 of the §P Requtation. Assessment period 15 days. No response is a deemed refusal. Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work For more information go to schedule 2 table 4 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code. IP Requlation. 18. An application may trigger referral to the local government as the concurrence agency if the building work Assessment period 5 days. No response is 2 does not comply with the qualitative statement for building clearance and site cover. deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work . does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland Development Code, part 11 or 12. Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has For more information go to schedule 2 table 1 of the been completed. IP Regulation, : Assessment period 15 days. No response is a deemed refusal. Higher risk personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the services building work For more information go to schedute 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and JP Regulation and the QOC part 15 « the work does not comply with an acceptable solution stated in the part. Assessment period 15 days, No response is a deemed refusal. . @ Building work for residential service }22. An application for building work for premises in which residential care service under the Residential For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger IP Requtation and the QDC part 20, referral to the-local government as the concurrence agency. Assessment period 15 days. No response is a deemed refusal. Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger rebuilding teferral to the focal government as the concurrence agency. For more information go to schedule 2 table 1 of the IP Regulation, Assessment period 5 days. No response is a deemed refusal. Building work for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the designated rainwater tank area For more information go to schedule 2 table 1 of the IP Regulation and the QOC part 25. Assessment period 15 days. No response is a deemed refusal. building work or structure complies with the relevant performance criteria if - « Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant building work, in a designated rainwater tank area; and ¢ Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable solution for a relevant performance criteria. Page 16
Page 21
LSVO9 ANIHSNNS yss auukdes jo WeweBuy;y Ue seMNsUOD roe HOFY O42 10 UOLeS UIE IED pA MN NOI Lied Uy 10 SpoUM UT jWeNDOP a4y Jo BuULAdeo Jo oSn “OSHGIIY 2 00-00 L - WV as S | uBisaq aNeWsyIS | - HOV3g ASIMNNS Natal — jo 1Sukdoo an of8 JUSUMOp snN UY PsUTMUCD LOR MUU] PU mdeoKOD eHL ‘cama | on oma asvHd asta 3d098 C , : suenmuutues cv aia es UBId J008 /3!S aHfSuOI IBEW © LUNOD SSWANO | rion monger ca neat pvr ee fee I tery siet ico) 4 bere ss erode so; penseil zorov'st| > GaMSIASM) uoneuuasuy £0 penan) ese pur AUeUMDOP PefonUCSUN oFe sBULMELD owonsed wonren s00/s promeren 24 ern OME, sp3rotd sss @nss] uonetnps0-09 jermanns| 70°01-20| a oni on on ogey sqi0m jo oan 0000 *onto3¢oud av | woana| Nmvua| anssi| aiva| aza| aanowaayy 0} JOU 4219 He peyoeds og 6; um KuoIeEEng -sBormErp WO} OTFOS JOU Og ot aoe oes wemnaeer | es. yunog ssedwog : y AvSuraanss41) i\
Page 22
: - LSVO9 SNIHSNNS 48S dn fe Naame ay seumneven woinyary 2 0 conned
, 2/40°001, - | VW | as CS | uBisag aneweuos - HOWaE soon ravsrte| ae gee Be atc cena potreteoe tenessinn paw tecoa ae
20} }2811U2z9 et) 01 peered oq JENU! PeysUTUON jou suOrsUSUP huy “AUC
crew onimanoare Te uejq jeaa7] Anu SISUDIW [SYS LYHNOD SSVdWOO | eaainnd voneth Nae sours oa en oro ee ey
iss leaosdde now Jog penssi| zo‘orst| 3 ssanne
erase Iss SNSS} UONEUIPIO-OO jesMONNS| 20°01'eO} AG Die oer 0 318i eqot 1 “OM 19
woourg wos person 2b |__| ;
a 0000 en s9arowe gv | xoaN>|nmvxa| anssi| aiva| aau| aanowsay| Ob so} wife uo penseND eq oy exw FuofsUMult] “Bo}MeZD wou otras tou OR
ots eon poers ev O3NI1 Ses,
1.0d0zs¥,
“Sop pyesouca *. *
. 1, paugilipuiaoiq 3
“1 aBesoys “>
|
|
|
|
” : ~
— 9
|
|
—: -——i~--@
= | e
2 iu = —j—-—@
3 ‘oopzgu. ego 25 4F :
3 72". aayouoa ayersu09 ~ |
me an Pousiuly wugoug a stu, WK .
xs 0 dousyom. |. - afieue |
~~ Mee . Ie : |
~ ~ ~ ~ JAAO JOO}} : ‘ = = : _ { 9 )
oN - ~S “Ns *. ak sigh ‘ist -—j— -—@
s. suey \ 1 sue} 1 zB 1
| ™~, | jajyemues \ Jaemues a | (\ )
= - - - - ~ 7 —=—=—_—F
| oN | ‘ ' |
\ ~ \ ~- ' :
~ ae |
~ .
| | | |
1 a l ™s ~N:
NN, ~s
~.
~ .
~. |
~~ I :
' } ~ i
| | ~ I |
~
| | ao
l
eurmdissd) | _ |
| | .
Page 23
uBisag SeWSYoOS -
ue} J00]4 punoisy
DIN peas
a|leyoI, |aeyo!
LSVOO 3NIHSNNS
HOW3d SSIMNNS
LYNOD SSVdWOO
338
ass.
uss
NMHC!
feaosdde nour 10} panssi| s0°00'S1| 3
aamaIAzy
Sayan et InoU YA Wed UL 40 SfouN UT EUIADED WH) 40 Butkdod 50 989 39
30 WAukdes enn ere JeUNDED sy) UF PeUMUAS LOR MULOSU PUR sdedud:
BoREHUCIT 105 paces] ere pum KiBUINDOP peronuOOUN exe sBulmt
SNSS! VOREUIPIO-OS |eIMHONAS| Z0°01'BO} A
0000 =°N223roua av | waano| nme]
anssi[ aival agu
aanoudsy|
on 30
wEusdeo jo meWOBUUE UE seIMNsHOD I2eDAY BUS 10 HOH
svonsuunueS
Ja) IoNPHOHY OLN O1 pesteyes ag erU PeyEUTWOU jou suo!FUSWIP KuYy “fuO
oywonset3
somne
oy oF ogo #10 OM 50
0} sO1d O15 Uo PeNSeus eq OF exe TUC]sUPUITG “IBUjMELD WO2) OTROS JOU OG
a Ws 3,
Leo
So aes
usdps sequin
@Q
151. L518} 18). 1S1_1Sh USt_1s1_1S1
—H
I
\
{
einyess
adesspuey
SBS 9S 4
sere J2A0 JOOIL 9y@s9U09
€] ¥| Sj SI ~
6 <
g Neos
> = T |_i00) L
ate = ei [9 O00 Set ai Hl 9g |
Taneoin el
Jt 2 uyeq Ay pune ‘
! = : i
LLL uaul] | - ( )
zs -—apeaySnyery FSCO:
a | Se ABM SEE
® eds 000. St j r By 'giteas
Fi | f 5 ee
sus | FaqUUM. | | a iiete
at a —@
| JOA0 iOOY y
NN 2 : i
5 — a
Ne Herep . _ a
= NJ] JBAO JOO ~ ~~sieauibua creme i 4
jood:dey
~ 3 : 000 SS U 000 ss 1 S
te ~ g yedueo |- yadseo L
~. @ " Zz paq &
~ i z
~L s dn L
x _ = Gy 1 eis — ~ (9)
<I SI {JUS [00d / Jem emp g| 008 9s b I
~ a
N. | ~ Bujumel
NL > L -
eo @
NN. |
~ ~ ~ @ & ~~ ~ —V)
™~ T
t —_ 1 apeusnjeq ~ 4
NX, ~
Surusiyo3sid
00L rg HW
4BA0 JO01
Page 24
balustrade
@ —
balcony=aq rs
roof over
J mpr
carpet
. 1 58 000
TUT
joinery
Geek _
—n, 1158 000 ~
timber “™
ahaa
dinin,
roof over
outdoor kitchenette
J
Oo nat scale trom drawings. Dimensions are to be checked on site prior to
epancias to be brought to the attention of the
commencemant of work. Di
author.
Electronic drawings are uncontrolled documents and are Issued for information
only. Any dimensions not nominated must be raterred to the Architect for
confirmation.
The concepts and intarmation contained in this document are the copyright of
Use or copying of the document in whole or in part without the written
permission of the Architect constitutas an infringement of copyright.
Archi
APPROVED |REV jpATE [1s8UE
prawn | cHecx |
AF PROJECT No: 0000
B |08.10.07 |stuctural co-ordination issue
€ {15.10.07 fissued for meu approval
‘sSr
Sst
COMPASS COURT
SUNRISE BEACH
SUNSHINE COAST
Michae! Michelle
ist ist istgi tst ts7 tsT ts1
ts1 blocwork wall below '
| sesmen snes
DRAWING NAME
First Floor Plan
Schematic Design
40mm mcale:
12 Rosewoed Btreat Bardon
p (97) 3676 4208
e-cxall; [email protected]
1:100
Page 25
ry
orelimina
metal sheet
roof
outdoor
living
dwarf wall behind
outdoor dining
frameless glass pool fence
@®
feature wall
lwO2!
crete awt
driveway
4] dwartwalt
By north facing elevation
materials legend:
(aw awning
ty] plywood cladding - shadowclad
fRE]_ rendered blockwork
(we} +weatherboard
a] window tag
door tag
balustrade - semi framed glass
@ balustrade - frameless glass pool fence
balustrade - frameless glass
€> screen - timber screening
€ screen - operable aluminium screens
[seamen Live gaa 40mm scale: 1:100
|
Do not scale fram drawings. Dimensions are to be checkad on site prior to laPPROVED [Rev |oaTE jissuE DRAWN |cHECK | AF PROJECT No: 0000
commancament of work. Discrapancias to be brought to the attention of the 5 GE 70.07 suv Go-ordinabon iaove ‘oer 7 CUENT DRAWING NAME 32 Saawwoed ng Street Bardon A3
|__| 10.07 |issuad for meu approval sst : . . 2 OT) 2 2 pone 7
ectroni drawings are uncontrlieg documents and are issued (or Inormation REVIEWED COMPASS COURT Michael Michelle North Elevation — T
confirmation.
The concepts and information contained in this document ara the copyright st = [DRAWN
Architect. Uso or copying of the document in whois or in part without the written
SCOPE pise | puase [ owGNe. | REV. |
SUNRISE BEACH - Schematic Design :
permission of the Architect constitutes an infringement of copyright ISSR SUNSHINE COAST - - S$ D AA . 300 -0 1 Cc \
Page 26
dwarf wall 7 . /B\_©ast facing elevation eS De not scale fram drawings, Dimensions are to be checked on sito prior to commancament of work. Olscrepancies to be brought to the attention of the Electronic drawings are uncentrolled documants and are issued for information only. Any dimensions not nominated must be raterred to the Architect for ‘Tho concepts and information contained in this document are the copyright of Architect, Use or copying of the document in whole or in part without the written Permission of the Architect constitutes an infringement of copyright. tap pool perimeter wall J APPROVED |REV | DATE re gutter (RB) ISSUE B 08.10.07 | structural co-ordination issue 15.10.07 jissued for meu approval pe gutter N AF PROJECT No: 0000 oRORCT OMPASS COURT SUNRISE BEACH SUNSHINE COAST /B\ west facing elevation S materials legend: plywood cladding - shadowclad rendered blockwork balustrade - semi framed glass balustrade - frameless glass pool fence balustrade - frameless glass screen - timber screening screen - operable aluminium screens 006009@HEBE8 Michael Michelle email; elocks®bigpendnetec East/ West Elevation Schematic Design
Page 27
roof eaves fimns Shs co! Qo not scale from drawings. Dimensions are to be checked on site prior to commencement of work, Discrepancies to be brought to the attention of the author. APPROVED |Rev |DATE |15SUE B 98.10.07 syuctural co-ordination issue Electronic drawings are uncontrolled documents and are issued tor information © 118:10.07 [issued for meu approval only. Any dimensions sot nominated must ba retarred te the Architact for confirmation. ‘The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright. prawn |cHeck | AF PROJECT Nc: 0000 st sr PROJECT COMPASS COURT SUNRISE BEACH SUNSHINE COAST Michael Michelle materials legend: awning plywood cladding - shadowclad rendered blockwork weatherboard window tag door tag balustrade - semi framed glass balustrade - frameless glass pool fence balustrade - frameless glass screen - timber screening screen - operable aluminium screens 0000 0@8 REE | some tive eas 0mm acute: 42100 ORAWING HAE South Elevation : o2 ‘417 Resewoed Street Barden p (07) 3076 4208 o-mall; [email protected] Schematic Design
Page 28
xm LAND USE SECTION FEES oe NOOSA RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme’ Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Cha useCodeinpact , Snisistent G SO 521 Inconsistent 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period . 521 Operational Works - Landscaping 521 Bldg Work assessable against the Planning Scheme §21 or MooceMENT REVIEW Half Hour 522 One Hour 522 ADVERTISING Purchase Advertised Applications §23 JETTIES Jetty Application Fee 524 Jetty Bond 51 (Category 4) BONDS : Performance Bond . 51 (Category 9) SIGNS : Registration Fee : . 222 SE. H FEE . Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ 650 name: ViA ow AL AWvcret% ADDRESS: 22. Niece bas Si Rese V RGee 1S) FILENO: 7/2442 DATE: (8fte fo] o RECEIPT NO: VHRTVON Signature of TP Officer: (S Aree ws AUTHORITY NO: / 13[ 2207 [2,32 /
Used in these records
07/2132 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.