Original source · versioned page text
MCU14/0106 & OPW15/0001 Town Planning Report & Appendix A Code Compliance
Original PDF page 47, section 1. The text section number identifies this passage in the reader.
Town Planning Report
28 Eenie Creek Road, Noosaville and parts of the road reserves of Hofmann Drive and Walter Hay Drive
SEQ Regional Plan Applicant’s Response
planning to coordinate future development with
infrastructure delivery.
8.11 Rural residential development Not Applicable
Contain and limit areas allocated for rural residential The proposed development is not rural residential
development to ensure efficient provision of services development.
and infrastructure and limit further land fragmentation
6.5 State Development Assessment Provisions
6.5.1 Module 10.1 Tidal Works, or Development in a Coastal Management District State Code
The proposed development achieves compliance with all applicable Acceptable Outcomes of the Tidal Works,
or Development in a Coastal Management District State Code.
The proposal therefore achieves compliance with all Performance Outcomes and Overall Outcomes and
subsequently the purpose of the Tidal Works, or Development in a Coastal Management District State Code.
6.5.2 Module 17.1 Public Passenger Transport State Code
The proposed development achieves compliance with most of the applicable Acceptable Outcomes of the
Public Passenger Transport State Code. The proposed development does not comply with Acceptable
Outcome AO8.1 and an alternative outcome is proposed in this instance. In all other instances alternative
outcomes are only proposed where an applicable Acceptable Outcome is not provided. All alternative
outcomes provided demonstrate that the proposal complies with the corresponding Performance Outcome.
The proposal therefore achieves compliance with all Performance Outcomes and Overall Outcomes and
subsequently the purpose of the Public Passenger Transport State Code.
6.5.3 Module 18.1 Filling, Excavation and Structures State Code
The proposed development achieves compliance, or can achieve compliance, with all applicable Acceptable
Outcomes of the Filling, Excavation and Structures State Code.
Alternative outcomes are only proposed where an applicable Acceptable Outcome is not provided. All
alternative outcomes provided demonstrate that the proposal complies with the corresponding Performance
Outcome.
The proposal therefore achieves compliance with all Performance Outcomes and Overall Outcomes and
subsequently the purpose of the Filling, Excavation and Structures State Code.
6.5.4 Module 18.2 Stormwater and Drainage Impacts on State Transport Infrastructure State
Code
The proposed development achieves compliance with all applicable Acceptable Outcomes of the Stormwater
and Drainage Impacts on State Transport Infrastructure State Code.
Alternative outcomes are only proposed where an applicable Acceptable Outcome is not provided. All
alternative outcomes provided demonstrate that the proposal complies with the corresponding Performance
Outcome.
The proposal therefore achieves compliance with all Performance Outcomes and Overall Outcomes and
subsequently the purpose of the Stormwater and Drainage Impacts on State Transport Infrastructure State
Code.
6.5.5 Module 19.2 Transport Infrastructure and Network Design State Code
The proposed development achieves compliance with all applicable Acceptable Outcomes of the Transport
Infrastructure and Network Design State Code.
Alternative outcomes are only proposed where an applicable Acceptable Outcome is not provided.
All alternative outcomes provided demonstrate that the proposal complies with the corresponding Performance
Outcome.
December 2014 Cardno HRP 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.