SITE PREPARATION NOTES:
.
13
10
52
NOTE: STABILITY & INTEGRITY OF
.
D · FOLLOWING BULK EXCAVATION AN APPROVED CBR15 MATERIAL SHALL BE IMPORTED
3
13
.8
EXISTING BOULDER RETAINING WALLS
0
0 2
W
SP195871 TO CONSTRUCT A WORKING PLATFORM A MINIMUM OF 150mm THICK. PLATFORM TO
.1
.9 1
13
BE COMPACTED TO 98% MOD (STD) AS1289 E1.1
E E TO BE MONITORED & ASSESSED
7 78
W
.8 2.
T
SP m
12
· THE PLATFORM SHALL BE ROLLED WITH A 15 TONNE ROLLER AND FLOODED USING
0 12 1
19 t DURING EARTHWORKS & SUBGRADE
D 75mm DIAMETER FIRE HOSE & SPEAR AND COMPACTED VIA HIGH ENERGYVIBRATION
5
.6
58 NCOMPACTION
13
BY AN EXPERIENCED CONTRACTOR. ANY LOOSE SUBGRADE SHALL BE EXCAVATED
13
95
1
7
.0
71
.3
.0 AND REPLACED WITH MATERIAL THAT WILL COMPACT TO AT LEAST THE STANDARD
.
13
13
13
13
MH D
4
72
.1 BELOW.
W
W
.
13
13
29
48
MH
T
E S · FILL FOR BENEATH THE SLAB SHALL BE CLEAN WHITE NATURAL SAND, FREE OF ANY
.
.
13
13
W ORGANIC MATTER OR ANY MATERIAL THAT WILL NOT FORM A STABLE FILL.
D
REFER TO DRAWING #04 S E
· PLACED IN 200mm MAX LAYERS AND COMPACTED TO A DENSITY INDEX OF 75% AS
E
W S DETERMINED BY TESTS E6.1 OF AS1289.
14
· ALL EXCAVATIONS TO BE BATTERED BACK AT THE MATERIAL'S ANGLE OF REPOSE AS
S
S D
S
E
Em DETERMINED BY GEOTECHNICAL ENGINEER OR SHORED VIA SHEET PILING OR
SP1 t S P
13
S OTHER APPROVED METHODS.
958 · SUBGRADE DENSITY TO BE VERIFIED BY DCP TESTING TO ENGINEERS DIRECTION
TEMPORARY 6m WIDE 71 MH PRIOR TO FOOTING CONSTRUCTION.
11
S
CONSTRUCTION ACCESS MH
D
10
SPA
EARTHWORKS NOTES:
7
02
12
EW
TO907-909
SWIMMING
REFER POOL
DWG
1. THE CONTRACTOR SHALL IMPLEMENT THE SEDIMENT CONTROL MEASURES DETAILED.
8
02
X
ALL PERIMETER CONTROL MEASURES SHALL BE INSTALLED PRIOR TO DISTURBANCE
EW
8
OF THE SITE.
2. THE CONTRACTOR IS TO ALLOW FOR STRIPPING AND STOCKPILING TOPSOIL FOR
15
X
FUTURE USE. REFER SEDIMENT AND EROSION CONTROL NOTES FOR TREATMENT
9
9 DETAILS.
EW 3. FILL IS TO BE PLACED IN ACCORDANCE WITH THE REQUIREMENTS OF AS 3798-1996
0 3
X
"GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS"
6 - LEVEL ONE (1) SUPERVISION AND TESTING.
EXISTING SHEET PILING AS EW 4. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS STANDARD
14
X
02 SPECIFICATION.
PART OF STAGE 4B WORKS
100 605
13
SP305332
X
EARTHWORKS PAD SP195871 SHEET PILING NOTES:
11
13
LEVEL RL9.85 (NOM) · ALL TEMPORARY AND PERMANENT SHEET PILING TO BE DESIGNED, DOCUMENTED
AND CERTIFIED BY THE SHEET PILING CONTRACTOR
X
10
10 · ALL SHEET PILING, WHALERS, GROUND ANCHORS ETC. TO BE DESIGNED IN
12
EW ACORDANCE WITH THE RELEVANT AUSTRALIAN STANDARDS, LOCAL AUTHORITY
7
0 3 REQUIREMENTS & PROVISIONS OF THE WORKPLACE HEALTH AND SAFETY ACT.
X
ALL WORKS TO BE CARRIED OUT IN STRICT · DESIGN LOADS DUE TO RETAINED SOIL, GROUND- WATER, ADJACENT STRUCTURES &
ACCORDANCE WITH APPROVED SETTLERS
8
SERVICES, SURCHARGES, CONSTRUCTION TRAFFIC ETC. ARE TO BE DETERMINED BY
EARTHWORKS PAD COVE NOOSA RESIDENTIAL HIGH DENSITY THE SHEET PILING CONTRACTOR IN LIASON WITH THE GEOTECHNICAL CONSULTANT
12
X
UP
LEVEL RL10.2 (NOM) 5 ENVIRONMENTAL MANAGEMENT PLAN (EMP1) & STRUCTURAL ENGINEER.
9
EW DATED 21 JULY 2005 BY WBM OCEANICS. · ALL EXISTING SERVICES TO BE LOCATED ON SITE BY THE SHEET PILING
02
CONTRACTOR. ANY DAMAGE CAUSED TO EXISTING SERVICES BY SHEET PILING
X
OPERATION ARE TO BE RECTIFIED BY THE SHEET PILING CONTRACTOR.
9 · THE SHEET PILING CONTRACTOR IS TO ASSESS THE LIKELIHOOD OF VIBRATION
DAMAGE OR OTHER DEGRADATION OF ADJACENT STRUCTURES, SERVICES ETC DUE
SP195871
X
LEGEND TO SHEET PILING OPERATIONS. ANY SUCH DAMAGE INCURRED IS TO BE RECTIFIED
AD ) AT THE SHEET PILING CONTRACTOR'S EXPENSE.
K S P OM PROPOSED EARTHWORKS CUT · THE SHEET PILING CONTRACTOR'S ENGINEER WILL PREPARE AND CERTIFY WORK
N
OR .0 (
12
X
22 A
11
HW L10 METHOD STATEMENTS WHICH DETAIL SEQUENTIAL PROCESSES FOR:
|
11
65
| |
| | R T R
EA VEL - SHEET PILE INSTALLATION
EW
| |
RP mt
12
LE PROPOSED EARTHWORKS FILL
10
03 - EXCAVATION
| |
EX
| |
20
14.0
| - ANCHOR INSTALLATION, TENSIONING & GROUTING
4
|
| |
| |
150mm COMPACTED GRAVEL · ALL WORKS SHALL BE CARRIED OUT INACCORDANCE WITH THE WORK METHOD
EW HARDSTAND CBR15
7
| |
02 STATEMENT
X
| | 13
· SHEET PILES TO BE INSTALLED PLUMB & WITHIN 50mm OF DESIGN PLAN ALIGNMENT
| |
| |
150mm CBR15 TEMPORARY PAVEMENT
12
| · VIBRATION MONITORING IN ACCORDANCE WITH AUSTRALIAN STANDARDS TO BE
3
8
14 CARRIED OUT DURING ALL SHEETPILING AND ANCHORING OPERATIONS.
X
13
X EW · MAXIMUM VIBRATION LIMITS OF 5MM/SEC TO BE ACHIEVED FOR ADJACENT
02 PROPOSED BASEMENT WALL ''EMERALD'' BUILDING
10
9
X TANK/PUMP ROOM
· CONTRACTOR TO INDEMNIFY PRINCIPLE AGAINST ANY ACTIONS ARISING FROM
14
X
EARTHWORKS PAD EXISTING SHEET PILING
X STRUCTURAL OR COSMETIC DAMAGE TO ''EMERALD'' BUILDING DUE TO
LEVEL RL8.2 (NOM)
(NO D
M)
CONSTRUCTION OPERATIONS.
A
RL1 KS P
X POOL AREA | | | | | | | | | | | | | |
PROPOSED TOP OF BATTER
X
EARTHWORKS PAD NOTE:
0.0
606
R
X PROPOSED TOE OF BATTER
LEV THWO
12
> >
03
LEVEL RL8.2 (NOM) > > > ALL SERVICES TO BE LOCATED BY CONTRACTOR ON SITE PRIOR TO CONSTRUCTION. ANY
EW
EW02
X PROPOSED SWALE DAMAGE TO EXISTING SERVICES TO BE RECTIFIED AT CONTRACTORS EXPENSE.
EL
SP195871
> >
AR
X
1
EW02
2
11 E
X FINISHED SURFACE CONTOUR
> >
12
|
HABITAT PROTECTION FENCE TO BE ERECTED
||
10
PRIOR TO COMMENCEMENT OF CLEARING WORKS X > > EXISTING SURFACE CONTOUR
LOT 9 - NETT EARTHWORKS VOLUMES
||
X6
PROVIDE SIGNAGE AT 50m SPACINGS " ECOLOGICAL
||
> > >
3m
X E EXISTING ELECTRICAL RETICULATION
||
RESTORATION AREA - NO ACCESS
E > > > | | | | | | | | | | | | | EARTHWORKS FILL (SOLID) = 296m³
|
X | | | |
T EXISTING TELSTRA See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 section
Section 2
RETICULATION
X
| | | |
7
|
9
CO SP195871 X X X X X
8
D EXISTING STORMWATER DRAINAGE EARTHWORKS CUT = 5500m³
N X X ALL BATTER GRADIENTS
ARE SERV 3m SHEET PILING TO EXTEND W EXISTING WATER RETICULATION
A (P ATIO 3m BEYOND RIPS TO BE CONFIRMED BY S EXISTING SEWER RETICULATION
NOTE: ALL QUANTITIES SOLID COMPACTED IN GROUND. VOLUMES HAVE BEEN
OS
CW N APPROX. 21m CALCULATED FROM EXISTING SURFACE TO EARTHWORKS PAD LEVEL (VOLUMES
GEOTECHNICAL INCLUDE ADDITIONAL EXCAVATION REQUIRED FOR CBR15 MATERIAL AND
P) BUND RL9.25MIN
X X
HABITAT FENCE
ENGINEER'S ONSITE EXCAVATION FOR TEMPORARY BATTERS
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. Design: PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511
EARTHWORKS LAYOUT
FOR APPROVAL Date: JUNE 2021
26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked: . . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/22/L9/EW01 C 1 of 3
C 23/08/2022 RFI RESPONSE SS S.H. Email: [email protected]
STEVEN HARRISON
B
A
01/07/2022
20/06/2022
EARTHWORKS VOLUMES ADDED
ISSUE FOR APPROVAL
PBL
PBL
SKH
S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6107-22-L9-EW01.dwg - DATE : 2/9/22 - 11:39am - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPECouncil Ref:
LOWER; X-LANDSCAPE UPPER; 2017008 landscape base
Used in these records
A6107-22-L9-EW01 [C] EARTHWORKS LAYOUT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 904 KB (small file)
- File type
No other editions are linked here.