Original source · versioned page text
Decision Notice MCU13/0052
Officer: Jack Lewis Direct Telephone: 07 5329 6236 Fax: 07 5329 6501 Our Reference: MCU13/0052 Your Reference: Not Provided 30 January 2014 NBN Co Ltd C/- Aurecon Locked Bag 331 BRISBANE QLD 4001 Dear Sir/Madam Decision Notice Sustainable Planning Act 2009 I refer to your application and advise that on 29 January 2014, Council decided to approve the application in full subject to conditions. Details of the decision are as follows: application details Application No: MCU13/0052 Street Address: 153 Lake Flat Rd BOREEN POINT QLD 4565 Real Property Description: Lot 2 RP 126723 Planning Scheme: The Noosa Plan (8 August 2011) Decision details The following type of approval has been issued: Development Permit for Material Change of Use - Service & Utility Type 3 Tower Relevant period of approval The relevant period for this development approval is 4 years starting the day that this development approval takes effect. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice Building Height The maximum height of the structure must not exceed 41 metres above the finished ground level and the natural ground surface, unless otherwise approved in writing by council to allow co-location for a low impact facility. Certification must be submitted to Council from a Licensed Surveyor which certifies that the monopole structure does not exceed the maximum height requirement of this Decision Notice. No lights are permitted to be attached to the telecommunications facility, except where required for aircraft hazard lighting purposes or similar. Health and Safety The development must not, at any time during the life of the development, result in human exposure to environmental electromagnetic emissions exceeding the current regulations, standards and/or recommendations of the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure must provide, at any time upon request by Council, written certification to demonstrate compliance with this condition. The written certification must assume: a maximum number of users over the lifetime of any pole or other supporting structure full power usage a maximum down tilt of antennae. Warning information signs and security fencing must be provided on the site to prevent unauthorised entry. Fencing must be set back a minimum of 2 metres from the front boundary and must be camouflaged through the use of colours, materials and screening vegetation to blend the fence into the visual landscape. Any proposed new fencing to delineate lease area boundaries must be constructed to allow for the movement of fauna. Such fencing must not include any use of barbed wire or similar materials. Colours and Finishes The monopole and associated panels must be finished in colours that blend in visually into the landscape. Cessation of Use The telecommunications facility must be removed from the site upon cessation of the use. LANDSCAPE & ECOLOGY Existing Vegetation Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. referral agencies Not Applicable approved plans The following plans are Approved Plans for the development: Approved Plans Plan No. Rev. Plan Name Date 4POM-51-36-BPN-C2 02 Overall Site Plan, prepared by Aurecon 20/02/2013 4POM-51-36- BPN -C3 02 Site Setout Plan, prepared by Aurecon 20/02/2013 4POM-51-36- BPN -C4 02 Site Elevation and Details, prepared by Aurecon 20/02/2013 referenced documents Not Applicable Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Equitable Access and Facilities The plans for the proposed building work have NOT been assessed for compliance with the requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the Building Code of Australia – Part D3 as they relate to people with disabilities, one or both of the following may impact on the proposed building work: the Disability Discrimination Act 1992 (Commonwealth); and Anti-Discrimination Act 1991 (Queensland). Sunshine Coast Regional Council recommends that the following matters be considered to address equitable access and facilities in the building: the building and environs should be designed to meet the requirements of the Human Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS 1428.2; applicants should be aware that a “Disability Standard on Access to premises” is currently being developed and most likely will impose changes on the Building Code of Australia; and any services and facilities in the building complex should allow independent, dignified and equitable use of the services and facilities for all people. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act. property notes Not Applicable preliminary approval overriding planning scheme Not Applicable further development permits required Development Permit for Building Work self assessable codes Not Applicable submissions Not Applicable reasons/grounds for approval The Assessment Manager considers the decision conflicts with the planning scheme and the following are sufficient grounds to justify the decision despite the conflict: The telecommunications facility will provide coverage for the NBN fixed wireless network, allowing for the delivery of higher speed data to rural residential households in the area; and The proposal will not significantly impact on the visual or residential amenity of the locality and is screened by substantial vegetation buffers. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.) OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices. Yours faithfully denis wallace senior development planner Enc: Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7). MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS Division 8 Appeals to court relating to development applications and approvals 461 Appeals by applicants (1) An applicant for a development application may appeal to the court against any of the following— (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after— (a) if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise—the day a decision notice was required to be given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. 462 Appeals by submitters—general (1) A submitter for a development application may appeal to the court only against— (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327. (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following— (a) the giving of a development approval; (b) any provision of the approval including— (i) a condition of, or lack of condition for, the approval; or (ii) the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter— (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii). (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to— (a) if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or (b) if the prescribed concurrence agency is the chief executive (fisheries)—development that is— (i) a material change of use of premises for aquaculture; or (ii) operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment— (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2). 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about— (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision. 465 Appeals about decisions relating to extensions for approvals (1) For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. 467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency (1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. [word/footer1.xml] Page 7 of 7 [word/footer2.xml] Page 1 of 7 [word/header1.xml] MCU13/0052 [Attachment: image2.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.