Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix E - Geotechnical Report

Attached to the e-mail Applicant advises of Referral - RAL19/0008.

of 38

Page text shows just the words. Original shows the document exactly as it was published.

                            PROPOSED RECONFIGURATION OF A LOT
                            216 BLACK MOUNTAIN ROAD, BLACK MOUNTAIN

       To evenly distribute wastewater throughout the irrigation area, a pressure equalisation system
        should be installed.
       Construct irrigation laterals parallel with the natural ground surface contours.
       Erect signage at the boundaries of the area in at least two places in accordance with Council
        requirements to warn people regarding the presence of wastewater pipes (e.g. “Sewage Effluent
        Pipework Installed Below – DO NOT DIG” or “Recycled Water – Avoid Contact - DO NOT DRINK”).
Detailed design of the effluent disposal systems must be carried out by an NC Registered Evaluator to
accompany the plumbing application at the building stage.

8.3.4       Maintenance and Inspection
To comply with NC requirements, the following management and inspection shall be implemented once the
effluent disposal systems are established:

       Continuous monitoring by the property owner for any signs of system failure such as septic odour,
        seepage, soil and/or plant discolouration.
       Should any signs of system failure be observed by the property owner, including the in-built HSTP
        failure alarm, the manufacturer shall be contacted immediately to arrange for the necessary repairs.
       Quarterly inspection, testing and repair (if necessary) to the HSTP and irrigation area by a Licensed
        Inspector (normally a service provided by the HSTP manufacturer).



9.0      LIMITATIONS
Your attention is drawn to the document “Limitations”, which is included in Appendix D of this report. The
statements presented in this document are intended to advise you of what your realistic expectations of this
report should be, and to present you with recommendations on how to minimise the risks associated with the
services provided by Tectonic for this project.




19 June 2018
Report No. 17427-001-Rev0                             14
Log in to download the original file

Appendix E - Geotechnical Report.pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.