Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                RECONFIGURATION OF LOT 136
                                        ON MCH978

                               STORMWATER TREATMENT AND
                              WATER QUALITY MANAGEMENT PLAN
                                            FOR

                                       VALKEV PTY LTD

                                         APRIL 2014




Civil, Environmental &
Hydraulic Engineers
A.B.N. 45140292324
8/41 Sunshine Beach Rd
Noosa Junction Q 4567
Telephone (07) 54749081
Facsimile (07) 54749041
Job No:   1225
www.callaghanandtoth.com.au
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 89 pages

Page 2

                                                                                                              Callaghan & Toth

                                                DOCUMENT HISTORY

Document Reference:                                No: 1225_SMP_Master.doc

Project Manager:                                   Alex McWilliam

Author:                                            Lex Toth NPER3 (ENV) (CIVIL) RPEQ 6069 CPESC

Reviewer:                                          Jane Davissen BE (ENV)

Client:                                            Kevin and Val Kelly

Contact Person:                                    Alex McWilliam (07 54 555425)




DISTRIBUTION LIST

                                                     POSITION ON
       NAME               ORGANIZATION                                           REVISION         REVISION             REVISION
                                                   MANAGEMENT TEAM
                                                                                    0                1                    2

 Kevin and Val Kelly        Valkev Pty Ltd                  Client


   Jane Davissen          Callaghan & Toth                  Author


   Alex McWilliam        McWilliam Property           Project Manager


   Max Watterson          Max Watterson &                  Planner
                            Associates


                            Noosa Council            Assessment Officer




REVISION LIST

        REVISION                    DATE DISTRIBUTED                       ISSUED BY                        CHECKED BY




             The information contained in this report is confidential and proprietary to Callaghan and Toth. It may
             only be used by the person to whom it is provided, for the stated purpose for which it is provided, and
              must not be imparted to any third person without the prior written approval of Callaghan and Toth.
               Callaghan and Toth reserve all legal rights and remedies in relation to infringement of its rights in
                                             respect of its confidential information.
                                                ©Callaghan & Toth
                                                       2014




55 Lake MacDonald Drive – Stage 1 to 5                                                                                       pg. 2

Page 3

                                                                                                     Callaghan & Toth


CONTENTS

1.  SUMMARY ............................................................................................................... 5
2.  INTRODUCTION...................................................................................................... 6
3.  SITE DESCRIPTION................................................................................................ 8
  3.1 Proposed Works................................................................................................. 8
4. WATER QUALITY MANAGEMENT PLAN ............................................................. 12
  4.1 Proposed On-Site Stormwater Treatment Process .......................................... 12
  4.2 MUSIC Model ................................................................................................... 12
    4.2.1 Source Nodes ............................................................................................ 12
    4.2.2 Treatment Nodes ....................................................................................... 14
    4.2.3 Rainfall Data .............................................................................................. 15
  4.3 MUSIC Modelling Results ................................................................................ 16
    4.3.1 Water Quality Objectives ........................................................................... 16
    4.3.2 Assessment of Results .............................................................................. 16
  4.4 TREATMENT DEVICES DESIGN DETAILS .................................................... 17
5. FLOODING ASSESSMENT SUMMARY ................................................................ 21
  5.1 Existing Conditions ........................................................................................... 21
  5.2 Proposed Drainage System ............................................................................. 21
  5.3 Western Tributary ............................................................................................. 22
INSERT DRAWING NUMBER 1225-33 ........................................................................ 23
6. CONCLUSIONS & RECOMMENDATIONS ........................................................... 24
APPENDIX 1     - Preliminary Stormwater Quality Management Plan.......................... A
APPENDIX 2     - MUSIC Results ................................................................................ B
APPENDIX 3     - Site Photos ...................................................................................... C
APPENDIX 4     - BSM Flood Report ........................................................................... F




55 Lake MacDonald Drive – Stage 1 to 5                                                                             pg. 3

Page 4

                                                                              Callaghan & Toth

LIST OF REFERENCES

1.       Department of State Development, Infrastructure and Planning, “State Planning Policy”,
         December 2013
2.       Engineers Australia, “Australian Runoff Quality Guidelines”, 2006.
3.       Healthy Waterways, “Water Sensitive Urban Design Technical Design Guidelines for
         South East Queensland”, 2006.
4.       Water by Design, “MUSIC Modelling Guidelines for South East Queensland” – Version
         1, December 2010.
5.       Water by Design, “Deemed to Comply Solutions – Stormwater Quality Management
         (South East Queensland)”, Version 1.0 May 2010
6.       Wong, T., Breen, P. & Lloyd, S., “Water Sensitive Road Design – Design Options for
         Improving Stormwater Quality of Road Runoff. CRC for Catchment Hydrology Technical
         Report No 00/1”, 2000.


LIST OF FIGURES

Figure 1.1                  Site Location Plan……………………………………………………………...7
Drawing 1225-50             Reconfiguration Layout Plan………………………………………………….9
Figure 3.1                  Stormwater Layout – Stage 1, 2, 3 & 5.……………………………… ……10
Figure 3.2                  Stormwater Layout – Stage 4…. …………………………………………...11
Figure 4.1                  MUSIC Model for the Proposed Development…………………………….13
Figure 4.2                  Typical Bioretention Basin Detail…..……………………………………….19
Figure 4.3                  Typical Kerbside Basin and Raingarden Detail……………………………20
Drawing 1225-33             Riparian Zones Stage 3 and 5………………………………………………23



LIST OF TABLES

Table 4.1                   MUSIC Catchment Areas……………………………………………………14
Table 4.2                   Comparison of Load Reductions……………………………………………16
Table 4.3                   Design Features of Stormwater Treatment Systems……………………..20
Table 5.1                   Pre-Development and Post Development Discharges……………………21




55 Lake MacDonald Drive – Stage 1 to 5                                                  pg. 4

Page 5

                                                                             Callaghan & Toth


1.       SUMMARY
The key points of this investigation are as follows:
   1. Runoff from new roadways, footpaths and allotments is to be cleaned of nutrients and
      gross pollutants via a stormwater treatment system prior to being released to existing
      waterways.
   2. The stormwater treatment system includes:
                   a. One small Bioretention Basin (already completed for Stage 1)
                   b. Two medium Bioretention Basins located in park,
                   c. Three small Roadside Bio Basins,
                   d. Two Bioretention swales,
                   e. Three Raingardens for Lots 26, 27 & 28, and
                   f. One Grassed Buffer.
   3. The increase in pollutant loads due to the increase in impervious areas is to be
      attenuated.
   4. Stormwater Detention is to achieve no increase in runoff concentration by the following
      measures:
                   a. Riparian vegetation planting to attenuate flood flows:
                   b. Pedestrian bridge over the eastern tributary (off Lake MacDonald Drive)
                       to attenuate flows;
                   c. Detention storage in Bioretention Basin 2 and 3;
                   d. Reshaping of the western tributary (off Blue Wren Place) to provide
                       greater flood storage.




55 Lake MacDonald Drive – Stage 1 to 5                                                 pg. 5

Page 6

                                                                                Callaghan & Toth


2.       INTRODUCTION
This Stormwater Quality Management Plan (SWQMP) has been prepared in response to
Information Requests for the following applications:
1. Reconfigure a Lot application (REC13/0146) at 55 Lake MacDonald Drive, Cooroy, and
2. Preliminary Approval for Material Change of Use (MCU 13/0226) and Reconfigure a Lot
    (REC 13/0148) at Pearsons Rd, Cooroy.

Each of the issued Information Requests by the then Sunshine Coast Regional Council,
requested an overall Stormwater Quality Management Plan showing how stormwater from both
developments will be treated to meet current best practice load based reduction targets and
drainage requirements. As such this Stormwater Management Plan (SWQMP) has been
prepared in accordance with the:
        Water Sensitive Design Code in the Noosa Plan;
        Water Sensitive Urban Design Technical Design Guidelines for South East
           Queensland, published by Health Waterways; and
        Environmental Protection (Water) Policy 2008.

The lots contributing to the overall development and subject to this report are shown in Site
Location Plan, Figure 1.1 and are described as follows:
1. Lot 136 and Lot 137 on MCH978 and Lot 1 on RP173883 located at 55 Lake MacDonald
   Drive – which is reconfigured into 32 lots of which Stage 1 (four lots) and Stage 2 (3 lots)
   have been approved, and
2. Lot 135 on MCH978 located at Pearsons Road Cooroy – will be reconfigured into 25 lots.

This SWQMP considers the new hardstand areas, including roadways, footpaths, allotments,
and new roof areas for the proposed 57 lots. This report also aims to demonstrate that the
proposal complies with relevant codes and guidelines and that the storm water runoff will not
change the surrounding hydrology. The Model for Urban Stormwater Improvement
Conceptualization (MUSIC) has been used to assess the suitability of various treatment devices
and to model existing and predicted pollution export loads and concentrations from the
development areas.




55 Lake MacDonald Drive – Stage 1 to 5                                                     pg. 6

Page 7

 

°saDr

. %
S,
3
«
o
2
=
5
& G
& §
S
3
Ma,
My
Rive,
600m
nes

WherelS 4. 92019

 

 

 

 

 

 

s Kensingt,
= %
= 2
&
>
=
£ © SITE OF
2 "ke oy WORKS
e
Ss
2
Ss
a
Q
gD
%
%
oho Fri
&
%
2
q Sa e s ae
i Pphire-st ws
2
= PeartSt

 

Peartla

 

<dhep
Rigg,
le.
6
¥

 

S
2
>
§
s
@
=
=
y N
Finer,
Ga
aA
6
3
&
Shon
ompst ewantin’ Rd im =e Gurnty
ER Co o79|
>
&
¢
mrs?

 

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers

8/41 Sunshine Beach Road

PO BOX 2305

NOOSA HEADS 4567

Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au

W

 

project

57 LOTS

location

RESIDENTIAL RECONFIGURATION

55 LAKE MACDONALD DRIVE / PEARSONS ROAD

COOROY

SITE LOCATION PLAN

Figure 1.1

 

 

Source: WHEREIS Map

Scale: NTS Date: APRIL 2014

 

Page 7

 

Page 8

                                                                                  Callaghan & Toth


3.       SITE DESCRIPTION
The site consists of four (4) rural lots which are mostly cleared land for rural pursuits. The site
is bounded by Lake MacDonald Drive to the south-east, residential development to the south-
west and north.

Two watercourses run through the site as shown on Drawing Number 1225-50 Revision A.
The watercourses join just downstream of this development and eventually flow to Six Mile
Creek, a tributary of the Mary River. This site is subject to the ponding of floodwaters. The Q100
year ARI flood levels indicate that the extent of flooding does not impact on the proposed lots,
as shown in BSM Flood Report in Appendix 4.

The Cooroy and Lake MacDonald Biodiversity Overlay (Map OM3.1) from the Noosa Plan also
shows that these watercourses are subject to Riparian Buffer Areas along most of their lengths.

These two watercourses are tributaries of Six Mile Creek and shall hereafter be described as
the eastern and western tributaries (see Drawing Number 1225-50).


3.1      Proposed Works

The overall proposal is to reconfigure these four lots into a total of 57 lots. The overall
reconfiguration will include:

        Construction of new roads;
        Construction of pathways;
        Allotment shaping;
        Dedication of parkland – active and passive, including riparian buffer areas; and
        Construction and provision of services.

As a result of these works stormwater drainage and treatment devices are required to drain the
site, attenuate flows and treat stormwater runoff to acceptable levels.

Figure 3.1 shows the stormwater layout for Stage 1 and 2 (already completed), Stage 3 and
Stage 5 while Figure 3.2 shows the stormwater layout for Stage 4.




55 Lake MacDonald Drive – Stage 1 to 5                                                        pg. 8

Page 9

                                                                                      Civil, Environmental &
                                                                                      Hydraulic Engineers




                                          SEDIMENT AND EROSION CONTROL
                                          Sedimentation Controls shall comply with
                                          the requirements of,
                                          "MANUAL FOR EROSION AND SEDIMENT
                                          CONTROL, MAROOCHY SHIRE COUNCIL"
                         (MESC, 2007) which can be accessed on the
                                          Councils external internet site.

energex   
                                          Works Standards refer to,
                                          "Contract Standards for Erosion and
                                           Sediment Control on Construction Sites."

Page 10

 

 

 

LEGEND STAGED WORKS

 

STAGE 1 WORKS AREA - OPW13/0417

STAGE 2 WORKS AREA — OPW13/0616
STAGE 3 WORKS AREA
STAGE 4 & 5 WORKS AREA

 

 

 

 

  

ROAD IS TOO FLAT FOR KERB,
2m OFF EDGE OF SHOULDER.

 

INSTALL TYPE 22 CONCRETE INVERT
TURF EITHER SIDE OF INVERT.

 

 

  
 
 
  
  
  
   
   

 

  

RP20685

+TUBE STOCK

MULCH & REVEGETATION

0.1m DEEP COARSE SAND

TRANSITION LAYER (0.5mm-2mm) ——_—L |

0.15m MINIMUM DEEP S-2mm WASHED SCREENINGS &
SLOTTED RIGID SEEPAGE PIPES & 0.5% MIN GRADE.

 
  

LEGEND:

 

SW

 

 

+

 

 

+ ee

 

  

 

 

EXISTING FLOWS TO ADJACENT LOT ARE ATTENUATED TO
PRE-DEVELOPMENT LEVELS BY REMOVING Q5 FLOW TO
BIO-RETENTION BASIN FOR TREATMENT. OVERLAND FLOW

CONTAINED BETWEEN LOTS 39 &40.

 

 

 

NTS

rE

36

 

 

SAG PITS TO TAKE Q5, OVERFLOW TO
FLOW PATH BETWEEN LOTS 39/40

 

 

sw
sy

 

INTERLOT STORMWATER PITS |]
TO CATER FOR ADJACENT
LOTS 3 & 4 RP206856

 

 

 

=

a

 

 

 

 

|

=

A

SW,

5
RP206856

 

RPI0635EG | BUS STOP_HARDSTAND TO TRANSLINK ’REGULAR STOP”
REQUIREMENTS. 4mx4m CONCRETE HARDSTAND
150mm ABOVE GROUND LEVEL. WIDEN SHOULDER TO
3m WITH TAPERS IN ACCORDANCE WITH TRANSLINK
REQUIREMENTS.

|
—~| 0.80 1.20 ++ 1.00 +++ 1.20 --| FLUSH KERB
TS2000 SAND ROAD EDGE

 
   

TOPSOIL & TURF
@8/sqm

 

LOW POINT OF LOT 5 RP206856,
LOCATION OF FUTURE STORMWATER
DRAINAGE THROUGH LOT 12 RP134343

 

 

  
  

 

 

 

 

LINED BIO SWALE

SCALE NTS.

12
RP1 54343

35

Ss
634 3

—_ Lo
&

Tee

<—

ROAD 3 >
STAGE 4

 

 

 

 

 

 

 

fe %
Cos
6
SP218739

Sp

=
GR

ae

 

— Faioo

NNN

   
 
  
 
 
  
 
 
     

         
 

PROPOSED STORMWATER PIPE

PROPOSED INTERLOT DRAINAGE PIPE WITH
RAINGARDEN

PROPOSED INTERLOT DRAINAGE PIPE
WITH PITS

PROPOSED BIORETENTION BASIN

( Callaghan & Toth )

Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road

Phone 54749081, Fax 54749041

www.callaghanandtoth.com.au

i!

=|

 

TO TYPICAL DETAIL FIGURE 4.2

designed | ADT datum AHD DERIVED

 

drawn BM cM

 

PROPOSED BIORETENTION SWALE TO

 

PS
checked | AH Origin (B.M.) RL *

 

TYPICAL SECTION SHOWN BELOW

PROPOSED GULLY PIT WITH

 

approved

 

BIORETENTION
EXISTING/PROPOSED FLOW DIRECTION

PROPOSED LAY BACK TYPE KERB M1/M4 TO
IPWEAQ STD DWG R-0080

PROPOSED FLUSH KERB ER2 TO IPWEAQ STD
DWG R-0080

FINAL Q100 FLOOD LINE
EXISTING TOP OF BANK

EXISTING TREE

EXISTING TREE LINE

 

PREVIOUS ROAD
RESERVE. BDY

   

 

 

   
 
 
  

 

SURVEYED _BY
MAX WATTERSION & ASSOCIATES

PHONE 54 426 121
a

(SS

project

PROPOSED 57 LOT SUBDMSION
55 LAKE MacDONALD DRIVE
COOROY

_O————————L—L————,
Client

VALKEV PTY LTD

$d

_O——————————L————,
title

STAGE 4 STORMWATER MASTER

PN

_—_—————————————————————.

LOT 136 on MCH978

Parish of TEWANTIN

County of MARCH

SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD

Ce )

_—————————————————
SCALE

 

 

 

 

 

 

 

 

0 5 10 15 20 25 een 50
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) D0_NOT SCALE FROM THIS DRAWING

USE ONLY DIMENSIONS PROVIDED

REVISIONS
detai

FILES

 

 

COMPUTER DIRECTORY

 

X:\JOBS\CT Projects in progress\1225 30 lots
lake MacDonald Drive\\Design\Current_DWG—BASE

 

FIGURE 3.1

 

Sheet 2 of 10 sheets

 

drawing number

PAGE 10

 

 

 

 

date 10-3-14

 

 

 

 

Page 11

 

 

 

 

 

 

 

 

   
   

5.
2
o/AhZ,
8 ar
SH BIO-RETENTION SWALE,
REFER TYPICAL CROSS 31

BIO_BASIN 2 SECTION ON FIGURE 3.1 rLtot.25
211m? FILTER BIO SWALE 2 82m? FILTER —
SURFACE AREA. bo, YC SURFACE AREA. LENGTH 70m f |
FIGURE 4.2 243 Py j E

 

DES

.

 

“3 >=
[|

 

-~--- WESTERN TRIBUTARY

 

 

 

 

SS ROAD RAINGARDEN
x= Ue 2 FIGURE 4.3
Ne
Ew

+

 

 

 

ROAD RAINGARDEN 1
PART A FIGURE 4.3

|

21

  

 

 

 

   

 

PART B FIGURE 4.3

ROAD RAINGARDEN 1

  
  
   

 

 

 

    

| x ( ~\
17 j \ | Callaghan & Toth
|
\ \ {8 Civil, Environmental &
y | Hydraulic Engineers
|
EXISTING INTERLOT Noosk HEADS ‘387
STORMWATER PITS CATER i! 8/41 Sunshine Beach Road
FOR ADJACENT LOTS =| Phone 54749081, Fox 54749041
a www.callaghanandtoth.com.au
vo enn designed [ADI] datum AND DERWED
| [arown BM ' PSM *
checked | AH | Origin (B.M.) RL *
approved
SURVEYED BY

=

as

1 =
2

RP173883 5
+

INTERLOT STORMWATER PIT
TO CATER FOR ADJACENT
LOT 1_RP173883

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 
 

  

 

 

 

 

22

 

 

 

 

 

 

 

L
BIO—RETENTION SWALE,
REFER TYPICAL CROSS
SECTION ON FIGURE 3.1

BIO SWALE 1 97m’ FILTER
SURFACE AREA. LENGTH 80m

ia H

  

 

 

 

 

 

 

 

 

 

STAGE 3 Ly

Lo
SY

 
 

   

 

Ww
RAIN GARDENS TO
LOTS 26, 27 & 5
28 ON FIGURE 4.3
—_9T0r

 

   

   
 
 
  

 

  

 

 

 

SS «| | COOROY
JN J
7 VR
Client
SINCE? £77)" |) VALKEV PTY LID
Y Nan
4 tr.
title
STAGE 1,2,3 & 5 STORMWATER
MASTER PLAN
EXISTING NS
INTER-ALLOTMENT ——————
STORMWATER

 

 

 

 

 

 

 

MAX WATTERSION & ASSOCIATES
PHONE 54 426 121

(SS
project
PROPOSED 57 LOT SUBDMSION
55 LAKE MacDONALD DRIVE

LOT 136 on MCH978

Parish of TEWANTIN
County of MARCH

SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

4 BIO BASIN 3
150m’ FILTER
SURFACE AREA
FIGURE 4.2
FrLjo1.35 PS 5 909 KC —i‘“‘Cs‘“‘s‘—s—sSYS
KAS ¥ ————————
26 ae gs QL EEE oh ORS SCALE
= 0 5 10 15 20 25 Meters 50
fi
s scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
J SES 1:1000(A3) D0_NOT SCALE FROM THIS DRAWING
— USE ONLY DIMENSIONS PROVIDED
101, ce"
REVISIONS
5 *
r deta
=|
‘
AA .
= ai
S
os oN BIO Te
a oe
g a
‘Y : Va FILES
\ ‘ ATER ALLOTMENT ea COMPUTER DIRECTORY
. STORMWATER * aN LEGEND STAGED WORKS X:\JOBS\CT Projects in progress\1225 30 lots
, + © Take MacDonald Drive\Design\current_DWG—BASE
Tyger 2 Paw CT STAGE 1 WORKS AREA — OPW13/0417
° Ab Stace 1 Shep eee FIGURE 3.2
fe | | STAGE 2 WORKS AREA — OPW13/0616
Sheet 2 of 10 sheets
| STAGE 3 WORKS AREA PACE 11
*

ght
ROADSIDE BIO BASINS |

 

 

 

 

 

4
& wr a;
oe
© S.
EXISTING 18739 ‘ w
INTER—ALLOTMENT
STORMWATER 1 RS BBIA = 10m?
Pa, 3 RS BBIB = 15m? STAGE 4 & 5 WORKS AREA
Ly RS BB2 = 10m date 10-3-14

 

 

 

Page 12

                                                                               Callaghan & Toth

4.       WATER QUALITY MANAGEMENT PLAN
4.1      Proposed On-Site Stormwater Treatment Process

The developed site was divided into MUSIC model sub-catchments as shown on Figure 4.1.
The proposed stormwater treatment train for the overall development site is illustrated on
Figure 3.1 and Figure 3.2 and are described below:
       a. One small Bioretention Basin (BioBasin 1)(already completed for Stage 1 i.e. Lots 1
           to 4),
       b. Two medium Bioretention Basins located in parkland treating runoff as follows:
              i. BioBasin 3 – Stages 2 and 5 i.e. Lots 5 to 16 and associated road reserve, and
             ii. BioBasin 2 – Stage 4 i.e. Lot 33 to 57.
       c. Three small Roadside Bio Basins (1a, 1b and 2) treating runoff from Lots 21 to 25
           and associated road reserve (part of Stage 3),
       d. Two Bioretention swales treating runoff from Lots 17,19,20,29 to 32 and associated
           road reserve (part of Stage 3),
       e. Three Raingardens for Lots 26, 27 & 28 (part of Stage 3), and
       f. A grassed buffer to treat sheet flow of road connecting Stage 3 to Blue Wren Place.

BioBasin 3 is located within the new Passive Parkland Area and discharges into the eastern
tributary. The three (3) raingardens will be located within the lots which they are treating and
also discharges into the eastern tributary
.
BioBasin 2 is located within the new Passive Parkland Area, the small roadside Bio Basins and
the swales are located along the new roadway off Blue Wren Court and these systems all
discharge into the western tributary.

The bio-retention component of these treatment systems will remove the nutrients, heavy
metals, and retard flow.

4.2      MUSIC Model
4.2.1 Source Nodes

Catchment areas of source nodes within the proposed development have been identified as
sub-catchments such as roofs, yard, road and verge. MUSIC allows for characteristics of these
source nodes to be amended to ensure that accurate pollution generation and hydraulic
characteristics for each sub-catchment are used to generate stormwater runoff within the
model. Table 4.1 below details the sub-catchments used in the MUSIC model, land use,
percent imperviousness and area of each sub-catchment. The MUSIC Modelling Guidelines for
South-East Queensland – Version 1 December 2010 have been used to set level of
imperviousness. The urban residential pollutant export parameters within the guidelines have
been used for each node.

The site has also been divided into three (3) main discharge points and modelled as such,
being
     Lots 1 to 16, and 26 to 28 discharging into creek flowing from east to west coming from
       Lake MacDonald Drive
     Lots 17 to 25 and 29 to 32 discharging into eastern side of creek flowing from south to
       north coming from Blue Wren Place
     Lots 33 to 57 discharging into western side of creek flowing from south to north from
       Blue Wren Place.


55 Lake MacDonald Drive – Stage 1 to 5                                                   pg. 12

Page 13

"Roadways |
Lot 20 to25 - Yard

Lot 20 to25 - Roof Area

17,19 - Roof Area

Lot 1 to 4- Yard, Roadways from Blue Wren Place Lot 17,19-Yard |

Lot 26-28 - Yard

Lot 26-28 - Roof Areal

= 5 | _Raingardens x3_ — | of ft
|

Lot $ to16 - Ys

te ahve BioBasin 3- Park

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers

8/41 Sunshine Beach Road

PO BOX 2305

NOOSA HEADS 4567

Ph: 54749081 Fax: 54749041
www.callaghanandtoth.com.au

 

1 to 4-Roof, 28m2 Roadside BioBasin 1
Bioretention Swale 1

10m2 Roadside
| | Lot 33-57 - Roof Area
Lot 29 to 32- Roof Area Pal

Bioretention Swale 2) ‘Lot 33-57 - Yard

(Completed)
from Blue Wren

North section of trom Blue Wren Place Lot 18 - Yard.
Lot 18- Roof Area

Joining Road from Blue Wren Place

|
Junction - Ck off Blue Wren Place’
|

Junction - east west gully |

Junction west side stg5 gully

RaceWing Node -T of Six Mile Ck

project

57 LOTS RESIDENTIAL RECONFIGURATION MUSIC MODEL

location

55 LAKE MACDONALD DRIVE / PEARSONS ROAD

COOROY Figure 4.1

Date: APRIL 2014 Page 13

Page 14

                                                                            Callaghan & Toth

TABLE 4.1         MUSIC CATCHMENT AREAS (DEVELOPED)

             Catchment                    Land Use        Music Impervious      Area (ha)

                Lot 1 – 4                Urban – Roof            100%              0.08

           Yard – Lot 1 to 4             Urban – Yard            20%               0.167

   Road Widening + Verge (Lake           Urban – Road             60%              0.051
         MacDonald Dr)

               Lot 5 – 16                Urban – Roof            100%               0.3

          Yard – Lot 5 to 16             Urban – Yard            20%               0.717

 Road Widening + Verge (Masonry          Urban – Road            60%               0.185
             Street)

              Lot 26 to 28               Urban – Roof            100%              0.075

          Yard – Lot 26 to 28            Urban – Yard            20%               0.126

      Lot 17 to 25 and 29 to 32          Urban – Roof            100%              0.40

  Yard – Lot 17 to 25, and 29 to32       Urban – Yard            20%               0.61

     Roadway (off Blue Wren Ct)          Urban – Road             60%              0.40

               Lot 33 - 57               Urban – Roof            100%              0.625

          Yard – Lot 33 to 57            Urban – Yard            20%               1.065

     Roadway (off Blue Wren Pl)          Urban – Road             60%              0.461

             TOTAL                                                               5.262ha


4.2.2 Treatment Nodes

The “MUSIC Modelling Guidelines for South East Queensland” Version 1 prepared by Water by
Design and dated December 2010 has been used to set the rainfall runoff parameters and
pollutant export parameters for the site.

The land use type used for this model was “Urban” and the values in the guideline shown in
Table 3.7 and Table 3.8 of the guidelines have been used in this model.

Treatment nodes proposed for areas discharging into the eastern tributary (Stages 1, 2,
part of 3 and 5):
   1. Bioretention Basin 1 (already completed as part of Stage 1):
           a. Located in Passive Parkland adjacent to Lake MacDonald Drive.
           b. It is 47m2 in area with a filter area of 25m2.
           c. Filter layer depth of 0.5m and an extended detention depth of 0.3m.




55 Lake MacDonald Drive – Stage 1 to 5                                                    pg. 14

Page 15

                                                                           Callaghan & Toth

           d. The size and depth of the systems have been designed in accordance with
              Water by Design Guidelines and a typical plan and section are shown in Figure
              4.2.
    2. Bioretention Basin 3
           a. Located in Passive Parkland adjacent to Masonry Street.
           b. Designed with a filter area of 150m2.
           c. Filter layer depth of 0.5m and an extended detention depth of 0.3m.
           d. The size and depth of the systems have been designed in accordance with
              Water by Design Guidelines and a typical plan and section are shown in Figure
              4.2.
    3. Raingardens – Lot 26,27,28
           a. Located within Lots 26, 27 and 28
           b. Each designed with an area of 6m2 filter area
           c. Filter layer depth of 0.4m and an extended detention depth of 0.15m.
           d. The size and depth of the systems have been designed in accordance with
              Water by Design Guidelines and a typical plan and section are shown in Figure
              4.3.

Treatment nodes proposed for areas discharging into the western tributary (Part of Stage
3), eastern bank:
    4. Bioretention Swales 1 and 2
           a. Located in road reserve adjacent road off Blue Wren Place
           b. Designed to have filter areas of 97m2 and 82m2 respectively
           c. The swales are 80m and 70m respectively with a total of 150m swale length.
           d. Filter layer depth of 0.4m.
           e. The size and depth of the systems have been designed in accordance with
              Water by Design Guidelines.
    5. Roadside Bio Basins 1a and 1b and 2
           a. Located in road reserve
           b. Designed to have filter areas of 10m2, 15m2 and 10m2 respectively.
           c. Filter layer depth of 0.4m and extended detention depth of 0.1m.
           d. The size and depth of the systems have been designed in accordance with
              Water by Design Guidelines.
    6. Grassed Buffer
           a. Located in road reserve.
           b. Accepts sheet flow from road.
           c. Is approximately 50% of impervious area of the road.

Treatment nodes proposed for areas discharging into the western tributary (Stage 4),
western bank:
   7. Bioretention Basin 2:
          a. Located in Passive Parkland adjacent to creek.
          b. Design with a filter area of 211m2.
          c. Filter layer depth of 0.5m and an extended detention depth of 0.3m.
          d. The size and depth of the systems have been designed in accordance with
             Water by Design Guidelines. A typical bioretention basin plan and cross-section
             is shown in Figure 4.2.


4.2.3 Rainfall Data
The meteorological data used for the MUSIC Model was the data for Cooroy from 01/01/92 –
31/12/02 and is a 6 minute time step. The choice of the data was based on recommendations
from Noosa Council Land Development Section.



55 Lake MacDonald Drive – Stage 1 to 5                                                pg. 15

Page 16

                                                                              Callaghan & Toth


The mean Annual Rainfall for Cooroy      92 – 02 = 1585mm
The mean Annual Rainfall for Cooroy      72 – 02 = 1650mm

The MUSIC Modelling Guidelines (2010) details that Cooroy data for 1973 to 1983 should be
used. This data has an annual average Rainfall of 1600mm. It is considered that the 10 year
period from 1992 – 2002 has a relatively close mean annual Rainfall to the recommended 10
year period and as such is acceptable to use in this case.

Urban Residential rainfall-runoff parameters from the draft guidelines have been used.

4.3      MUSIC Modelling Results

The MUSIC modelling program has been used to investigate the performance of various
treatment options in the treatment train. MUSIC Version 6.0.1 is the current version and was
used to assess this development proposal.

4.3.1 Water Quality Objectives

This proposed stormwater treatment system for the development, when modelled using MUSIC
meets the pollution load reduction target as detailed in DSDIP’s State Planning Policy
December 2013 – Appendix 2, Table B. The following have been included in Appendix 2.
           The treatment train effectiveness for the system.
           The MUSIC Version 6.0.3 Summary Report.

The treatment train effectiveness for the system is shown below in Table 4.2. The results
indicate that the proposed stormwater treatment train will be effective in achieving the
reductions as outlined in the State Planning Policy December 2013 – Appendix 2, Table B. It
reduces sediment and nutrient concentrations and loads to an acceptable level and also
reduces runoff concentrations.


TABLE 4.2:      COMPARISON OF LOAD REDUCTIONS
                            MUSIC REDUCTION                  POLLUTANT LOAD
        PARAMETERS
                                RESULTS                     REDUCTION TARGETS
    Flow                           3%
    Total Suspended Solids        81%                                 80%
    Total Phosphorous             58%                                 60%
    Total Nitrogen                51%                                 45%
    Gross Pollutants              99%                                 90%

4.3.2 Assessment of Results

The developed site has been modelled as a series of Urban Residential sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD) treatment trains. Figure 3.1 and Figure 3.2
show the proposed locations of the treatment systems. The reductions listed in Table 4.2 above
generally comply with Council’s requirements, Water by Design Deemed to Comply Solutions
and the State Planning Policy December 2013 – Appendix 2, Table B. Therefore, it is
considered that the proposed stormwater treatment system is currently sufficient to reduce the
pollutants prior to exiting the site and entering the tributary of the Six Mile Creek.




55 Lake MacDonald Drive – Stage 1 to 5                                                   pg. 16

Page 17

                                                                                Callaghan & Toth

Total Phosphorus result for the site discharging into the tributaries is 58% - which is considered
suitable as the target is 60% and the result is within acceptable model error.


4.4       TREATMENT DEVICES DESIGN DETAILS

Below in Table 4.3 are general design details for stormwater treatment systems.

Lining:

The surrounding soils are clay to silty clays with a saturated hydraulic conductivity of
approximately 3.6mm/hr. The sandy loam media that is proposed as the filter media has a
hydraulic conductivity of 200mm/hr, therefore the conductivity of the filter media is > 10 times
the conductivity of the surrounding soils and an impervious liner is not considered to be
required.




55 Lake MacDonald Drive – Stage 1 to 5                                                     pg. 17

Page 18

                                                                                                                         Callaghan & Toth

TABLE 4.3: Design Features of Stormwater Treatment Systems

                                                                                                             Extended
                       Filter         Overall    Length   Width        Total     Filter Depth   Transition
  SYSTEM                                                                                                     Detention
                     S.A. (m2)       S.A. (m2)     (m)     (m)       Depth (m)        (m)       Layers (m)
                                                                                                             Depth (m)
 Bio Basin 1             25              47       6.25       4          0.8          0.5           0.3          0.3
 Bio Basin 2             211             275                            0.8          0.5           0.3          0.3
 Bio Basin 3             150             202                            0.8          0.5           0.3          0.3
  Road Bio
                         10              10        4        2.5        0.65          0.4           0.25         0.1
  Basin 1a
  Road Bio
                         15              15        6        2.5        0.65          0.4           0.25         0.1
  Basin 1b
  Road Bio
                         10              10        4        2.5        0.65          0.4           0.25         0.1
   Basin 2
 Bio Swale 1             97              97       80        1.2        0.65          0.4           0.25         0.0
 Bio Swale 2             82              82       70        1.2        0.65          0.4           0.25         0.0
Raingardens
  (a total of 4 on       24              24        3         2         0.55          0.4           0.25        0.15
        site)
   Grassed
                         n/a             150      40      2.5 to 5      n/a          n/a           n/a          n/a
    Buffer




55 Lake MacDonald Drive – Stage 1 to 5                                                                                        pg. 18

Page 19

 

PIT, PIPEWORK AND OUTLET —

 

 

 

 

 

 

FILTER MEDIA SANDY LOAM (TS2000 SAND)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONFIGURATION AS PER SATURATED HYDRAULIC CONDUCTIVITY
IPWEAQ STD DWG 200mm/+R THICK PLANT WITH MACROPHYTES
WSUD-002 @ 8/m
LARGE COARSE SEDIMENT FOREBAY 2008
030 RIVER STONES OVER GEOTEXTILE
RL 2 ck
Ss oN
WEIR RL COCCCoreo Kir
a 73 LIP_RL : ij ii — ee
i \ k i Look
oan it
1
oam =f =
COARSE SAND TRANSITION LAYER 0.1m DEEP. (1mm — [
DIAMETER SAND) DRAINAGE LAYER
(WASHED FINE GRAVEL 2—Smm WITH <2% FINES SATURATED
100@ SLOTTED

HYDRAULIC CONDUCTITY OF 4000mm/HR).
SECTION A - A

SEEPAGE PIPE TO
INLET OF O/F PIT

 

 

BIO BASIN 2 — 211m? FILTER SURFACE AREA

BIO BASIN 3 — 150m? FILTER SURFACE AREA

 

 

SEEPAGE PIPE

i

|
|
| 2.0m CENTRES
|
|

 

 

 

 

 

 

 

 

 

1.0. TO SURFACE WITH CAP
& CONC SURROUND
9100 SLOTTED.

 

 

 

 

 

    

 

 

 

1.0. TO SURFACE WITH CAP
& CONC “mn
——+ke ee = TNT PIPE
pa
A A
N | 4
| 2.0m CENTRES:
1.0. TO SURFACE WITH CAP & /
CONC SURROUND
oS
'— SURCHARGE GRATE LIGHT DUTY "TELLAM SPG
900x600 NORMAL GRATE & FRAME ON
OUTLET FROM O/F PIT TO LEGS” MIN 100 GAP TO PIT. CONTRACTOR
EXISTING WATERCOURSE TO MEGAPOXY ALL JOINS.
PLAN
project

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers

8/41 Sunshine Beach Road

PO BOX 2305

( NOOSA HEADS 4567
H Ph: 54749081 Fax: 54749041

= www.callaghanandtoth.com.au

57 LOTS RESIDENTIAL RECONFIGURATION

location
55 LAKE MACDONALD DRIVE / PEARSONS ROAD
COOROY

TYPICAL BIORETENTION BASIN

Figure 4.2

 

 

Scale: NTS Date: APRIL 2014

Page 19

 

 

Page 20

 

LENGTH VARIES

 

 

 

KERB_& GUTTER

 

 

 

 

 

 

TVVY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10 TO SURFACE WITH
CONCRETE SURROUND

KERBSIDE_ BASIN LAYOUT

600 x 600 OVERFLOW PIT
UNDERGROUND DRAINAGE PIPE

 

 

 

SCALE 1:100
SLOTTED RIGID PIPE
RS BBIA = 10m? —
RS BBIB = 15m?
RS BB2 = 10m?
3.20 FOOTPATH IF REQUIRED
KERB 0.60 2.00 0.60
2
3%> THe NY AVA AY AYA OES i

 

0.40

 

 

 

 

FILTER MEDIA (SANDY LOAM) (SATURATED
HYDRAULIC CONDUCTIVITY 300mm/Hr)

TRANSITION LAYER COARSE SAND 1mm @

DRAINAGE LAYER 2—5mm WASHED SCREENINGS
100@ SLOTTED RIGID PIPE

STORMWATER DRAINAGE PIPE

 

 

oj
0.20

POLY POOL LINER WITH WELDED JOINS

ROADSIDE BASIN SECTION
SCALE 1:50

 

SANDY LOAM PLANT —
WITH NATIVE

DROUGHT RESISTANT

SHRUBS & GRASSES

fl 1.5m |

r— 450 x 450 GRATED OVERFLOW PIT

 

200 x 75 CCA TREATED
PINE SLEEPERS

   
 
 
  

50mm

 

0.15m
0.4m
0.2m

 

 

COARSE SAND

7

#150 OUTLET FROM O/F PIT
TO INTERLOT DRAINAGE

9100 SLEEVED SEEPAGE
PIPE TO INLET OF O/F
PIT

SECTION A — A

ROOFWATER TANK OUTLET PIPE & PAVED 150 OUTLET

 

 

1.5m

 

 

 

 

 

AREA DRAINAGE. OUTLET PIPE— FROM O/F PIT
IL TO MATCH SAND SURFACE LEVEL TO INTERLOT
DRAINAGE.
4.0m [ ; A
t N T
Ilodl
Hit
TI—T1
#100 SLEEVED SEEPAGE PIPE
CoD DDD nd
Tr

 

 

 

 

 

 

 

 

‘_ OVERFLOW PIT

PRIVATE_RAIN GARDEN PLAN

 

 

Project

Callaghan & Toth

Civil, Environmental &

. . location
Hydraulic Engineers

8/41 Sunshine Beach Road

PO BOX 2305

NOOSA HEADS 4567

Ph: 54749081 Fax: 54749041

COOROY
Mt

57 LOTS RESIDENTIAL RECONFIGURATION

TYPICAL RAINGARDENS DETAILS

55 LAKE MACDONALD DRIVE / PEARSONS ROAD
Figure 4.3

 

—_ www.callaghanandtoth.com.au

 

Scale: NTS

Date: APRIL 2014

Page 20

 

450 x 450 GRATED

 

Page 21

                                                                                  Callaghan & Toth


5.       FLOODING ASSESSMENT SUMMARY
The flood study for the site was undertaken by Brisbane Stormwater Management Pty Ltd
(BSM). The results of the flood study and assessment are summarised below.

5.1      Existing Conditions

The site is traversed by two tributaries of Six Mile Creek, described as the eastern and western
tributaries.

The site is subject to ponding of floodwaters from the adjacent watercourses and the Q100 year
ARI flood levels (see Drawing Number 1225-33). The proposed lots are above the Q100 year
inundation line. The new road from Blue Wren Court is partly below the Q100 inundation line.

The flood assessment from BSM (See Appendix 4) reports on the hydrologic and hydraulic
performance of the site including upstream and downstream catchments.

5.2      Proposed Drainage System

Some of the increased stormwater runoff from the proposed residential areas is proposed to be
mitigated by conventional detention volumes in two bio-retention basins, but most of the
increased runoff is proposed to be attenuated by an increase in the floodway storage on the
site. The increased floodway storage will be achieved by deliberately “roughening” the
floodways (by revegetating the riparian zones, as required by Council) and by constructing a
restrictive footbridge across the eastern tributary to back-up the flood profiles in that tributary
floodway.

There will also be some regrading of the invert of the western tributary and the removal of an
artificial hump in the eastern tributary channel to achieve some more storage of flood flows
during the 100yr events.

The road surface level is proposed to tbe drained to an underground drainage system capable
of taking Q5 ARI flows. The overflow will discharge to the Bioretention Basins / Swales where it
will attenuate flows to pre-development conditions.

The Bioretention Basins have been modelled to act as a detention/infiltration basin. The basin
size and weir size is sufficient to reduce the increase in runoff for Q1 to Q100 storms, back to
predevelopment levels as shown in Table 5.1.

         TABLE 5.1:         Pre-Development and Post Development Discharges at node 15-16

                               Q1         Q2            Q5                Q10             Q100
      Location
                              (m3/s)     (m3/s)        (m3/s)            (m3/s)           (m3/s)

Pre-Development                 6.8       8.4           13.8             17.3              26.0
Post Development                6.7       8.3           13.5             17.2              25.1




55 Lake MacDonald Drive – Stage 1 to 5                                                      pg. 21

Page 22

                                                                           Callaghan & Toth

5.3      Western Tributary

It is proposed to reshape the existing western tributary to achieve the following:
      Increase flood storage for the site
      Reduce maintenance requirements for the watercourse
      Reduce habitat for pests species, that is remove breeding ponds for mosquitos and
         toads
      Improve drainage through the site

The proposed works include:
    Reshaping the low flow profile between the top of banks on both sides of the
       watercourse. Drawing Number 1225-33 shows the area of earthworks.
    Placement of a 1.5m wide rock lined invert for the length of the watercourse
    Revegetation of the banks to replace the weeds removed on site
    Maintain existing trees within the riparian zone of the watercourse




55 Lake MacDonald Drive – Stage 1 to 5                                                pg. 22

Page 23

 

 

 

Im
GD
rm
=
iS

 

5m RIPARIAN BUFFER FROM INVERT

5m RIPARIAN BUFFER FROM TOP OF BANK

[TT] tom riparian BUFFER FROM TOP OF BANK
Serer

LOT OR INFRASTRUCTURE INSIDE RIPARIAN BUFFER
(TOTAL AREA 340 SQUARE METRES)

ADDITIONAL RIPARIAN BUFFER OFFSET (PRELIMINARY AREA
580 SQUARE METRES, SUBJECT TO FLOOD MODELING)

EXISTING TOP OF BANK

 

 

FINAL Q100

——— --———___ PROPOSED LAY BACK TYPE INVERT LINE KERB &
CHANNEL M1 TO IPWEAQ STD DWG R-0080

 

 

=—= SW _ PROPOSED STORMWATER PIPE
+ 5 PROPOSED INTERLOT DRAINAGE PIPE WITH
—_ RAINGARDEN
+ —*— PROPOSED INTERLOT DRAINAGE PIPE
WITH PITS

PROPOSED BIORETENTION BASIN

PROPOSED VEGETATED
BIO-RETENTION SWALE

WLLL, “NOR CHANNEL

INVERT PROFILING

 

 

 

 

 

   

ji 100
gf 9P218739

@/ RESERVE

 

BUFFER AREAS
INFILL PLANTING TO
ACHIEVE PLANT DENSITY
OF 1 PLANT/1.5m? eo

=

 

 

 

 

Ny

  
 
 
   
   
 
 
 
 
 
  
 
  
 
 
  

 

we
x
~/
WESTERN TRIBUTARY a

 

 

WESTERN BANK — RIPARIAN BUFFER AREA
PLANT AREA TO ACHIEVE PLANT DENSITY OF
1 PLANT/1.5m?. CURRENTLY RIPARIAN AREA

FROM TOP OF BANK LIMITED TO GRASS
NATURE VEGETATION PRESENT ON BANKS

 

 

7 = Fao |

L
ACTIVE

4

7 PARKLAND
J 685m? he

$— ~~ x Fa100

 

FLUSH KERB ON

 

 

 

 

 

 

 

 

 

  

 

RESERVE _BDY

PREVIOUS ROAD 22

 

 

   
       
  

35

 

} 32 +
A a

WEST SIDE OF ROAD1 a

 

7
EASTERN TRIBUTARY ;
A
—S

   
 

27

RIPARIAN MAPPING DOWNSTREAM
OF THIS POINT, STREAM BANK
USED FOR START OF BUFFER

 

 

 

 

26

 

Sm WIDE CLEAR AREA
BEHIND LOTS FoR,
e* 25,

 

 

ACCESS OR SERVICES

 

 

 

 

 

 

 

 

 

 

  
  
  
   

RP1 73883

J

. 11

 

 

 

EASTERN BANK — RIPARIAN BUFFER AREA ‘
PLANT 70% OF AREAS TO ACHIEVE PLANT

DENSITY OF 1 PLANT/1.5m’. REMOVE WEEDS

 

 

 

 

 

A

12

100

 

NO RIPARIAN MAPPING DOWNSTREAM
OF THIS POINT, STREAM INVERT |.
USED FOR START OF BUFFER | »

a

 

 

 

 

PURPLE AREA — INFILL PLANTING | |
REQUIRED FOR 30% OF AREA 10 N
ACHIEVE 1 PLANT/1.5m?

 

 

 

( Callaghan & Toth )

Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

i! 8/41 Sunshine Beach Road

=| Phone 54749081, Fax 54749041

www.callaghanandtoth.com.au

 

designed | ADT datum AHD DERIVED

 

drown BM ye

 

 

PS
checked | AH Origin (B.M.) RL *

 

approved

 

 

SURVEYED _BY
MAX WATTERSION & ASSOCIATES

PHONE 54 426 121
a

(SS

project

PROPOSED 31 LOT SUBDMSION
55 LAKE MacDONALD DRIVE
COOROY

Client
VALKEV PTY LTD

$d

_O——————————L————,
title

RIPARIAN ZONES STAGE 3 & 5

—_
_—_—————————————————————.

LOT 136 on MCH978

Parish of TEWANTIN

County of MARCH

SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD

Ce )

_—————————————————
SCALE

 

0.5 10.15 20 25 Meters 50
SS

scale SCALE SHOWN IS ORIGINAL DRAWING SCALE

 

 

( DO_NOT SCALE FROM THIS DRAWING
1:1000(A3) USE ONLY DIMENSIONS PROVIDED

REVISIONS

re detai
~|

   

FILES

 

COMPUTER DIRECTORY

 

X:\JOBS\CT Projects in progress\1225 30 lots
lake MacDonald Drive\\Design\Current_DWG—BASE

 

PRELIMINARY

 

Sheet 1 of 10 sheets

 

drawing number

1225-33

 

 

 

 

date 10-3-14 yy,

 

 

 

Page 24

                                                                              Callaghan & Toth


6.       CONCLUSIONS & RECOMMENDATIONS
An integrated water management approach has been used to assess the site’s stormwater
requirements and water management needs. In summary:

        The proposed reconfiguration at 55 Lake MacDonald Drive and Pearsons Road from
         four (4) lots into Fifty-seven (57) lots can be treated by a stormwater treatment train
         consisting of:
         o One medium Bioretention Basin (BioBasin 1)(already completed for Stage 1 i.e. Lots
             1 to 4),
         o Two large Bioretention Basins located in park treating runoff from Lots 5 to 16 and
             associated road reserve for BioBasin 3 and treating runoff from Lot 33 to 57 for
             BioBasin 2.
         o Three small Roadside Bio Basins treating runoff from Lots 20 to 25 and associated
             road reserve,
         o Two Bioretention swales treating runoff from Lots 17,19, 29 to 32 and associated
             road reserve,
         o Three Raingardens for Lots 26, 27 & 28, and
         o A grassed buffer for the road joining the new development to Blue Wren Place.

        This proposed stormwater treatment train achieves the current best practice load based
         reduction targets as prescribed in the Water by Design Deemed to Comply Solutions –
         Stormwater Quality Management (South East Queensland) version 1.0 – Table A-2
        The new lots have sufficient flood free areas to build residential infrastructure in
         accordance with Council’s requirements.
        The increased flood storage achieved with the measures:
                    o Detention volume in Bio Basins 2 and 3,
                    o Watercourse reshaping for the Western tributary,
                    o Revegetation of riparian areas to “roughen” the catchment, and
                    o Constructing a restrictive footbridge across the eastern tributary;
         Allows attenuation of the runoff concentrations back to Pre Development levels and so
         the development will not have an impact on the hydrology of the downstream receiving
         waters.




55 Lake MacDonald Drive – Stage 1 to 5                                                   pg. 24

Page 25

                                                                       Callaghan & Toth


APPENDIX 1                               -   Preliminary Stormwater Quality
Management Plan




55 Lake MacDonald Drive – Stage 1 to 5                                             pg. A

Page 26

Maintenance Manual -— Lake MacDonald Drive - Stormwater
Treatment Devices

Page 27

1.0 INTRODUCTION
Stormwater treatment systems are designed with the intent to remove pollutants from stormwater
piror to it entering local waterways. The systems commonly used include bioretention basins,
raingardens, kerbside bioretention pits, and bioretention swales.

Stormwater is directed to these systems via piped systems or overland with breaks in kerbs or
swales directing water to enter the treatment system.

Treated stormwater is collected at the base of the system via perforated pipeswhich are located
in a gravel drainage layer. The treated stormwater is discharged to the local waterways or
collected for reuse.

Figure 1 below shows a concept illustration of a raingarden or bioretention tree pit illustrating
stormwater flow pathways and subsurface infrastructure requiring maintenance.

Page 28

2.0 LONGTERM MAINTENANCE
Three key elements in the design and construction of raingardens and bioretention tree pits have
been identified that strongly influence the amount of long term maintenance that is required. The
elements are:

      Correct filter media specification and installation
      Dense vegetation cover
      Protection during construction phases

The importance of these key elements is described in more detail below.
2.1    Filter media
The filter media for the raingarden or bioretention systems must meet certain specifications. It is
crucial that the filter media installed maintains its hydraulic conductivity (i.e. it’s ability to pass
water through the media) in the long term. When an inappropriate filter media is installed (e.g. it
contains high levels of fine silt + clay materials) it may result in compaction or even structural
collapse of the media. This leads to a substantial reduction in the treatment capacity of the
system because water will not filter through the media but will pond on the surface instead and
spill out through the overflow. A symptom of this compaction is often the loss of vegetation within
the raingarden or tree pit.

Similarly, the filter media must be correctly installed with an appropriate level of compaction
during installation. Guidelines currently recommend that filter media be lightly compacted during
installation to prevent migration of fine particles. In small systems, a single pass with a vibrating
plate should be used to compact the filter media, while in large systems, a single pass with roller
machinery (e.g. a drum lawn roller) should be performed (FAWB 2008).


2.2    Vegetation cover
Nutrients have been identified as a key pollutant in stormwater, particularly nitrogen and
phosphorus. The nutrient removal efficiency of raingardens and bioretention systems is related to
the root structure and density of the plants within the system. Early analysis carried out by FAWB
suggests that dense fibrous roots provide the most efficient pollutant removal. Further, as plants
mature and their roots penetrate the filter media they play a role in maintaining the hydraulic
conductivity of the media.

Root growth helps to maintain the surface porosity and the infiltration capacity of the filter media.
As a result, it is important that dense vegetation cover is established at an early stage to prevent
compaction or surface sealing by promoting extensive root penetration. Some bioretention tree
pits are designed without understorey vegetation. In these instances, it is likely that additional
maintenance will be required to maintain the porosity of the surface of the filter media (e.g.
physical removal of any fine sediments accumulating on the surface).


2.3 Protection during construction phases
Protection of biofiltration systems during construction allows for good plant establishment and
prevents disturbance or scour of the filter media surface. It is also important to protect the
biofiltration system from heavy sediment loads, or other wash off (e.g. cement washings), during

Page 29

any construction in the catchment to prevent clogging of the surface of the filter media (see
Section 3 for more detail).



3.0        ESTABLISHMENT PHASE MAINTENANCE

A number of maintenance activities have been identified that are, in most cases, only required
during the establishment phase of a raingarden or tree pit. The end of the establishment phase
can be defined by the completion of both of the following:


  i.      The plant establishment – where plants are suitably established to no longer require
          irrigation and are close to their mature height and/or when larger trees no longer require
          tree stakes for support. This period is typically 18 to 24 months.

  ii.     The raingarden or tree pit is completely connected to its intended catchment and the
          catchment is no longer under construction (therefore there is less risk of high sediment
          loads or other contaminants, such as cement washings or fine clay sediments, being
          washed onto the surface of the filter media and causing clogging). It is also important that
          the entire catchment is connected to ensure adequate water availability for plants under
          normal climatic conditions.

3.1       Protection of filter media during construction
Construction sites usually generate very high loads of sediment in stormwater runoff. These
exceptionally high loads can cause the filter media within a raingarden or tree pit to become
clogged or blocked. Blockage may occur as a result of the accumulation of fine sediment on the
surface; this can sometimes be manually removed. Accumulation of fine sediment may also
occur in a layer deeper within the filter media, usually resulting in the need to remove and replace
the filter media. To protect the filter media while construction activities are occurring in the
catchment, at least one of the following precautions should be taken:


       1. Keep the raingarden or tree pit off-line during this period to prevent any stormwater
          entering– Note: adequate alternative sediment control measures must also be installed
          during construction to prevent heavy sediment loads being discharged directly to the
          stormwater system while the raingarden or tree pit is off-line.

       2. Delay final landscaping and protect system by covering the entire bioretention surface
          with geofabric (and turf or gravel if desired for aesthetic purposes) as shown in Figure 2
          (left).

       3. Temporarily partition the bioretention system, creating a sacrificial sediment forebay. This
          allows the vegetation to establish in the rest of the system while the sacrificial sediment
          forebay at the inlet is protected using geofabric and turf as described above and shown in
          Figure 2 (right). This approach is best suited when the over flow pit is located close to the
          inlet zone.

Page 30

3.2    Irrigation
Plants and trees in raingardens and tree pits will probably require irrigation during the
establishment phase. Irrigation should be applied directly to the surface of the filter media. The
use of Ag pipes for irrigating young trees is not recommended as it creates a short circuit
pathway, or preferential flow path, for stormwater. As illustrated in Figure 3, the stormwater flows
straight down the Ag pipes and into the drainage layer at the base where it is conveyed
downstream to the conventional stormwater system, effectively bypassing any pollutant removal
processes that occur as the stormwater filters through the soil media. Figure 3. Concept
illustration showing how Ag pipes installed for tree watering can result in short circuiting and
reduced stormwater treatment.
3.3    Tree stake removal
Tree stakes are often used to support young trees planted into the filter media of raingardens or
tree pits. Once the trees are adequately established the stakes should be removed and the holes
filled in with filter media. Failure to fill in the holes will result in the creation of a short circuit
pathway, or preferential flow path, for stormwater. Instead of ponding on the surface of the
raingarden, the holes left behind after the stakes are removed allow water to bypass the filter
media and drain directly into the drainage layer at the base of the cell, effectively bypassing any
pollutant removal processes.

Page 31

4.0       MAINTENANCE MANUAL


4.1 BIORETENTION SYSTEMS MAINTENANCE PROCEDURES
Objective        To maintain the bioretention systems to ensure that it continues to remove pollutants from stormwater runoff, as
                 intended during the design phase including:
                       Bioretention Basins 1, 2 and 3
                       Bioretetnion Swales 1 and 2
                       Roadside BioBasins 1a, 1b and 2
Actions          Description                                                               Responsibility Timeframe
General                Remove accumulated litter / debris to pond and grates              Developer       Every three months for first
Maintenance                                                                                                year of operation – during
                       Remove accumulated sediments at inlet                                              On-maintenance period
                       Remove impermeable layer if water ponds for more than a
                        few hours
                       Remove weeds and dead plants
                       Replace plants where necessary
                       Water plants as necessary
                       Reinstate areas that have eroded and holes in media
                       Ensure energy dissipation at entry and exit points is adequate
                        and repair if necessary
                       Control erosion and sediment loss upstream or within system
                        where necessary
                       Check builders working upstream block inlet to biopod with
                        filter bags and ring edge with sediment fence. If not compliant,
                        ring building compliance officer.
Following Off-         Remove accumulated litter / debris to pond and grates              Council         Every six months (or as

Page 32

maintenance                                                                                          necessary) following first
                     Remove accumulated sediments at inlet
                                                                                                     year.
                     Remove impermeable layer (such as oily or clayey sediment)
                      if water ponds for more than a few hours
                     Remove weeds and dead plants
                     Replace plants where necessary (8-10 plants per m2 is
                      required). Ensure even spacing of plants.
                     Water plants as necessary
                     Check if a small clear flow is discharging from seepage pipe
                      to overflow pit after soaking rain. Repair blockages in pipes if
                      necessary
                     Treat plants for disease, pests etc.
                     Water plants as necessary
                     Reinstate areas that have eroded and holes in media
                     Ensure energy dissipation at entry and exit points is adequate
                      and repair if necessary
                     Ensure builder is aware that when working upstream they are
                      to block inlet to biopod with filter bags and ring edge with
                      sediment fence.
Every ten years      Remove the top 50mm of filter material                               Council   Every ten years (or as
                                                                                                     necessary)
                     If after the removal of the top 50mm of filter material the water
                      ponds for more than 2 hours after inflow stops. Test hydraulic
                      conductivity of filter media (Replace filter media if conductivity
                      is below the minimum of 50 mm/hr).
Inspections          Carry out three monthly inspections of the system and inspect        Council   Every six months –or as
                      the following:                                                                 necessary.
                         o   Sediment build up on surface
                         o   Impermeable layer (such as oily or clayey sediment)
                             build up

Page 33

                   o   Organic matter build up
                   o   Health of vegetation, presence of disease, pests,
                       stunted growth, etc
                   o   Pondage during storms not infiltrating into the sand
                   o   Erosion at the outlet or inlet
Reporting      Keep a record of inspections and actions undertaken using     Council
                FAWB form 4.2.5
               Record environmental incidents and corrective actions using
                FAWB form 4.2.5

Page 34

4.2 RAINGARDEN MAINTENANCE PROCEDURES
Objective        To maintain the raingarden systems to ensure that it continues to remove pollutants from stormwater runoff, as
                 intended during the design phase.
Actions          Description                                                               Responsibility Timeframe
General                Remove accumulated litter / debris to pond and grates              Developer      Every three months for first
Maintenance                                                                                               year of operation – during
                       Remove accumulated sediments at inlet                                             On-maintenance period
                       Remove impermeable layer if water ponds for more than a
                        few hours
                       Remove weeds and dead plants
                       Replace plants where necessary
                       Water plants as necessary
                       Reinstate areas that have eroded and holes in media
                       Ensure energy dissipation at entry and exit points is adequate
                        and repair if necessary
                       Control erosion and sediment loss upstream or within system
                        where necessary
                       Check builders working upstream block inlet to biopod with
                        filter bags and ring edge with sediment fence. If not compliant,
                        ring building compliance officer.
Following Off-         Remove accumulated litter / debris to pond and grates              Householder    Every six months (or as
maintenance                                                                                               necessary) following first
                       Remove accumulated sediments at inlet                                             year.
                       Remove impermeable layer (such as oily or clayey sediment)
                        if water ponds for more than a few hours
                       Remove weeds and dead plants

Page 35

                     Replace plants where necessary (6-10 plants per m2 is
                      required). Ensure even spacing of plants.
                     Water plants as necessary
                     Check if a small clear flow is discharging from seepage pipe
                      to overflow pit after soaking rain. Repair blockages in pipes if
                      necessary
                     Treat plants for disease, pests etc.
                     Water plants as necessary
                     Reinstate areas that have eroded and holes in media
                     Ensure energy dissipation at entry and exit points is adequate
                      and repair if necessary
                     Ensure builder is aware that when working upstream they are
                      to block inlet to biopod with filter bags and ring edge with
                      sediment fence.
Every ten years      Remove the top 50mm of filter material                               Householder   Every ten years (or as
                                                                                                         necessary)
                     If after the removal of the top 50mm of filter material the water
                      ponds for more than 2 hours after inflow stops. Test hydraulic
                      conductivity of filter media (Replace filter media if conductivity
                      is below the minimum of 50 mm/hr).
Inspections          Carry out three monthly inspections of the system and inspect        Householder   Every three months –or as
                      the following:                                                                     necessary.
                         o   Sediment build up on surface
                         o   Impermeable layer (such as oily or clayey sediment)
                             build up
                         o   Organic matter build up
                         o   Health of vegetation, presence of disease, pests,
                             stunted growth, etc
                         o   Pondage during storms not infiltrating into the sand

Page 36

                   o   Erosion at the outlet or inlet
Reporting      Keep a record of inspections and actions undertaken using     Householder
                FAWB form 4.2.5
               Record environmental incidents and corrective actions using
                FAWB form 4.2.5

Page 37

APPENDIX A FAWB FORM 4.2.5

4.2.5 FORM (REGULAR INSPECTION & MAINTENANCE)

 

 

 

 

 

Location Raingarden/Tree Pit
Site Visit Date: Site Visit By:
Weather:

Routine Inspection Oo Complete section 1 (below)

 

Purpose of the Site Visit
Routine Maintenance oO Complete sections 1 and 2 (below)

 

 

 

 

NOTE: Where maintenance is required (‘yes’ in Section 2), details should be recorded in the ‘Additional Comments’ section at the end of this document.

 

1. Filter media

 

*In addition to regular inspections, it is recommended that inspection for damage and blockage is made after
significant rainfall events that might occur once or twice a year.

Section 1

Section 2

 

Maintenance Required?

Maintenance Performed

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes No Yes No
Filter media (CIRCLE — pooling water/accumulation of silt & clay layer/scour/holes/sediment build up) oO oO oO oO
Litter (CIRCLE - large debris/accumulated vegetation/anthropogenic) oO oO oO oO

2. Vegetation

Vegetation health (C/RCLE - signs of disease/pests/poor growth) oO oO oO oO
Vegetation densities (CIRCLE — low densities- infill planting required) oO oO oO Oo
Build up of organic matter, leaf litter (C/RCLE - requires removal) Oo oO oO Oo
Weeds (CIRCLE - isolated plants/infestation) (SPECIES - . Oo oO oOo oOo

 

 

Page 38

 

3. Pits, pipes and inflow areas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Section 1 Section 2
Maintenance Required? Maintenance Performed?
Yes No Yes No
Perforated pipes (C/RCLE — full blockage/partial blockage/damage) oO oO oO oO
Inflow areas (CIRCLE — scour/excessive sediment deposition/litter blockage) oO oO oO oO
Overflow grates (CIRCLE — damage/scour/blockage) oO oO oO oO
Pits (CIRCLE — poor general integrity/sediment build-up/litter/blockage) oO oO oO oO
Other stormwater pipes and junction pits (C/RCLE — poor general integrity/sediment build-up/litter/blockage) oO oO oO oO
4, Submerged zone
Section 1 Section 2
Maintenance Required? Maintenance Performed?
Yes No Yes No
Weir/up-turned pipe (C/RCLE — full blockage/partial blockage/damage) oO oO oO oO
Water level (C/RCLE — at design level/drawn down) SOME DRAWDOWN DURING DRY PERIODS IS EXPECTED Oo oO Oo Oo

 

 

 

 

 

5. Additional Comments

 

 

 

 

Page 39

| |
- |

Callaghan & Toth

 

APPENDIX 2 - MUSIC Results

 

55 Lake MacDonald Drive — Stage 1 to 5 pg. B

Page 40

Source nodes

Road Lotito4- Lotito4- LotSto16- Lot5to16- Roadways- Lot 20 to25- Lot 20 to25 -
Location reserve Roof Area Yard Yard Roof Area Masonry St Roof Area Yard
ID 1 2 3 6 7 8 9 10
UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource
Node Type Node Node Node Node Node Node Node Node
Total Area (ha) 0.051 0.08 0.107 0.717 0.3 0.185 0.15 0.275
Area Impervious (ha) 0.03063777 0.07991325 0.02170976 0.1454757 0.2996747 0.111137 0.14983735 0.05579612
Area Pervious (ha) 0.02036223 —8.67E-05 0.08529024 0.5715243 0.0003253 0.073863 :0.00016265 0.21920388
Field Capacity (mm) 200 200 200 200 200 200 200 200
Pervious Area Infiltration Capacity coefficient - a ait att ait ait att ait ait att
Pervious Area Infiltration Capacity exponent - b 5 5 5 5 5 5 5 5
Impervious Area Rainfall Threshold (mm/day) 1 1 1 1 1 1 1 1
Pervious Area Soil Storage Capacity (mm) 500 500 500 500 500 500 500 500
Pervious Area Soil Initial Storage (% of Capacity) 10 10 10 10 10 10 10 10
Groundwater Initial Depth (mm) 50 50 50 50 50 50 50 50
Groundwater Daily Recharge Rate (%) 28 28 28 28 28 28 28 28
Groundwater Daily Baseflow Rate (%) 27 27 27 27 27 27 27 27
Groundwater Daily Deep Seepage Rate (%) 0 0 0 0 0 0 0 0
Stormflow Total Suspended Solids Mean (log mg/L) 2.43 1.3 2.18 2.18 1.3 2.43 13 2.18
Stormflow Total Suspended Solids Standard Deviation (log mg/L 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39
Stormflow Total Suspended Solids Estimation Method Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic _—_ Stochastic
Stormflow Total Suspended Solids Serial Correlation 0 0 0 0 0 0 0 0
Stormflow Total Phosphorus Mean (log mg/L) -0.3 -0.89 -0.47 -0.47 -0.89 -0.3 -0.89 -0.47
Stormflow Total Phosphorus Standard Deviation (log mg/L) 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31
Stormflow Total Phosphorus Estimation Method Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic _—_ Stochastic
Stormflow Total Phosphorus Serial Correlation 0 0 0 0 0 0 0 0
Stormflow Total Nitrogen Mean (log mg/L) 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26
Stormflow Total Nitrogen Standard Deviation (log mg/L) 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
Stormflow Total Nitrogen Estimation Method Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic _—_Stochastic
Stormflow Total Nitrogen Serial Correlation 0 0 0 0 0 0 0 0
Baseflow Total Suspended Solids Mean (log mg/L) 1 0 1 1 0 1 0 1
Baseflow Total Suspended Solids Standard Deviation (log mg/L) 0.34 0 0.34 0.34 0 0.34 0 0.34
Baseflow Total Suspended Solids Estimation Method Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic
Baseflow Total Suspended Solids Serial Correlation 0 0 0 0 0 0 0 0
Baseflow Total Phosphorus Mean (log mg/L) -0.97 0 -0.97 -0.97 0 -0.97 0 -0.97
Baseflow Total Phosphorus Standard Deviation (log mg/L) 0.31 0 0.31 0.31 0 0.31 0 0.31
Baseflow Total Phosphorus Estimation Method Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic
Baseflow Total Phosphorus Serial Correlation 0 0 0 0 0 0 0 0
Baseflow Total Nitrogen Mean (log mg/L) 02 0 0.2 02 0 0.2 0 0.2
Baseflow Total Nitrogen Standard Deviation (log mg/L) 02 0 0.2 02 0 0.2 0 0.2
Baseflow Total Nitrogen Estimation Method Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic _—_ Stochastic
Baseflow Total Nitrogen Serial Correlation 0 0 0 0 0 0 0 0
OUT - Mean Annual Flow (ML/yr) 0.478 1.02 0.643 431 3.82 1.73 1.91 1.65
OUT - TSS Mean Annual Load (kg/yr) 177 30.5 116 814 114 655 57.2 309
OUT - TP Mean Annual Load (kg/yr) 0.292 0.167 0.241 1.61 0.634 1.09 0.316 0.621
OUT - TN Mean Annual Load (kg/yr) 1 2.11 13 8.72 8.02 3.6 4.01 3.36
OUT - Gross Pollutant Mean Annual Load (kg/yr) 118 24 11.8 79.2 90.1 42.8 45.4 30.4
Rain In (ML/yr) 0.711512 1.1161 1.49278 10.003 4.18536 2.58098 2.09268 (3.83658
ET Loss (ML/yr) 0.231547 0.0962114 0.84291 5.64827 0.360791 0.839924 0.180395 2.16635
No Imported Data Source nodes
USTM treatment nodes
BioBasin 1 - 25m2 10m2
Stg1(Comple BioBasin3- Bioretention Roadside Roadside —_Raingardens Bioretention
Location ted) Park Swale2  BioBasin1 BioBasin2_ x3. Swale 1 Swale 1
ID 4 5 14 15 17 20 27 28
BioRetention BioRetention BioRetention BioRetention BioRetention BioRetention BioRetention
Node Type NodeV4  NodeV4 —- NodeV4. ss NodeV4.~—s NodeV4. = NodeV4. = NodeV4.~—s SwalleNode.
Lo-flow bypass rate (cum/sec) 0 0 0 0 0 0 0 0.005
Hi-flow bypass rate (cum/sec) 100 100 100 100 100 100 100
Inlet pond volume
Area (sqm) 46.69 202 82 25 10 18 97
Extended detention depth (m) 03 0.3 0 0.4 0.4 0.15 0 0.65
Overflow weir width (m) 3 3 1 1 1 1 1 a“
Weir Coefficient 17 1.7 17 17 1.7 17 17
Number of CSTR Cells 3 3 3 3 3 3 3 10
Total Suspended Solids - k (m/yr) 8000 8000 8000 8000 8000 8000 8000 8000
Total Suspended Solids - C* (mg/L) 20 20 20 20 20 20 20 20
Total Suspended Solids - C** (mg/L) 14
Total Phosphorus - k (m/yr) 6000 6000 6000 6000 6000 6000 6000 6000
Total Phosphorus - C* (mg/L) 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13
Total Phosphorus - C** (mg/L) 0.13
Total Nitrogen - k (m/yr) 500 500 500 500 500 500 500 500
Total Nitrogen - C* (mg/L) 14 1.4 1.4 14 1.4 1.4 14 1.4
Total Nitrogen - C** (mg/L) 1.4
Threshold Hydraulic Loading for C** (m/yr) 3500
Horizontal Flow Coefficient 3 3 3 3 3 3 3
Reuse Enabled Off Off Off Off Off Off Off Off
Annual Demand Enabled Off Off Off Off Off Off Off Off
Daily Demand Enabled Off Off Off Off Off Off Off Off
Custom Demand Enabled Off Off Off Off Off Off Off Off
Filter area (sqm) 25 150 82 25 10 18 97
Filter perimeter (m) 20.5 47 172.4 24 14 33 162.4
Filter depth (m) 05 0.5 04 04 04 04 04
Filter Median Particle Diameter (mm)
Saturated Hydraulic Conductivity (mnvhr) 200 200 200 200 200 200 200
Infiltration Media Porosity 0.35 0.35 0.35 0.35 0.35 0.35 0.35

Lot 29 to 32 - Lot 29 to 32-

North
section of

Roadway Roadway Joining Road
from Blue Lot 33-57- Lot33-57- fromBlue —_ from Blue

Roadways Yard Roof Area Roadways Lot 18 - Yard Yard Wren Place Wren Place RoofArea Yard Wren Place Wren Place
1 12 13 30 31 32 33 36
UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource UrbanSource
Node Node Node Node Node Node Node Node Node
0.08 0.177 01 0.129 0.625 1.065 0.461 0.034
0.04805925 0.03591241 0.09989157 0.05198779 0.07700938 0.62432229 0.21608316 0.27867875 0.02042518
0.03194075 0.14108759 0.00010843 0.03401221 0.05199062 0.00067771 0.84891684 0.18232125 0.01357482
200 200 200 200 200 200 200 200
ait 211 ait ait 211 211 ait 211
5 5 5 5 5 5 5 5
1 1 1 1 1 1 1 1
500 500 500 500 500 500 500 500
10 10 10 10 10 10 10 10
50 50 50 50 50 50 50 50
28 28 28 28 28 28 28 28
27 27 27 27 27 27 27 27
0 0 0 0 0 0 0 0
2.43 2.18 1.3 2.43 1.3 2.18 2.43 2.43
0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39
Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic | Stochastic Stochastic
0 0 0 0 0 0 0 0
-0.3 -0.47 -0.89 -0.3 -0.89 -0.47 -0.3 -0.3
0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31
Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic | Stochastic Stochastic
0 0 0 0 0 0 0 0
0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26
0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23
Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic | Stochastic Stochastic
0 0 0 0 0 0 0 0
1 1 0 1 0 1 1 1
0.34 0.34 0 0.34 0 0.34 0.34 0.34
Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic | Stochastic Stochastic
0 0 0 0 0 0 0 0
-0.97 -0.97 0 -0.97 0 -0.97 -0.97 -0.97
0.31 0.31 0 0.31 0 0.31 0.31 0.31
Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic | Stochastic Stochastic
0 0 0 0 0 0 0 0
0.2 0.2 0 0.2 0 0.2 0.2 0.2
0.2 0.2 0 0.2 0 0.2 0.2 0.2
Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic Stochastic | Stochastic Stochastic
0 0 0 0 0 0 0 0
0.75 1.06 1.27 1.21 7.97 6.4 4.32 0.319
296 202 38.1 458 238 1.21E+03 1.62E+03 120
0.463 0.396 0.213 0.733 1.33 2.45 2.66 0.199
1.55 2.18 2.63 2.48 16.4 12.9 8.93 0.66
18.5 19.6 30 29.9 188 118 107 7.87
1.1161 2.46936 1.39512 1.79971 8.71951 14.8581 6.43151 0.474341
0.36321 1.39434 0.120263 0.585679 0.751637 8.38967 2.09301 0.154365
BioBasin 2 -
Swale 2 Park Raingardens Buffer
29 34 35
BioRetention BioRetention
SwaleNode NodeV4 NodeV4 BufferNode

0.004 0 0
100 100
274 6 102.125896
0.65 0.3 0.15
3 1
17 1.7
10 3 3
8000 8000 8000
20 20 20
14
6000 6000 6000
0.13 0.13 0.13
0.13
500 500 500
1.4 1.4 1.4
1.4
3500
3 3
Off Off Off Off
Off Off Off Off
Off Off Off Off
Off Off Off Off
211 6
60 10
0.5 0.4
200 200
0.35 0.35

Page 41

Length (m)                                                                                                                                                        80          70
Bed slope                                                                                                                                                     0.005       0.005
Base Width (m)                                                                                                                                                   1.2         1.2
Top width (m)                                                                                                                                                    4.1         4.1
Vegetation height (m)                                                                                                                                          0.25        0.25

                                                 Vegetated      Vegetated      Vegetated      Vegetated      Vegetated      Vegetated      Vegetated                                Vegetated      Vegetated
                                                 with Effective with Effective with Effective with Effective with Effective with Effective with Effective                           with Effective with Effective
                                                 Nutrient       Nutrient       Nutrient       Nutrient       Nutrient       Nutrient       Nutrient                                 Nutrient       Nutrient
                                                 Removal        Removal        Removal        Removal        Removal        Removal        Removal                                  Removal        Removal
Vegetation Type                                  Plants         Plants         Plants         Plants         Plants         Plants         Plants                                   Plants         Plants
Total Nitrogen Content in Filter (mg/kg)                   400            400            400            400            400            400            400                                      400            400
Orthophosphate Content in Filter (mg/kg)                     50             50             50             50             50             50             50                                       50             50
Is Base Lined?                                   Yes            No             No             No             No             Yes            No                                       No             No
Is Underdrain Present?                           Yes            Yes            Yes            Yes            Yes            Yes            Yes                                      Yes            Yes
Is Submerged Zone Present?                       No             No             No             No             No             No             No                                       No             No
Submerged Zone Depth (m)
B for Media Soil Texture                                    13             13             13             13             13             13             13      -9999       -9999                13             13       -9999
Proportion of upstream impervious area treated                                                                                                                                                                            0.5
Exfiltration Rate (mm/hr)                                    0              0              0              0              0              0              0           0           0                0              0            0
Evaporative Loss as % of PET
Depth in metres below the drain pipe
IN - Mean Annual Flow (ML/yr)                             2.14          9.87            3.55           4.31         0.807            1.71           2.11          1.9       3.36            18.7          0.763         0.319
IN - TSS Mean Annual Load (kg/yr)                          324     1.58E+03              699            662           307             166            484           39        111       3.06E+03            91.8           120
IN - TP Mean Annual Load (kg/yr)                         0.699          3.33            1.34             1.4        0.494            0.45          0.897       0.255       0.515            6.44          0.222         0.199
IN - TN Mean Annual Load (kg/yr)                          4.42          20.3            7.29           8.93          1.69            3.52           4.36        1.74          3.7           38.3           1.56          0.66
IN - Gross Pollutant Mean Annual Load (kg/yr)             47.7           212            79.5              94         19.9            36.5           48.4            0           0            412           15.7          7.87
OUT - Mean Annual Flow (ML/yr)                            2.08            9.5           3.36           4.26         0.783            1.67             1.9         1.9       3.36            18.2          0.749         0.319
OUT - TSS Mean Annual Load (kg/yr)                        44.9           247             111            256          58.3            49.2              39       20.2        54.5             545             34          76.5
OUT - TP Mean Annual Load (kg/yr)                        0.278            1.3          0.515          0.809         0.165           0.257          0.255       0.229       0.436             2.7           0.13         0.152
OUT - TN Mean Annual Load (kg/yr)                         1.98          8.94              3.7          5.79         0.907            1.91           1.74        1.75        3.67              18          0.925         0.593
OUT - Gross Pollutant Mean Annual Load (kg/yr)               0              0               0              0            0               0               0           0           0              0              0          7.87
Flow In (ML/yr)                                       2.14031       9.86409         3.54659        4.31309      0.806372         1.71289        2.11429     1.90084     3.35972         18.6825       0.763022      0.318748
ET Loss (ML/yr)                                    0.0610429       0.363982        0.186365     0.0586939      0.0229932         0.04166       0.211811             0           0      0.513396      0.0140031              0
Infiltration Loss (ML/yr)                                    0              0               0              0            0               0               0           0           0              0              0             0

No Generic treatment nodes

Other nodes
Location                                         Junction - Ck off
                                                               Junction
                                                                   Blue Wren
                                                                         - eastPlace
                                                                               Receiving
                                                                                west gullyNode
                                                                                             Junction
                                                                                               - Tributary
                                                                                                      westofside
                                                                                                              Sixstg5
                                                                                                                  Mile gully
                                                                                                                       Ck
ID                                                          21             38             39             40
Node Type                                        JunctionNode JunctionNode ReceivingNode     JunctionNode
IN - Mean Annual Flow (ML/yr)                             11.4          13.3           42.8           18.2
IN - TSS Mean Annual Load (kg/yr)                          500            341     1.39E+03             545
IN - TP Mean Annual Load (kg/yr)                          1.92          1.84           6.46             2.7
IN - TN Mean Annual Load (kg/yr)                          13.6          12.8           44.5              18
IN - Gross Pollutant Mean Annual Load (kg/yr)             7.87              0          7.87               0
OUT - Mean Annual Flow (ML/yr)                            11.4          13.3               0          18.2
OUT - TSS Mean Annual Load (kg/yr)                         500            341              0           545
OUT - TP Mean Annual Load (kg/yr)                         1.92          1.84               0            2.7
OUT - TN Mean Annual Load (kg/yr)                         13.6          12.8               0             18
OUT - Gross Pollutant Mean Annual Load (kg/yr)            7.87              0              0              0
% Load Reduction                                          4.17          3.41           3.34           2.77
TSS % Load Reduction                                      78.9          83.5           81.5           82.2
TN % Load Reduction                                       44.3          54.6           51.1           52.8
TP % Load Reduction                                       57.8             59          58.2           58.1
GP % Load Reduction                                         97            100          99.2            100

Links
Location                                         Drainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage LinkDrainage Link
Source node ID                                             12           13           16           19           18            1            3            2            8            6            7           15           17           24           25           26           27           28           14           29           31           32           33            9
Target node ID                                             14           14           17           20           20            4            4            4            5            5            5           21           21           27           27           27           28           21           29           21           34           34           34           15
Muskingum-Cunge Routing                          Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed Not Routed
Muskingum K
Muskingum theta
IN - Mean Annual Flow (ML/yr)                            1.06           1.27          0.807          0.757          0.956          0.478          0.643        1.02         1.73             4.31          3.82         4.26    0.783   0.493   0.637      0.985           1.9          1.9        3.36         3.36         7.97          6.4         4.32         1.91
IN - TSS Mean Annual Load (kg/yr)                         202           38.1            307            137           28.4            177            116        30.5          655              814           114          256     58.3    91.7    19.1        373            39        20.2          111         54.5          238    1.21E+03     1.62E+03          57.2
IN - TP Mean Annual Load (kg/yr)                        0.396          0.213          0.494          0.291          0.158          0.292          0.241       0.167         1.09             1.61         0.634        0.809    0.165   0.185   0.106      0.605        0.255        0.229        0.515        0.436         1.33         2.45         2.66        0.316
IN - TN Mean Annual Load (kg/yr)                         2.18           2.63           1.69           1.52              2              1             1.3       2.11           3.6            8.72          8.02         5.79    0.907   0.998    1.34       2.02         1.74         1.75           3.7        3.67         16.4         12.9         8.93         4.01
IN - Gross Pollutant Mean Annual Load (kg/yr)            19.6             30           19.9           13.9           22.5           11.8           11.8          24         42.8             79.2          90.1            0        0    9.06      15       24.3             0            0            0           0          188          118          107         45.1
OUT - Mean Annual Flow (ML/yr)                           1.06           1.27          0.807          0.757          0.956          0.478          0.643        1.02         1.73             4.31          3.82         4.26    0.783   0.493   0.637      0.985           1.9          1.9        3.36         3.36         7.97          6.4         4.32         1.91
OUT - TSS Mean Annual Load (kg/yr)                        202           38.1            307            137           28.4            177            116        30.5          655              814           114          256     58.3    91.7    19.1        373            39        20.2          111         54.5          238    1.21E+03     1.62E+03          57.2
OUT - TP Mean Annual Load (kg/yr)                       0.396          0.213          0.494          0.291          0.158          0.292          0.241       0.167         1.09             1.61         0.634        0.809    0.165   0.185   0.106      0.605        0.255        0.229        0.515        0.436         1.33         2.45         2.66        0.316
OUT - TN Mean Annual Load (kg/yr)                        2.18           2.63           1.69           1.52              2              1             1.3       2.11           3.6            8.72          8.02         5.79    0.907   0.998    1.34       2.02         1.74         1.75           3.7        3.67         16.4         12.9         8.93         4.01
OUT - Gross Pollutant Mean Annual Load (kg/yr)           19.6             30           19.9           13.9           22.5           11.8           11.8          24         42.8             79.2          90.1            0        0    9.06      15       24.3             0            0            0           0          188          118          107         45.1

Catchment Details
Catchment Name                                   1225_Cooroy 1992 - 2002_April2013_Version2
Timestep                                         6 Minutes
Start Date                                          1/01/1992
End Date                                           31/12/2001
Rainfall Station                                  40059 COOROY
ET Station                                       User-defined monthly PET
Mean Annual Rainfall (mm)                                1398
Mean Annual ET (mm)                                      1652

Page 42

Drainage Link
10
15
Not Routed

1.65
309
0.621
3.36
30.4
1.65
309
0.621
3.36
30.4

Drainage Link
WW
15
Not Routed

0.75
296
0.463
1.55
18.5
0.75
296
0.463
1.55
18.5

Drainage Link
30
14
Not Routed

1.21
458
0.733
2.48
29.9
1.21
458
0.733
2.48
29.9

Drainage Link

Not Routed

23
35

0.445
82.1
0.169
0.892
8.18
0.445
82.1
0.169
0.892
8.18

Drainage Link
22
35
Not Routed

0.319
9.66
5.30E-02
0.667
7.51
0.319
9.66
5.30E-02
0.667
7.51

Drainage Link

Not Routed

36
37

0.319
120
0.199
0.66
7.87
0.319
120
0.199
0.66
7.87

Drainage Link

Not Routed

37
a1

0.319
76.5
0.152
0.593
7.87
0.319
76.5
0.152
0.593
7.87

Drainage Link

Not Routed

4
38

2.08

0.278
1.98

2.08

0.278
1.98

Drainage Link

Not Routed

5
38

9.5
247
1.3
8.94

9.5
247
1.3
8.94

Drainage Link
20
38
Not Routed

1.67
49.2
0.257
1.91

1.67
49.2
0.257
1.91

Drainage Link

Not Routed

38
39

13.3
341
1.84
12.8

13.3
341
1.84
12.8

Drainage Link

Not Routed

21
39

11.4
500
1.92
13.6
7.87
11.4
500
1.92
13.6
7.87

Drainage Link

Not Routed

34
40

18.2
545
27

18.2
545
27

Drainage Link

Not Routed

40
39

18.2
545
27

18.2
545
27

Drainage Link

Not Routed

35
Pal

0.749
34
0.13
0.925

0.749
34
0.13
0.925

Page 43

                                                           Callaghan & Toth

APPENDIX 3                               -   Site Photos




Western Tributary – looking from Blue Wren Court




Western Tributary – opposite proposed Lot 20




55 Lake MacDonald Drive – Stage 1 to 5                                 pg. C

Page 44

                                               Callaghan & Toth




Western Tributary – opposite proposed Lot 30




Eastern Tributary – To the west of Stage 1




55 Lake MacDonald Drive – Stage 1 to 5                     pg. D

Page 45

                                                                         Callaghan & Toth




Eastern Tributary – western bank




Eastern Tributary – western bank – showing lack of vegetation from top of bank out




55 Lake MacDonald Drive – Stage 1 to 5                                               pg. E

Page 46

Callaghan & Toth

 

APPENDIX 4 - BSM Flood Report

 

55 Lake MacDonald Drive — Stage 1 to 5 pg. F

Page 47

    Brisbane Stormwater Management Pty Ltd




              VALKEV PTY LTD




 STORMWATER DETENTION AND FLOODING
  FOR SUBDIVISION OF LOT2 ON RP173883
  AND LOTS 135, 136 AND 137 ON MCH978
AT ELM STREET AND LAKE MACDONALD DRIVE

                   COOROY




                30 APRIL 2014

Page 48

      SUBDIVISION OF LOT 2 ON RP173883 AND LOTS 135, 136 AND 137 ON MCH 978

                AT ELM STREET AND LAKE MACDONALD DRIVE, COOROY



                  STORMWATER DETENTION AND FLOODING REPORT

     COMPILED FOR VALKEV P/L BY BRISBANE STORMWATER MANAGEMENT P/L



                                  DOCUMENT CONTROL SHEET



Document Title: Stormwater Detention And Flooding For Subdivision Of Lot 2 On RP173883 And
                Lots 135, 136 And 137 On MCH978, At Elm Street & Lake Macdonald Drive, Cooroy

Client:          Valkev Pty Ltd

BSM Job No:      2013-08

Project Manager: Denis Ogle



Distribution:

Doc Filename  Status Format      Issued To              Date
ValkevSDF.Doc Draft Pdf          Callaghan & Toth P/L   28/4/14
                                 BSM – Office           28/4/14
ValkevSDF.Doc Final     Pdf &    Callaghan & Toth P/L   30/4/14
                        Hardcopy BSM – Office Copy      30/4/14




Brisbane Stormwater Management P/L
92 Alkoomie St, PO Box 8119, Wynnum Nth, Q4178
Ph (07)33963383, Email [email protected]




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 1

Page 49

List Of Contents

1.    Summary                                                               3

2.    Introduction                                                          4

3.    Stormwater Detention Requirement                                      5

4.    Stormwater Discharges To No 2 Pearsons Road                           6

5. Runoff Rates To Floodway Model                                            8
5.1 Catchment Areas And Subdivision                                          8
5.2 Design Rainfall Data                                                     8
5.3 Model Calibration                                                       10
5.4 Linkage From Catchment Model To Floodway Model                          11

6.    Floodway Profiles, Pre-Development                                    13

7. Floodway Profiles, Post-Development                                      17
7.1 Mitigation Concept For Increased Stormwater Runoff                      17
7.2 Model Simulation                                                        17
7.3 Sensitivity Test                                                        18

8.    Certification                                                         19


List Of Figures (following text)

1     Locality And Lot Plan
2     Urbs Models Of Stormwater Detention Requirement
3     Proposed Change In Discharge Scenarios To No 2 Pearsons Road
4     Catchment Subdivision For Pre-Development Urbs Model
5     Catchment Subdivision For Post-Development Urbs Model
6     XPStorm Hydraulic Model Network
7     Photographs Of Eastern Floodway On 25 November 2013
8     Photographs Of Western Floodway On 25 November 2013
9     Proposed Floodway Modifications
10    Longitudinal Floodway Profiles
11    Floodway Cross-Section Changes – West Tributary
12    Footbridge And Bio-Basin Schematics
13    Flood Levels And Flood Boundaries


Appendices

A.     Design Rainfall Data
B.     Rational Method Calculations Of Floodway Inflows, Pre-Development
C.     Rational Method Calculations Of Floodway Inflows, Post-Development
D.     Floodway Storage Volumes




     Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc    Page 2

Page 50

1.0      SUMMARY

This analysis has found that the development’s stormwater detention requirement can be achieved by
enlarging the flood storage on the site, by the means shown on Figures 9 to 11 of this report, to augment
the small amount of conventional detention storage that can be gained in two bio-basins on the site (as in
Figure 12). The additional storage volumes generated by these works, after allowing for the small
amounts of flood storage that will be lost to filling of lot margins and active parkland, are compared to
the detention storages that would be required of a fully-conventional detention system, in Table S1:

Table S1:  Comparison Of Pre-Development And Post-Development Floodplain Volumes (m3)
           To Required Detention Volumes
                       1Year     2 Year  5 Year    10 Year   20 Year      50 year   100 Year
  Pre-Development      5456       6184    8515       9927     11352       12986       14493
  Floodway Storage
  Post-Development     5781       6591    9349      11121     12976       14807       16240
  Floodway Storage
   Floodway Gain        325       407      834       1194      1624        1821       1747
   Plus Bio-Basins      162       183      252        252       252         252         252
 Less Active Park Fill   -0         -0      -0         -0        -0         -18         -45
      Nett Gain         487       590     1086       1446      1876        2055       1954
 Req’d Extra Volume
   (From Table 3)       395       525     770        910       1095        1370       1585

The abovementioned works, together with a minor regrading of the invert profile around node 5 (as also
shown on Figure 10) will result in the development having practically nil adverse impact on flood levels
on adjoining properties, as summarised in Tables 16 to 18 of this report. The only exception to this
generality is at node 23, just upstream of the site boundary in the western tributary, where the affluxes
will range from 0.02 metre in a 10 year storm to 0.05 metre in a 100 year storm. The western channel
between node 23 and the site boundary was designed in 2006 to be deliberately revegetated to a
Manning’s n of 0.15, as part of the adjoining Blue Wren Place development. That revegetation was
installed at the time of that development, but has since been removed, thereby reducing the present (“pre-
development”) Manning’s n in this area to about 0.04, consequently decreasing the flood levels at node
23 to about 0.4 metre below the original design levels. The post-development flood levels as a result of
Valkev’s development, while being 0.02 to 0.05 metre above the present levels, will nevertheless be at
least 0.3 metre below the original design levels for this area, and the quoted affluxes are therefore
suggested to be of no consequence. This is illustrated by the levels of the adjoining lot in Blue Wren
Place, which are marked on the longitudinal floodway profiles in Figure 10 of this report.

The works will also result in nil adverse impact on downstream peak flow rates, apart from a slight
increase in flows along the western tributary through the immediately adjoining downstream property
(No2 Pearsons Road). That increase on the adjoining property results in the deliberate diversion of local
runoff away from that adjoining property, and directly to the western floodway upstream of that property.
Downstream of the natural point of inflow to the floodway for that runoff, on the adjoining property, the
flows revert to their pre-development rates.

The consequent flood levels for design of the development are summarised in Tables 16 to 18 and in
Figures 13 of this report. A sensitivity test has identified the impact of uncontrolled floodplain regrowth
on the abovementioned design levels. The consequent 100 year flood levels are summarised in Table 21
and in Figures 13, and appropriate account should be taken of these possible flood levels when
considering appropriate design levels for the development.



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                           Page 3

Page 51

2.0      INTRODUCTION

This report describes Brisbane Stormwater Management P/L’s (BSM’s) stormwater detention and
flooding assessment of a proposed subdivision of Lot 2 on RP173883 and Lots 135, 136 and 137 on
MCH978, at Elm Street and Lake Macdonald Drive, Cooroy. The site locality and the proposed lot layout
are shown in Figure 1 of this report.

The site is traversed by two tributaries of Six Mile Creek, hereafter described as the eastern and western
tributaries. The catchment areas of the two tributaries are shown in Figure 4, and the tributary floodways
can be seen in more detail in Figure 6.

Some of the increased stormwater runoff from the proposed residential areas is proposed to be mitigated
by conventional detention volumes in two bio-retention basins, but most of the increased runoff is
proposed to be attenuated by an increase in the floodway storage on the site. The increased floodway
storage will be achieved by deliberately “roughening” the floodways (by revegetating the riparian zones,
as required by Council) and by constructing a restrictive footbridge across the eastern tributary to back-up
the flood profiles in that tributary floodway.

Hydraulic model analyses of the interaction between increased site runoff and floodway through-flows
can be skewed by “hydrograph separation”, whereby the urbanisation of a particular site is predicted to
hasten the discharge of the increased site runoff down the floodway before the arrival of the major
floodway flows from the upstream catchment – which can lead to a perception that the peak flow-rates
along the floodway will not be significantly increased, which in turn leads to a perception that little or no
attenuation volume is required. This perception may be valid for a site development that is considered in
isolation, but it becomes invalid when the “equal opportunity” development of all such sites in the
catchment is collectively considered.

To overcome the abovementioned modelling difficulty without resorting to a catchment-wide “equal
opportunity” analysis, this assessment has firstly determined the detention volume that would be required
for a fully-conventional system of dedicated basins on the site’s stormwater outlets. The assessment was
thereafter focussed on achieving at least that volume from the proposed combination of bio-basin
detention and increased floodway volume, while also using a floodway model to verify that the proposed
changes to the floodway profiles on the site would not adversely affect the flood profiles upstream and
downstream of the site.

The development proposal is particularly cognisant of the need to not increase local stormwater
discharges (as distinct from tributary channel through-flows) onto an adjoining property to the north –
namely No 2 Pearsons Road (refer Figure 1). This is proposed to be achieved by diverting part of the
runoff from the relevant sub-catchment, directly across to the western tributary floodway within the site.
This diversion proposal had to be accounted in the floodway modelling process.

The assessment process was therefore structured as follows:

-     Determination of the required detention volume - as described in Section 3 of this report.

-     Devising a diversion mechanism, in liaison with the applicant’s civil consultant (Callaghan & Toth),
      to ensure no increase in stormwater discharges to No 2 Pearson Road – as described in Section 3.

-     Calculation of the runoff rates to the floodways and running them though floodway models of the pre
      and post-development scenarios – as described in Sections 4 to 7.



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                             Page 4

Page 52

3.0     STORMWATER DETENTION REQUIREMENT

As already noted in Section 1, the increased rates of stormwater runoff from the site are proposed to be
mitigated partly by conventional detention storage in two bio-basins and partly by increased floodway
storage on the site, with a requirement that the combined volume of those two storages should be at least
equal to the detention volume that would be required for a fully-conventional system.

The detention volume that would be required for a fully-conventional system has been determined by
compiling hydrologic models of four distinct parts of the proposed development platform, notated as
models A, B, C and D in Figure 2 of this report.

The attenuation objective for each of the four models was set by Rational Method calculations of the pre-
and post-development peak flow rates, as summarised in Tables 1 and 2 hereafter. The contributing areas
shown for Area A in Tables 1 and 2 are slightly less than the actual area of 2.49 hectare, because of
partial-area criticality (refer Figure 2 for partial-area limits).

Table 1:     Rational Method Calculations Of Pre-Development Peak Flow Rates
 Area     C10     Tc                     I (mm/hr)                 A                          Q (m3/s)
                 (min)   1 / 2 / 5 / 10 / 20 / 50 / 100           (Ha)     1 / 2 / 5 / 10 / 20 / 50 / 100
  A       0.72    24     65 / 73 / 98 / 116 / 130 / 152 / 166     2.43   0.25 / 0.30 / 0.45 / 0.56 / 0.66 / 0.85 / 0.97
  B       0.70    18     75 / 84 / 112 / 132 / 151 / 172 / 192    0.85   0.10 / 0.12 / 0.18 / 0.22 / 0.26 / 0.33 / 0.38
  C       0.70    20     71 / 80 / 106 / 127 / 142 / 165 / 180    1.85   0.20 / 0.24 / 0.36 / 0.46 / 0.54 / 0.68 / 0.78
  D       0.70    16     80 / 90 / 120 / 140 / 158 / 183 / 202    1.34   0.17 / 0.20 / 0.30 / 0.37 / 0.43 / 0.55 / 0.63

Table 2:     Rational Method Calculations Of Post-Development Peak Flow Rates
 Area     C10     Tc                     I (mm/hr)                 A                          Q (m3/s)
                 (min)   1 / 2 / 5 / 10 / 20 / 50 / 100           (Ha)     1 / 2 / 5 / 10 / 20 / 50 / 100
  A       0.78    18     75 / 84 / 112 / 132 / 151 / 172 / 192    2.34   0.30 / 0.36 / 0.54 / 0.67 / 0.80 / 1.00 / 1.17
  B       0.80    13     89 / 100 / 133 / 155 / 175 / 201 / 221   0.85   0.13 / 0.16 / 0.24 / 0.29 / 0.35 / 0.44 / 0.50
  C       0.80    14     86 / 96 / 129 / 150 / 169 / 194 / 214    1.85   0.28 / 0.34 / 0.50 / 0.62 / 0.73 / 0.92 / 1.06
  D       0.80    11     93 / 105 / 141 / 163 / 186 / 215 / 235   1.34   0.22 / 0.27 / 0.40 / 0.49 / 0.58 / 0.74 / 0.84

Version 3.5g of the URBS software was used as the basis for the hydrological models of Areas A to D.
Each of those areas was modelled as a sub-area network, using the subdivision lines indicated on Figure
2. Each of the four models was based on post-development conditions and was calibrated to closely
match its peak outflow rates to the Rational Method calculations of the post-development flow rates (as
in Table 2). A hypothetical detention basin was then added to the outlet of each model, with its storage-
discharge characteristics adjusted so as to reduce the peak outflow rates to the Rational Method
calculations of the pre-development flow rates (as in Table 1). The resultant storage requirements are
summarised in Table 3, below:

Table 3:     Required Detention Volumes (m3) For Fully-Conventional System
  Area       1 Yr     2 Yr     5 yr   10 Yr 20 Yr       50 yr 100 Yr
   A         130      170      245     290      355      445     520
   B          60       80      110     130      150      195     220
   C         130      175      260     300      360      425     495
   D          75      100      155     190      230      305     350
 Total       395      525      770     910     1095     1370     1585




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                                      Page 5

Page 53

4.0     STORMWATER DISCHARGES TO No 2 PEARSONS ROAD

A catchment area of 2.49 hectares presently drains across the northern boundary of the site and onto No 2
Pearsons Road, as shown for the pre-development scenario in Figure 3. Local stormwater discharges onto
the adjoining property will be maintained at or below their existing rates by diverting part of the runoff
from the relevant catchment, directly across to the western tributary floodway within the site, as shown
for the post-development scenario in Figure 3.

The existing discharge rates to the adjoining property, as calculated by the Rational Method for the
partial-area of 2.43 hectares shown in Figure 3, are summarised in Table 4 below:

Table 4:        Rational Method Calculations Of Pre-Development Peak Flow Rates To No 2 Pearson Road
 C10          Tc                    I (mm/hr)                 A                          Q (m3/s)
             (min)    1 / 2 / 5 / 10 / 20 / 50 / 100         (Ha)      1 / 2 / 5 / 10 / 20 / 50 / 100
 0.72         24      65 / 73 / 98 / 116 / 130 / 152 / 166   2.43    0.25 / 0.30 / 0.45 / 0.56 / 0.66 / 0.85 / 0.97



In the post-development scenario, runoff from the 2.40 hectare post-development catchment (excluding a
0.018 hectare drainage corridor connecting to the adjoining property) will be collected at the sag in the
proposed road, from which flows up to Q5 will be diverted eastward by piping along the road, to the
western tributary channel. Flows in excess of Q5 at the sag will discharge overland, through the
abovementioned drainage corridor, to the adjoining property.

The Q5 diversion capacity, as calculated by the Rational Method for a partial area of 2.25 hectares, is
summarised in Table 5, below:

Table 5:        Rational Method Calculation Of Q5 Diversion Capacity
      C10            Tc (min)       I5 (mm/hr)            A (Ha)                        Q5 (m3/s)
      0.78              18              112                2.25         0.00278 x (0.95 x 0.78) x 112 x 2.25 = 0.52

The post-development discharge rates to the adjoining property up to Q5, being just the runoff from the
surface of the connecting drainage corridor, are calculated by the Rational Method as in Table 6 below.
These flow rates are all practically zero.

Table 6:        Rational Method Calculations Of Post-Development Flows Up To Q5 To No 2 Pearson Road
      C10              Tc               I (mm/hr)                     A                      Q (m3/s)
                      (min)            1 / 2 / 5                    (Ha)                   1 / 2 / 5
      0.90             10             97 / 109 / 147                0.018              0.003 / 0.004 / 0.006

The post-development discharge rates to the adjoining property from Q10 to Q100, as calculated by the
Rational Method for the partial area of 2.30 hectares shown in Figure 3, are summarised in Table 7,
below:

Table 7: Rational Method Calculations Of Post-Development Flows Q10 - Q100 To No 2 Pearson Road
      C10              Tc               I (mm/hr)                    A                      Q (m3/s)
                      (min)        10 / 20 / 50 / 100               (Ha)             10 / 20 / 50 / 100
      0.78             18         132 / 151 / 172 / 192             2.30            0.66 / 0.79 / 1.00 / 1.15

                                                                                       Less 0.52 m3/s Q5, =
                                                                                    0.14 / 0.27 / 0.48 / 0.63




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                                             Page 6

Page 54

The consequent changes in local discharges from the site, to No2 Pearsons Road, are collated from
Tables 4, 6 and 7 and summarised in Table 8, below. The changes are seen to be non-adverse, from Q1 to
Q100.

Table 8: Changes To Local Stormwater Discharges (m3/sec) From Site To No 2 Pearsons Road
 Scenario              Q1        Q2         Q5        Q10         Q20       Q50      Q100
 Pre-Development      0.25      0.30       0.45       0.56       0.66       0.85      0.97
 Post-Development    0.003     0.004      0.006       0.14       0.27       0.48      0.63




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                         Page 7

Page 55

5.0     RUNOFF RATES TO FLOODWAY MODEL


5.1     Catchment Areas And Subdivision

Flood profiles along floodways such as the subject tributaries are affected by the hydraulic capacity of the
adjoining downstream reaches and by any waterway structures in those downstream reaches.
Accordingly, the Extran model extends some distance downstream of the site to the convergence of the
two tributaries just downstream of Pearsons Road, as shown in Figure 3. The catchment modelling
therefore includes not just the contributing areas alongside and upstream of the site, but also the areas
downstream of the site to that termination point downstream of Pearsons Road. The extent of the 151.7
hectare overall catchment is shown in Figures 4 and 5. The site occupies 8.0 hectare, or about 5 percent,
of the overall catchment area.

The catchment has been subdivided into 23 subareas for modelling of the pre-development scenario (as in
Figure 3), and 41 subareas for the post-development scenario (as in Figure 4). The subdivision of the
areas external to the site is identical between the two scenarios, whereas the subdivision of those areas
which discharge to the floodways within the site are treated differently between the two scenarios, to
allow for accurate modelling of the increased runoff from the proposed urban development of 65 percent
of the site area. The modelling of the post-development scenario also accounts for the Q5 splits of the
inflows to the bio-basins, which necessitates doubling-up of the relevant six subareas, taking the total
sub-area count to 47 as marked on Figure 5. The impervious fractions applied to each of the modelled
subareas are summarised in Table 9, on the following page of this report.


5.2     Design Rainfall Data

The Bureau of Meteorology has recently updated the rainfall intensity-frequency-duration data that was
previously published in Volume 1 of Australian Rainfall and Runoff (1987). The previous data was based
on rainfalls recorded up to 1985, whereas the latest data is based on rainfalls recorded up to 2010 / 2011.
There has also been a change of nomenclature, whereby the previous description of severity in terms of
“average recurrence interval” has been updated to “annual exceedence probability” for storms from 2-
year to 100 year severity. Rainfall intensities for the 1 year severity are still quoted for an average
recurrence interval of once per year. The updating has increased the rainfall intensities at higher ARI’s
(or lesser exceedence probabilities) by about 4 percent, compared to the previous data. The updated
intensity-frequency-duration data for Cooroy is reproduced in Appendix A of this report.




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 8

Page 56

Table 9: Impervious Fractions Assigned To Urbs Model Subareas

 

Pre-Development Scenario

Post-Development Scenario

 

 

 

 

 

 

Subarea Impervious Subarea Impervious
(Figure 1) Fraction (Figure 2) Fraction

1 0.10 1 0.10
2 0.15 2 0.15
3 0.15 3 0.15
4 0.35 4 0.35
5 0.15 5 0.15
6 0.50 6 0.50
7 0.20 7 0.30
8 0.06 8 0.60
9 0.10 9 0.00
10 0.30 10 0.60
11 0.30 11 0.50
12 0.58 12 0.50
13 0.65 13 0.50
14 0.28 14 0.50
15 0.45 15 0.50
16 0.45 16 0.50
17 0.00 17 0.50
18 0.04 18 0.50
19 0.08 19 0.60
20 0.31 20 0.00
21 0.35 21/22 0.30
22 0.25 23 0.37
23 0.45 24 0.58
25 0.65

26 0.28

27 0.45

28 0.45

29/39 0.15

30/40 0.15

31/41 0.50

32/42 0.50

33/43 0.55

34 0.55

35 0.55

36 0.45

37 0.08

38 0.60

44 0.39

45 0.35

46 0.25

47 0.45

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc

Page 9

Page 57

5.3     Model Calibration

The catchment runoff processes have been modelled with the “basic” variant of Version 3.5g of the Urbs
software, with the “Rational Method” procedure invoked so as to improve the routing simulation within
individual subareas, and with rainfalls converted to runoff via the initial/continuing loss procedure. The
operating parameters of the model which affect the outcome of the simulation are the storage lag
parameter (alpha), the non-linearity parameter (m), the initial rainfall loss (IL) and the continuing rainfall
loss (CL).

Ideally, the operating parameters should be calibrated to observed rainfall and runoff data in the subject
catchment, using either data from particular storm events or derived statistical data via a frequency curve
of recorded flows. In this instance, there is a streamgauge further downstream in the broader catchment
(at Cooran, where the contributing catchment area is 180 square kilometres, or about 120 times larger
than the subject catchment). This gauge has been recording flood flows for 60 years, but the accuracy of
its height/flow rating curve has been confirmed by current-metering to only just above the 1-in-2 year
flood height, which means that its usefulness for model calibration to flows of 5 year or greater severity
is very questionable.

The calibration has therefore reverted to an alternative process involving three stages:

- Calibration to Rational Method calculations of the peak flow rates from individual subareas and groups
  of subareas.

- Comparing the calibrated parameters from the first stage to the corresponding parameters from
  previous calibrations to other morphologically similar catchments with more highly rated streamgauge
  data.

- Comparing the predicted peak flow rates at particular locations in the modelled area to the
  corresponding flow rates in the 2002 L&T floodway model.

The Rational Method calibration has been applied to the peak flow rates entering the floodway model
near the upstream boundaries of the site and to the peak inflow rates from each of the subareas which
discharge to the floodway within the subject site. The relevant calculations are summarised in
Appendices B and C of this report, for the pre- and post-development scenarios respectively. An
acceptably close calibration to these calculated peak flow rates was achieved, as in Table 10 below and in
Table 11 on the following pages of this report, using an alpha parameter of 0.85 an m parameter of 0.8,
an initial rainfall loss of 16 mm, and a continuing rainfall loss of 2 mm/hour. The alpha parameter for
individual small subareas which discharge overland flow mostly as shallow sheet flow was increased by
arbitrarily applying reach factors of up to 3.

Table 10 :     URBS / Rational Method Peak Flow Calibration (m3/sec) For Pre-Development Scenario
              (Refer Figure 4 For Subarea Locations)
 Subareas       1 year        2 year        5 Year        10 Year        20 year        50 year       100 Year
   1–5         5.2 / 6.0     6.7 / 7.6    11.2/ 11.5     14.5 / 14.2   17.4 / 16.9    21.4 / 21.5    24.8 / 24.6
     7        0.29 / 0.29   0.36/ 0.35    0.54 / 0.52    0.64 / 0.63   0.78 / 0.75    0.96 / 0.95    1.10 / 1.10
     8        0.24 /0.25    0.30 /0.30    0.47 / 0.45    0.56 / 0.55   0.68 / 0.65    0.83 / 0.83    0.96 / 0.96
     9        0.21 / 0.23   0.26 / 0.27   0.40 / 0.40    0.49 / 0.49   0.60 / 0.59    0.74 / 0.74    0.85 / 0.85
  12 – 16      4.8 / 4.8     6.1 / 5.8     9.3 / 8.6     11.2 / 10.8   13.6 / 12.8    16.5 / 16.2    18.8 / 18.7
    17        0.19 / 0.22   0.24 / 0.26   0.39 / 0.38    0.48 / 0.48   0.59 / 0.57    0.72 / 0.71    0.82 / 0.83
    18        0.20 / 0.21   0.25 / 0.26   0.39 / 0.38    0.47 / 0.47   0.57 / 0.56    0.70 / 0.71    0.81 / 0.81
    19        0.19 / 0.21   0.23/ 0.25    0.37 / 0.37    0.46 / 0.46   0.56 / 0.54    0.69 / 0.70    0.79 / 0.79




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 10

Page 58

Table 11     URBS / Rational Method Peak Flow Calibration (m3/sec) For Post-Development Scenario
             (Refer Figure 5 For Subarea Locations)
 Subareas        1year        2 year        5 Year        10 Year        20 year        50 year       100 Year
    7         0.30 / 0.30   0.37 / 0.36   0.56 / 0.54   0.68 / 0.67    0.81 / 0.79    1.00 / 1.00    1.14 / 1.15
    8         0.05 / 0.05   0.06 / 0.06   0.10 / 0.09   0.12 / 0.11    0.14 / 0.13    0.17/ 0.17     0.19 / 0.19
    9         0.13 /0.14    0.17 /0.16    0.27 / 0.25   0.33 / 0.30    0.39 / 0.36    0.47 / 0.46    0.53 / 0.53
  10-18       0.19 / 0.20   0.24 / 0.24   0.37 / 0.37    ---- /-----    ---- / ----    ---- / ----    ---- / ----
    19        0.06 / 0.06   0.08 / 0.08   0.12 / 0.11   0.14 / 0.14    0.17 / 0.17    0.20 / 0.21    0.23 / 0.24
    20        0.19 / 0.20   0.23 / 0.22   0.39 / 0.34   0.47 / 0.42    0.55 / 0.50    0.66 / 0.64    0.74 / 0.74
  25-35       0.37 / 0.39   0.47 / 0.46   0.71 / 0.68    ---- / ----    ---- / ----    ---- / ----    ---- / ----
    36        0.21 / 0.21   0.26 / 0.25   0.39 / 0.38   0.48 / 0.43    0.56 / 0.56    0.68 / 0.70    0.77 / 0.80
    37        0.10 / 0.11   0.13 / 0.13   0.20 / 0.19   0.24 / 0.24    0.29 / 0.28    0.36 / 0.35    0.41 / 0.41
    38        0.06 / 0.06   0.07 / 0.07   0.11 / 0.11   0.14 / 0.13    0.16 / 0.16    0.19 / 0.20    0.22 / 0.23


The calibrated parameters compare favourably with those inferred from other morphologically similar
catchments having more highly rated streamgauge data. In this instance, data have been inferred from
previous model calibrations to streamgauge records in Moggill Creek and Bulimba Creek in the outer
suburbs of Brisbane, with a comparison as in Table 12 below:

Table 12 Comparison Of Adopted Operating Parameters With Other Calibrations
   Operating Parameter       Adopted Values          Moggill, Bulimba Creeks
          Alpha                   0.85                     0.80 – 0.83
            m                     0.80                     0.75 – 0.80
         IL (mm)                   16                        15 – 20
        CL (mm/hr)                  2                          2-3


The predicted peak inflow rates to the upstream end of the floodway model also compare favourably to
the peak flow rates in L&T’s Mike 11 floodway model, as in Table 13, below:

Table 13 : Comparison of BSM / CLT Peak Flows (m3/sec) At Upstream Boundaries Of Site
 BSM Subareas  CLT Mike XS        10 Year       20 Year       50 Year      100 Year
 1–5            T3-789            14.4 / 12.1   17.3 / 16.1   21.3 / 21.8  24.8 / 25.7
 12 – 16        T2-457            11.2 / 11.0   13.5 / 13.2   16.5 / 16.5  18.8 / 18.7



5.4     Linkage From Catchment Model To Floodway Model

BSM’s in-house ‘UrbsInt’ and “AsciXP” subroutines were used to convert flow outputs from particular
subareas or groups of subareas within the Urbs model to inflow hydrographs at particular nodes within
the floodway model, as in Table 14, hereafter:




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 11

Page 59

Table 14:

Discharge Points From Urbs Hydrologic Model To XPStorm Hydraulic Model

 

Pre-Development Scenario

Post-Development Scenario

 

Urbs Subareas
(Location, Figure 4)

XPStorm Node
(Location, Figure 6)

Urbs Subareas
(Location, Figure 5)

XPStorm Node
(Location, Figure 6)

 

 

 

 

 

1-5 1 1-5 1
6 3 6 3

7 4 7 4

8 8 8 7

9 13 9 8
10 16 10 - 18 10
11 20 19 11
12-16 23 20 13
17 25 21 16
18 28 22 20
19 - 20 31 24 - 28 23
21 32 29 - 36 27
22 35 37 28
23 38 3823 29
44 31
45 32
46 35
47 38

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc

Page 12

Page 60

6.0     FLOOD PROFILES, PRE-DEVELOPMENT

Version 9.28 of the Extran software, as embedded in the XPStorm modelling suite, has been used to
convert the catchment runoff hydrographs to flood profiles along the floodways. The extent and detail of
the model are shown in Figure 3 of this report. Te model provides approximately three times the detail of
the Mike11 model which L&T used in 2002 to model these floodways. The model network also includes
a number of interconnecting links to provide for simulation of overflows between the two tributaries
where they are aligned in close proximity, downstream of the site.

This version of the Extran software includes a facility to specify different internodal distances for the left
overbank, channel and right overbank segments, which in turn provides for a reasonably accurate
calculation by the software of the internodal flood volumes up to the peak flood level profile. This feature
was vital for checking that the reshaping of the floodway in the post-development scenario achieves the
required stormwater detention volumes, over-and-above the existing floodway volumes. Accordingly,
this facility was invoked for this analysis and separate internodal distances were measured and applied to
each connecting link of the model network.

Field-surveyed spot heights, which can be seen in the background of Figure 6 were used to define the
cross-section shape of each of the links between adjoining nodes of the model. The Manning’s n values
of the channel and overbank sectors of the floodways were perceived by site inspection. The adopted
values ranged from 0.035 for open grassed paddock or park, to 0.150 in densely timbered areas.
Examples of the adopted values are shown in Figures 7and 8 of this report.

The starting point for the simulations was the tailwater level just downstream of the convergence of the
two tributaries. Initial runs of the model, based on a “normal-depth” criterion at node 39 at the
downstream end of the model, simulated a 100 year tailwater level substantially higher than L&T’s
predicted tailwater level at this location. The slope of the outfall reach, between nodes 38 and 39, was
therefore artificially steepened so as to induce a simulated tailwater level much closer to the L&T level.

Initial runs of the model, for ARI’s of 2 year and 100 year, and for storm durations from 20 minutes to 9
hours, revealed that the critical storm durations varied from 1.5 hours to 3 hours along these floodways.
Accordingly, all subsequent simulations included three storm durations: - namely, 1.5, 2 and 3 hours.

The set-up of the model resulted in simulated flood levels near the upstream and boundaries of the site
that, apart from node 23, were generally at or slightly above the co-located levels from L&T’s Mike 11
model, as indicated in Table 15 below. Overall, the consistency between the two models appears to be
quite good, despite the considerable difference in network density between the two models.

Table 15 : Comparison of BSM / CLT Flood Levels (m) In Vicinity Of Site Boundaries
 BSM Node CLT X-Sect           10 year         20 Year            50 Year           100 Year
       3       T3-811      101.61 / 101.38 101.65 / 101.54 101.72 / 101.69 101.81 / 101.71
      16      T3-1199       99.60 / 99.58   99.68 / 99.61       99.74 / 99.68     99.79 / 99.71
      23       T2-389      100.98 / 101.33 101.05 / 101.39 101.12 / 101.47 101.17 / 101.51
      29       T2-611       99.89 / 99.82   99.95 / 99.89      100.01 / 99.97 100.05 / 100.05

The predicted pre-development peak flood levels at each node of the model, for ARI’s from 1to 100
years, are summarised in Tables 16 to 18 on the following pages of this report, where they are compared
to the corresponding post-development flood levels. The corresponding 100 year pre-development flood
profile is shown on Figure 10, and the pre-development 100 year boundary is mapped on Figures 9 and
13.



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                            Page 13

Page 61

Table 16:

NODE

Predicted 1 Year To 5 Year Flood Levels (m) And Affluxes (m)
(Pre-Development Levels Are Based On Existing Floodplain Condition)

(Post-Development Levels Are Based On Proposed Floodplain Condition)
(Yellow shading indicates areas within site)

PRE-DEV

EASTERN TRIBUTARY

ON Oak WD =

NNNMAHAHAHABaA nanny,
NH OCOANDAHKWNH =O

WESTERN TRIBUTARY

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

38
39

102.259
102.213
101.350
101.327
101.250
100.761
100.755
100.084
100.056
100.061
100.012
99.915
99.644
99.554
99.439
99.128
98.873
98.687
98.620
97.962
97.706
97.604

100.729
100.580
100.111
100.056
99.898
99.785
99.651
99.448
98.923
98.871
98.576
98.529
97.745
97.706
97.623

97.417
96.818

1 YEAR

POST-DEV AFFLUX

102.254
102.207
101.162
101.112
100.766
100.763
100.755
100.134
100.119
100.122
100.069
99.964
99.699
99.606
99.434
99.121
98.866
98.680
98.615
97.960
97.703
97.602

100.691
100.492
100.230
100.088
100.005
99.819
99.688
99.452
98.930
98.878
98.581
98.533
97.746
97.703
97.621

97.415
96.815

0.00
-0.01
-0.19
-0.22
-0.48

0.00

0.00

0.05

0.06

0.06

0.06
0.05
0.05
0.05
0.00
-0.01
-0.01
-0.01
-0.01
0.00
0.00
0.00

-0.04
-0.09
0.12
0.03
0.11

0.03
0.04
0.00
0.01

0.01

0.01

0.00
0.00
0.00
0.00

0.00
0.00

PRE-DEV POST-DEV AFFLUX

102.625
102.614
101.386
101.351
101.287
100.776
100.768
100.145
100.121
100.131
100.079
99.983
99.725
99.647
99.551
99.230
98.971
98.776
98.681
97.993
97.840
97.688

100.791
100.631
100.177
100.114
99.965
99.844
99.706
99.469
99.048
98.996
98.686
98.611
97.881
97.840
97.710

97.521
96.920

2 YEAR

102.635
102.624
101.200
101.134
100.783
100.780
100.769
100.203
100.200
100.205
100.149
100.040
99.777
99.689
99.545
99.224
98.966
98.771
98.678
97.992
97.841
97.689

100.768
100.562
100.297
100.156
100.075
99.891
99.758
99.477
99.053
99.000
98.692
98.614
97.882
97.841
97.710

97.521
96.920

0.01
0.01
-0.19
-0.22
-0.50
0.00
0.00
0.06
0.08
0.07
0.07
0.06
0.05
0.04
-0.01
-0.01
-0.01
0.00
0.00
0.00
0.00
0.00

-0.02
-0.07
0.12
0.04
0.11

0.05
0.05
0.01

0.00
0.00
0.01

0.00
0.00
0.00
0.00

0.00
0.00

PRE-DEV

102.977
102.969
101.542
101.479
101.395
100.846
100.829
100.295
100.299
100.323
100.270
100.195
99.963
99.887
99.799
99.471
99.192
99.057
98.832
98.088
98.033
97.841

100.923
100.730
100.317
100.233
100.095
99.969
99.833
99.538
99.266
99.223
99.036
98.832
98.084
98.032
97.927

97.721
97.124

5 YEAR

POST-DEV AFFLUX

102.978
102.969
101.368
101.213
100.871
100.867
100.849
100.473
100.461
100.457
100.404
100.272
99.992
99.926
99.792
99.461
99.186
99.053
98.830
98.086
98.031
97.839

100.923
100.709
100.433
100.297
100.213
100.032
99.893
99.549
99.265
99.221
99.033
98.830
98.082
98.031
97.924

97.718
97.121

0.00
0.00
-0.17
-0.27
-0.52
0.02
0.02
0.18
0.16
0.13
0.13
0.08
0.03
0.04
-0.01
-0.01
-0.01
0.00
0.00
0.00
0.00
0.00

0.00
-0.02
0.12
0.06
0.12
0.06
0.06
0.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc

Page 14

Page 62

Table 17 :

NODE

EASTERN
TRIBUTARY

OANoahkwh =

NVNUNMABAABBAAAA AH OG
NH COANDAHKWNH =O

WESTERN
TRIBUTARY

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

38
39

Predicted 10 Year To 50 Year Flood Levels (m) And Affluxes (m)
(Pre-Development Levels Are Based On Existing Floodplain Condition)

(Post-Development Levels Are Based On Proposed Floodplain Condition)
(Yellow shading indicates areas within site)

PRE-DEV POST-DEV AFFLUX

103.013
103.000
101.605
101.553
101.447
100.920
100.903
100.415
100.404
100.428
100.375
100.305
100.002
99.956
99.877
99.604
99.347
99.180
98.931
98.173
98.111
97.938

100.977
100.777
100.377
100.287
100.147
100.021
99.888
99.604
99.379
99.347
99.153
98.934
98.172
98.111
98.043

97.823
97.224

103.013
103.001
101.509
101.305
100.949
100.946
100.923
100.635
100.616
100.615
100.568
100.386
100.037
99.996
99.875
99.600
99.342
99.176
98.928
98.170
98.108
97.934

100.998
100.777
100.504
100.364
100.277
100.097
100.957
99.614
99.377
99.343
99.151
98.931
98.169
98.108
98.039

97.819
97.221

0.00
0.00
-0.10
-0.25
-0.50
0.03
0.02
0.22
0.21

0.19
0.19
0.08
0.04
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.02
0.00
0.13
0.08
0.13
0.08
1.07
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

103.045
103.028
101.654
101.611
101.484
100.983
100.963
100.552
100.538
100.532
100.476
100.405
100.031
100.000
99.930
99.678
99.441
99.252
99.022
98.272
98.200
98.066

101.047
100.831
100.438
100.346
100.213
100.079
99.946
99.663
99.494
99.448
99.216
99.025
98.271
98.200
98.163

97.935
97.333

103.044
103.027
101.599
101.366
100.973
100.967
100.938
100.751
100.716
100.723
100.673
100.506
100.151
100.051
99.930
99.678
99.441
99.252
99.021
98.271
98.199
98.065

101.078
100.850
100.577
100.438
100.346
100.170
100.033
99.668
99.494
99.448
99.216
99.025
98.271
98.199
98.162

97.934
97.332

PRE-DEV POST-DEV AFFLUX

0.00
0.00
-0.05
-0.25
-0.51
-0.02
-0.02
0.20
0.18
0.19
0.20
0.10
0.12
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.03
0.02
0.14
0.09
0.13
0.09
0.09
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

103.083
103.059
101.723
101.679
101.530
101.009
100.979
100.634
100.604
100.627
100.572
100.518
100.144
100.055
99.999
99.737
99.541
99.318
99.121
98.381
98.299
98.210

101.123
100.890
100.504
100.411
100.282
100.144
100.007
99.730
99.649
99.555
99.273
99.124
98.381
98.299
98.280

98.045
97.445

103.082
103.058
101.702
101.452
100.989
100.982
100.948
100.811
100.778
100.787
100.726
100.580
100.234
100.135
99.998
99.737
99.539
99.317
99.119
98.379
98.297
98.207

101.167
100.930
100.662
100.521
100.426
100.253
100.115
99.735
99.647
99.554
99.272
99.122
98.379
98.297
98.278

98.043
97.443

PRE-DEV POST-DEV AFFLUX

0.00
0.00
-0.02
-0.23
-0.54
-0.03
-0.03
0.18
0.17
0.16
0.15
0.06
0.09
0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.04
0.04
0.16
0.11
0.14
0.11
0.11
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc

Page 15

Page 63

Table 18: Predicted 100 Year Flood Levels (m) And Affluxes (m)
(Pre-Development Levels Are Based On Existing Floodplain Condition)
(Post-Development Levels Are Based On Proposed Floodplain Condition)
(Yellow shading indicates areas within site)

100 YEAR
NODE PRE-DEV POST-DEV AFFLUX

EASTERN

TRIBUTARY
1 103.110 103.110 0.00
2 103.080 103.079 0.00
3 101.805 101.745 -0.06
4 101.731 101.529 -0.20
5 101.561 101.042 -0.52
6 101.025 101.034 0.01
7 100.910 100.986 0.08
8 100.720 100.856 0.14

9 100.667 100.825 0.16
10 100.702 100.838 0.14
11 100.642 100.767 0.13
12 100.594 100.629 0.04
13 100.216 100.293 0.08
14 100.116 100.192 0.08
15 100.051 100.038 -0.01
16 99.791 99.786 0.00
17 99.606 99.600  -0.01
18 99.357 99.354 0.00
19 99.186 99.181 -0.01
20 98.451 98.444 = -0.01
21 98.363 98.357 = -0.01
22 98.308 98.298  -0.01
WESTERN
TRIBUTARY
23 101.173 101.226 | 0.05
24 100.932 100.984 0.05
25 100.544 100.716 0.17
26 100.454 100.574 0.12
27 100.325 100.476 0.15
28 100.186 100.297 0.11
29 100.047 100.147 0.10
30 99.817 99.813 0.00
31 99.766 99.758  -0.01
32 99.620 99.615  -0.01
33 99.307 99.304 0.00
34 99.189 99.184 0.00
35 98.451 98.444 = -0.01
36 98.363 98.356  -0.01
37 98.350 98.343 -0.01
38 98.110 98.103  -0.01
39 97.509 97.513 0.00

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 16

Page 64

7.0     FLOOD PROFILES, POST-DEVELOPMENT

7.1     Mitigation Concept For Increased Stormwater Runoff

The impact of the increased site runoff on flood profiles along the floodways is proposed to be mitigated
mostly by increasing the floodway storage on the site, and partly by conventional detention storage in
two of the proposed bio-basins. The increase in the floodway storage will be achieved by deliberately
roughening the floodways (by revegetating the riparian zones, as required by Council) and by
constructing a restrictive footbridge across the eastern tributary to back-up the flood profiles in that
tributary floodway.

A small additional amount of storage is also required to offset the minor intrusions of the development
platform into the pre-development 100 year flood boundary, and for some minor regrading of an artificial
hump in the existing low-flow channel around node 5 of the Extran model (as seen on Figure 10).

The full suite of the proposed modifications to the flood storage system is shown on Figure 9, with
additional detail on Figures 10 to 12.

The revegetation of the riparian zones, by planting of shrubs (typically, Lomandra sp) and trees at
densities of one item per 1.5 to 2 square metres, is presumed to increase the Manning’s n of the presently
grassed areas from 0.03/0.05 to 0.07.

The detention storages in the bio-basins are accounted as only the “live” storages, in the narrow range of
elevation between the riser overflow level and the weir level. The overflow level in the riser will be
controlled by an overflow slot in one side of the riser, with details as in Figure 12.

7.2     Model Simulation

An Extran model of the post-development scenario was compiled by adjusting a copy of the pre-
development model so as to include the reshaped and revegetated floodways and associated increases in
Manning’s n values, together with the inclusion of the proposed footbridge, the minor regrading of the
invert around Node 5, and hypothetical vertical walls at the boundaries of the proposed allotments.

The achievement of the required increase in floodplain volume, to offset the development’s stormwater
detention requirement, is summarised in Table 19, below:

Table 19:  Comparison Of Pre-Development And Post-Development Floodplain Volumes (m3)
           To Required Detention Volumes
                       1Year     2 Year  5 Year    10 Year   20 Year      50 year   100 Year
  Pre-Development      5456       6184    8515       9927     11352       12986       14493
  Floodway Storage
  Post-Development     5781       6591    9349      11121     12976       14807       16240
  Floodway Storage
   Floodway Gain        325       407      834       1194      1624        1821       1747
   Plus Bio-Basins      162       183      252        252       252         252         252
 Less Active Park Fill   -0         -0      -0         -0        -0         -18         -45
      Nett Gain         487       590     1086       1446      1876        2055       1954
         c.f.
 Req’d Extra Volume     395       525     770        910       1095        1370       1585
   (From Table 3)



      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                        Page 17

Page 65

The impact of the proposed development on peak flow rates downstream of the site is summarised in
Table 20, below. Flow rates leaving the site via the eastern tributary (nodes 15 – 16) will be slightly
reduced. Flow rates leaving the site via the western tributary (nodes 29-30) will increase, and this is a
result of the diversion of local stormwater runoff away from No 2 Pearsons Road and directly to the
western floodway. Further downstream along the western floodway, past the junction with the remaining
local runoff from that adjoining property (nodes 31-32), the post-development flows will revert to the
pre-development rates (within +/- 0.01 m3/sec). Further downstream, at the downstream end of the model
(nodes 38-39), where the two tributaries have converged, the flow-rates will be slightly reduced.

Table 20 :    Pre / Post-Development Peak Flow Rates (m3/sec) Through Downstream Properties
 Between      1 Year        2 Year      5 Year      10 Year       20 Year     50 Year     100 Year
  Nodes
 15 - 16      6.8 / 6.7     8.4 / 8.3    13.8 / 13.5   17.3 / 17.2   20.4 / 20.4   22.9 / 22.8   26.0 / 25.1
 29 - 30      5.1 / 5.7     6.4 / 6.7    9.9 / 10.3    11.9 / 12.8   14.4 / 14.9   17.6 / 18.2   20.0 / 20.6
 31 - 32      5.6 / 5.6     6.8 / 6.9    10.2 / 10.3   12.6 / 12.5   18.1 / 18.1   26.5 / 26.6   31.9 / 31.4
 38 - 39      12.8/12.6    15.9 / 15.9   24.3 / 24.2   30.2 / 30.0   38.1 / 37.8   47.9 / 47.8   55.0 / 54.1

The flood levels predicted by the post-development model have been compared to those for the pre-
development scenario in Table 16 to 18 on preceding pages of this report, for ARI’s from 1 to 100 years.
Yellow highlighting is used in those two tables to identify nodes that are within the site boundaries. The
flood level affluxes on all external properties as a result of the proposed development are generally seen
to be practically zero (maximum 0.01 metre), when quoted to the nearest centimetre.

The only exception to the abovementioned generality regarding affluxes is at node 23, just upstream of
the site boundary in the western tributary, where the affluxes will range from 0.02 metre in a 10 year
storm to 0.05 metre in a 100 year storm. The western channel between node 23 and the site boundary was
designed in 2006 to be deliberately revegetated to a Manning’s n of 0.15, as part of the adjoining Blue
Wren Place development. That revegetation was installed at the time of that development, but has since
been removed, thereby reducing the present (“pre-development”) Manning’s n in this area to about 0.04,
consequently decreasing the flood levels at node 23 to about 0.4 metre below the original design levels.
The post-development flood levels as a result of Valkev’s development, while being 0.02 to 0.05 metre
above the present levels, will nevertheless be at least 0.3 metre below the original design levels for this
area, and the quoted affluxes are therefore suggested to be of no consequence. This is illustrated by the
levels of the adjoining lot in Blue Wren Place, which are marked on the longitudinal floodway profiles in
Figure 10 of this report.

The corresponding 100 year post-development flood profiles are shown on Figure 10, and the post-
development 100 year boundary is mapped on Figure 13.

7.3     Sensitivity Test

The sensitivity of the development to uncontrolled regrowth along the floodways was examined by
applying a Manning’s n of value of 0.15 to all overbank sectors of all of cross-sections of the model. The
100 year flood levels predicted by this test are summarised in Table 21, on the following page of this
report, and in Figures 10 and 13. The design levels for the development platform should take due account
of these flood levels.




      Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                          Page 18

Page 66

 

Table 21: _ 100 Year Flood Levels (m) With Manning’s n 0.150 On All Overbank Areas

 

 

 

XPStorm Node Flood Level
3 101.78
4 101.67
5 101.16
6 101.15
% 101.11
8 101,00
9 100.98
10 100.98
i 100.91
12 100.81
13 100.55
14 100.43
15 100.16
23 101.53
24 101.27
25 101.00
26 100.83
oT 100.70
28 100.50
29 100.30
30 100.00

 

 

 

 

8.0 CERTIFICATION

I hereby certify that the findings described in this report have been deduced by industry-standard
analytical procedures and that the Sunshine Coast Regional Council can rely on those findings in their
considerations of the relevant development application.

 

Denis Ogle, RPEQ 2405, 30 April 2014

 

Rrithane Gtarmwater Manacemant PhT 4d Naenment File: ‘ValleavSk Nac Page 19

Page 67

NORTH




                                                                                                                                                                                                                                                      CORDWO
                                                                                                                                                                                                                                                            OD
                                                                                                                                                                                                                                                                                                      DRIVE




                                                                                                                                                                                                                                                                     M A SONRY
                                                                                                                                                                                                                                            16

                                                                                                                                                                                                                                                                                                  8



                                                                                                                                                                                                                                                      15
                                                                                                                                                                                                                                                                                                  9                           1
                           AD



                                                                                                                                                                                                                                                                                                                            RP173883
                         RO
                       NS




                                                                                                                                                                                                                                                                                                      10




                                                                                                                                                                                                                                                                           ST RE
                     SO




                                                                                                                                                                                                                                                           14
                    AR




                                                                                                                                                                                                                                                                                 ET
                    PE




                                                                                                                                                                                                                                                                                                                   11
                                                                                                                                                                                                                                                                                                                                  7




                                                                                                                                                                                                     32
                                                                     No 2, PEARSONS ROAD                                                                                                                                                                                                                           12
                                                                                                                                                                                                                                                                                                                              6


                            44                                                                                                                                                                      31
                                       43                                                                                                                                                                                                                                                                     13
                                                 42
                                                                                                                                                                                                                                                                                                                        5
                                                           41
                                                                     40                                                                                                              30
                            45                                                 39
                                                                                         38
                                                                                                   37
        E LM




                                                                                                             36                    33                                                                     28    27
                                                                                                                       35                                                                                                                                                                     100
                                                                                                                                                                                     29                                                                                                       PARK

                                                                                                                                  34
          STREE




                             46                                                                                                                                                                                               26
                T




                                  47        48        49
                                                                50                                                                                                              20
                                                                          51                                                                                   100                                                                               25
                                                                                    52                                                                                                                                   24
                                                                                              53                             56                                PARK
                                                                                                        54
                                                                                                                  55                                                                      21
                                                                                                                                                                           19
                                                                                                                                                                                                          22                                                     4
                                                                                                                            57                                                                                 23                                                                     BIO BASIN

                                                                                                                                                                                                                                                  3

                                                                                                                                                                      17                                                           2
                                                                                                                                                                                                                                                                             E
                                                                                                                                        BLUE R EN
                                                                                                                                                                                               18                    1
                                                                                                                                                                                                                                                                    D    RIV
                                                                                                                                                                                                                                                                ALD
                                                                                                                                                                                                                                                     ON
                                                                                                                                                                                                                                                  CD
                                                                                                                                             W




                                                                                                                                                                                                                                              A
                                                                                                                                                                                                                                          E M
                                                                                                                                                    PLA                                                                            LA K
                                                                                                                                                       C   E




                                                                                                                                                                                                                                                                                                                        0              SCALE        100 m


                                                                                                                                                                                                                                                                                                                                                   28 Apr 2014


                                                                                                                                                                                     VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                                                                                                                                                                                     LOCALITY AND LOT PLAN                                                                                                                                     FIGURE 1

Page 68

NORTH




                                                                                                                                                                                                                                                                        CORDWO
                                                                                                                                                                                                                                                                              OD
                                                                                                                                                                                                                                                                                                                    DRIVE




                                                                                                                                                                                                                                                                                       M A SONRY
        PARTIAL-AREA LIMITS, FOR CALCULATION OF
        PRE- AND POST-DEVELOPMENT FLOW RATES                                                                                                                                                                                                                  16

                                                                                                                                                                                                                                                                                                                8



                                                                                                                                                                                                                                                                        15
                                                                                                                                                                                                                                                                                                                9                           1
                                             AD



                                                                                                                                                                                                                                                                                                                                          RP173883
                                           RO
                                         NS




                                                                                                                                                                                                                                                                                                                    10




                                                                                                                                                                                                                                                                                             S T RE
                                       SO




                                                                                                                                                                                                                                                                             14
                                      AR




                                                                                                                                                                                                                                                                                                   ET
                                      PE




                                                                                                                                                                                                                                                                                                                                 11
                                                                                                                                                                                                                                                                                                                                                7




                                                                                                                                                                                                                       32
                                                                                       No 2, PEARSONS ROAD                                                                                                                                                                                                                       12
                                                                                                                                                                                                                                                                                                                                            6


                                              44                                                                                                                                                                      31
                                                         43                                                                                                                                                                                                                                                                 13
                                                                   42
                                                                                                                                                                                                                                                                                                                                      5
                                                                             41
                          E LM




                                                                                       40                                                                                                              30
                                              45                                                 39
                                                                                                           38
                                                                                                                     37                              33                                                                           27
                                                                                                                               36                                                                                           28
                                                                                                                                         35                                                                                                                                                                 100
                                                                                                                                                                                                       29                                                                                                   PARK
                            STREE




                                                                                                                                                    34
                                               46                                                                                                                                                                                               26
                                  T




                                                    47        48        49
                                                                                  50                                                                                                              20
                                                                                            51                                                                                   100                                                                               25
                                                                                                      52                                                                                                                                   24
                                                                                                                53                             56                                PARK
                                                                                                                          54
                                                                                                                                    55                                                                      21
                                                                                                                                                                                             19
                                                                                                                                                                                                                            22                                                     4
                                                                                                                                              57                                                                                 23                                                                 BIO BASIN

                                                                                                                                                                                                                                                                    3

                                                                                                                                                                                        17                                                           2
                                                                                                                                                                                                                                                                                               E
                                                                                                                                                          BLUE R EN
                                                                                                                                                                                                                 18                    1
                                                                                                                                                                                                                                                                                      D    RIV
                                                                                                                                                                                                                                                                                  ALD
                                                                                                                                                                                                                                                                       ON
                                                                                                                                                                                                                                                                    CD
                                                                                                                                                               W




                                                                                                                                                                                                                                                                A
                                                                                                                                                                                                                                                            E M
                                                                                                                                                                      PLA                                                                            LA K
                                                                                                                                                                         C   E




                                                                                                                                                                                                                                                                                                                                      0              SCALE        100 m


                                                                                                                                                                                                                                                                                                                                                                 28 Apr 2014


                                                                                                                                                                                                       VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                                                                                                                                                                                                       URBS MODELS OF STORMWATER DETENTION REQUIREMENT                                                                                                       FIGURE 2

Page 69

                                   AD
                                 RO
                                                                                                                                             NORTH




                               S
                            ON
                             S
                          AR
                      PE
                                 PARTIAL-AREA LIMIT, FOR CALCULATION OF
                                 PRE-DEVELOPMENT FLOW RATES
                                                                          No 2, PEARSONS ROAD
        ELM
            STREET




                                                              PRE-DEVELOPMENT SCENARIO
                               AD
                             RO
                             S
                        S ON
                     AR
                     PE




                           PARTIAL-AREA LIMIT, FOR CALCULATION OF
                           POST-DEVELOPMENT FLOW RATES
                                                                         No 2, PEARSONS ROAD

                                 44
                                              43                  FLOW
                                                        42   IN EXCESS S
                                                                       OF Q5
                                                                                    39
      ELM




                                 45                                                           38
                                                                                                        37                              33
                                                                                                                  36
                                                                                                                            35               BIO
       STREET




                                                                                                                                       34
                                 46
                                                                                                    FLOWS UP
                                                                                                             TO Q5
                                         47        48        49
                                                                    50
                                                                               51
                                                                                         52
                                                                                                   53                             56
                                                                                                             54
                                                                                                                       55


                                                                                                                                 57




                                                             POST-DEVELOPMENT SCENARIO
0       SCALE                            100 m
                                                                                                                                                     28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PROPOSED CHANGE IN DISCHARGE SCENARIOS TO No 2 PEARSONS ROAD                                                                                 FIGURE 3

Page 70

                                                                                                                                                                                       NORTH




                                                                                                                                                            T
                                                                                                                                                         E C
                                                                                                                                                    GE
                                                                                                                                                  W IL




                                                                                                                                                                       E
                                                                                                                                                                  IV
                                                                                                                                                                DR


                                                                                                                                         A   LD
                                                                                                                                       ON
                                                                                                                                     CD
                                                                                                                                  MA
                                                                                                                     KE
                                                                                                             LA


                                        ST RE ET
                               G EM
                                                                                                   COOROY
                       EL M




                                                                                                CEMETERY
                         S TREE
                              T




                                                                                      E
                                                                                 DRIV
                                                                             A LD
                                                                            ON
                                                                            CD
                                                                       E M
                                                                     LA K




                         COOROY
                                                                                                           ET
                                                                                                         S TRE
                                                                                                  KAURI




                                                                                                                                      ST
                                                                                                                                 NE
                                                                                                                        I   VI
                                                                                                                     OL
                                                                 SAPPHIRE STREET
                                                   STREET




                                                            PEARL STREET

                                                                                                                     RD
                                                                                                                 N
                                                                                                           TI
                                                                                                    AN
                       MA P




                                                      ELM




                                                                                          T   EW
                        LE
                              STRE ET




                                                                 DIAMOND ST

                                                                                                                                                                           0   SCALE           500 m
                                                                                              KAURI ST




      EM ERA LD
                  ST




                                                                                                                                                                                                  28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
CATCHMENT SUBDIVISION FOR PRE-DEVELOPMENT URBS MODEL         FIGURE 4

Page 71

                                                                                                                                                                                    NORTH




                                                                                                                                                                                                                                                                                  T
                                                                                                                                                                                                                                                                                 E C
                                                                                                                                                                                                                                                                               GE
                                                                                                                                                                                                                                                                            WIL
                                                                                                                                                                                                                                                                                                 E
                                                                                                                                                                                                                                                                                            IV
                                                                                                                                                                                                                                                                                       DR


                                                                                                                                                                                                                                                                       LD
                                                                                                                                                         T
                                                                                                                                                      E C




                                                                                                                                                                                                                                                                    NA
                                                                                                                                                 GE




                                                                                                                                                                                                                                                                  O
                                                                                                                                               W IL




                                                                                                                                                                    E
                                                                                                                                                                                                                                                                CD
                                                                                                                                                                                                                                                              MA
                                                                                                                                                               IV
                                                                                                                                                             DR



                                                                                                                                                                                                                                                         KE
                                                                                                                                           D
                                                                                                                                      AL
                                                                                                                                    ON

                                                                                                              KE
                                                                                                                             MA
                                                                                                                                  CD
                                                                                                                                                                                                                                                       LA
                                                                                                      LA

                                       T
                               ST RE E
                        G EM
                                                                                                                                                                                                                    ET
                                                                                            COOROY
                                                                                                                                                                                                            E M STRE
                                                                                                                                                                                                           G
                 EL M




                                                                                         CEMETERY
                   S TREE




                                                                                                                                                                                                                                                   COOROY
                        T




                                                                                E
                                                                            RIV




                                                                                                                                                                                                    EL M
                                                                         D D




                                                                                                                                                                                                                                                   CEMETERY
                                                                     AL
                                                                    ON
                                                                    CD
                                                               E M




                                                                                                                                                                                                     ST R E
                                                             LA K




                   COOROY




                                                                                                                                                                                                       ET
                                                                                                    ET
                                                                                                  S TRE
                                                                                           KAURI




                                                                                                                                 ST
                                                                                                                             E
                                                                                                                        IN
                                                                                                              OL
                                                                                                                   IV
                                                                                                                                                                                                                         DETAIL PLAN - SITE AREA   0          SCALE            200 m
                                                         SAPPHIRE STREET
                                           STREET




                                                    PEARL STREET

                                                                                                              RD
                                                                                                          N
                                                                                                    TI
                                                                                             AN
                 MA P




                                              ELM




                                                                                        W
                                                                                     TE
                  LE
                     STRE ET




                                                         DIAMOND ST
                                                                                                                                                                        0   SCALE           500 m
                                                                                       KAURI ST




EM ERA LD
            ST




                                                                                    OVERALL PLAN
                                                                                                                                                                                                                                                                                                     28 Apr 2014


                                                                                                                                                                                                                   VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                                                                                                                                                                                                                    CATCHMENT SUBDIVISION FOR POST-DEVELOPMENT URBS MODEL                   FIGURE 5

Page 72

 

 

SCALE

BSM—

200m

28 Apr 2014

 

 

 

| VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY

 

 

| XPSTORM HYDRAULIC MODEL NETWORK

| [FIGURE 6 |

 

 

 

Page 73

     LOOKING DOWNSTREAM FROM NODE 10, THROUGH NODE 11 TO NODE 12




      LOOKING DOWNSTREAM FROM NODE 12, THROUGH NODE 13 TO NODE 14

                                                                    28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PHOTOGRAPHS OF EASTERN FLOODWAY ON 25 NOVEMBER 2013          FIGURE 7

Page 74

           LOOKING DOWNSTREAM FROM NODE 25, TO NODE 26




             LOOKING UPSTREAM FROM NODE 27, TO NODE 26
                                                                 28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PHOTOGRAPHS OF WESTERN FLOODWAY ON 25 NOVEMBER 2013          FIGURE 8

Page 75

                                                               NORTH




                                             0       SCALE     100 m




                                                                   28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PROPOSED FLOODWAY MODIFICATIONS                              FIGURE 9

Page 76

WESTERN TRIBUTARY




   EASTERN TRIBUTARY



                                                                                28 Apr 2014


                       VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
                       LONGITUDINAL FLOODWAY PROFILES                      FIGURE 10

Page 77

                               DETAIL OF CHANNEL RESHAPING




                           TYPICAL CROSS-SECTION DETAILS




                                                             28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
FLOODWAY CROSS - SECTION CHANGES, WEST TRIBUTARY      FIGURE 11

Page 78

                                                            DECK LEVEL 100.55 (10 YR FLOOD LEVEL)
                   0.25 M                0.4 M


  APPROACH FILL                                                                       APPROACH FILL



                        0.2 M DIA PILE           IL 98.63
                                                                         0.45 M DIA PILE




                  PROPOSED FOOTBRIDGE, LOOKING DOWNSTREAM
               (ONE 8.8 M CLEAR BRIDGE SPAN, PLUS THREE 2.2 M CLEAR BOARDWALK SPANS)




                                                                                                   Q5 STORAGE LEVEL
                                                                                                     Q1 STORAGE LEVEL
                   0.3 M BIO-STORAGE             0.7 M           0.4 M           0.1 M
                                                                                                                         WEIR


                                                                                                 N-3
                                                                                           1-O
                                                                                           SAND SURFACE AREA 200 M2



                                                                           1 M x 1M (INT) RISER BOX
                                                                           0.7 M WIDE x 0.4 M DEEP NOTCH IN ONE SIDE
           OUTLET PIPE, DIA AS REQ'D                                       SAFETY / TRASH RACK AS REQ'D
           TO CONVEY Q5 = 0.63 M3/SEC




                      BIO-BASIN SCHEMATIC, WESTERN TRIBUTARY


                                                                                     Q5 STORAGE LEVEL
             0.2 M BIO-STORAGE
                                                         0.2 M       0.07 M           Q1 STORAGE LEVEL

                                                                                                                        WEIR
                                                                                              -5
                                                                                     1 - ON
                                                                                  SAND SURFACE AREA 150 M2



                                                                   1 M x 1M (INT) RISER BOX
                                                                   1.0 M WIDE x 0.2 M DEEP NOTCH IN ONE SIDE
      OUTLET PIPE, DIA AS REQ'D                                    SAFETY / TRASH RACK AS REQ'D
      TO CONVEY Q5 = 0.35 M3/SEC




                            BIO-BASIN SCHEMATIC, EASTERN TRIBUTARY


                                                                                                                           28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
FOOTBRIDGE AND BIO - BASIN SCHEMATICS                        FIGURE 12

Page 79

                                                   NORTH




                                0        SCALE      50 m




                                                           28 Apr 2014


VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
FLOOD LEVELS AND FLOOD BOUNDARIES                     FIGURE 13

Page 80

                             Appendices



          A.   Design Rainfall Data

          B.   Rational Method Calculations Of Floodway Inflows, Pre-Development

          C.   Rational Method Calculations Of Floodway Inflows, Post Development

          D.   Floodplain Storage Volumes




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 20

Page 81

                                      Appendix A



                                 Design Rainfall Data




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc   Page 21

Page 82

=
i 4 Ret Recents
“se Bureau of Meteorology

Location

 

Label: Cooroy

Latitude: 26° 24' 26"
S)]

Longitude: 152° 54' 51"
(Nearest grid cell: 152.9125 (E)]

mm)

Rainfall depth for Durations, Exceedance per Year (EY), and Annual Exceedance Probabilities (AEP).

EY
Duration | aey | 50% | 20% | 10% | 5% | 2% | 1% |
1 min 2.7 3.1 4.2 a9| . 5.6 6.4 7.1|
22min 43, 5.4) 74, os} ioa; 119) 13.3
3 min 68) 76, 1oal 122; a4al 165] 48.4
4 min a 8.5. 96] 430| 193| i75| 20.5) 229
5 min | a03) dal «sel aso) Soe sanl a0
10min 16.1, 182] 245| 285| 324] 37.3/ 40.9
15 min | 204) 23.0 309| 36.0| 40.9| 47.0) 51.6
30 min : 28.9, 326] 439| 5ial see; 67.8| 74.7
ahour 393|  444|  603/ [email protected]| 95.7| 106.4]
2 hour | | 523; seal 62a| 97.8] 113.4] 134.5] 151.0]
3 hour | 61.61 70.4) 98.4, 118.0| 137.6] 164.3| 185.3
6 hour | sil 93.9, 134.3/ 162.8) 191.6) 231.0] 262.3
12 hour | 106.3/ 124.0| 1981.5| 222.5] 2641] 321.7, 367.6
| 24 hour | 134.9] 158.8] 237.6 294.8 353.6] 436.1| 502.8
Aa8hour 164.5. 194.4. 295.7, 371.2, 450.7, 564.9 659.8
72 hour | 481.6 2145] 327.8, 413.8) 505.7; 640.01 753.4
96 hour _ 194.2 229.1. 350.0 442.8 542.9 690.6 816.5
120 hour ‘| 204.9] 241.2) 367.61 465.2| 570.8) 727.5) 861.7
144 hour [214.8] 252.3) 383.1] 484.2) 593.7/ 756.2| 895.5|
168 hour | 2245] 263.2) 397.6, 501.3; 623.4] 779.5| 921.5

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 22

Page 83

                                      Appendix B



          Rational Method Calculations Of Floodway Inflows, Pre-Development




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc           Page 23

Page 84

Concentration Times


Subareas 1 - 5

Average Stream Velocity: 5-6% catchment slope = hilly; T = 1206 / 0.9 x 60 = 22 mins

Components Of Flow: 40 m sheet flow @ 10%        = 9 mins
                    530 m steep [email protected] m/sec = 7 mins
                    730 m [email protected] – 1.1 m/sec = 12 mins
                     Total:                          28 mins

Bransby-Williams: T = 58 L / A0.1 Se0.2 = 58 x 1.206 / 66.8 0.1 x 1.04 0.2 = 46 mins

From 22, 28, 46 mins (average 32) : Adopt Tc = 30 mins




Subarea 7

55 m sheet flow @ 4-5% = 12 mins
230 m swale/channel @ 5% = 4 mins
Total:                     16 mins



Subarea 8

130 m sheet flow, partly lawn @ 7% = 16 mins




Subarea 9

85 m sheet flow @ 8% = 13 mins


   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                 Page 24

Page 85

Subareas 12 — 16

Std inlet time for 10% grade = 9 mins
150 m pipe/kerb along Tewantin Rd@ 6% = 1.2 min
60 m pipe/kerb along Kauri St@ 4% grade = 0.6 mins
115 m pipe/kerb along Pearl St @ 4% grade = 1.2 mins
115 m pipe flow to sapphire [email protected]% grade = 1.8 mins
260 m open easement [email protected]% grade = 6.0 mins

370 m natural floodway @ hydraulic model 0.8 m/sec = 7.7 mins
Total: = 27 mins

Subarea 17

130 m sheet flow @ 4% = 19 mins

Subarea 18

90 m sheet flow @ 4%, partly lawn = 16 mins

Subarea 19

85 m sheet [email protected]%, average grass = 19 mins
85 m natural [email protected] m fall = 5 mins
Total: 24 mins

Q=0.00278 x FxCxIx A

(F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)

 

 

 

 

 

 

 

 

 

Subs Fi | C10 Tc I (mm/hr) A Q (m3/s)
(min) | 1/2 / 5 / 10 / 20 / 50 / 100 | (Ha)} 1/2 /5 / 10 / 20 / 50 / 100
1-5 | 0.21 | 0.74 | 28 60/67 / 90 / 107 / 123 / 140 / 155 | 66.8 | 6.0/7.6/11.5/14.2/16.9 /21.5 /24.6
7 0.20 | 0.74 | 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.2 | 0.29/0.35/0.52/0.63 /0.75/ 0.95/ 1.10
8 0.06 | 0.71 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.0 | 0.25/0.30/0.45 / 0.55 / 0.65 / 0.83/ 0.96
9 0.10 | 0.72 | 13 89 /100/133/ 155 / 175 / 201 / 221 | 1.64 | 0.23/0.27/ 0.40 / 0.49 / 0.59 / 0.74 / 0.85
12-16 | 0.50 | 0.80 | 24 61/73/ 98 / 116 / 130 / 153 / 165 | 44.4 | 4.8/5.8 /8.6 /10.8 /12.8 /16.3/ 18.7
17 0.00 | 0.70 | 19 73: 182/109 / 129 / 148 / 167 / 186 | 1.9 | 0.22/0.26/ 0.38 / 0.48 / 0.57 / 0.71 / 0.83
18 0.04 | 0.71 16 80/90/120/ 140 / 158 / 183 / 202 | 1.7 | 0.21/0.26/0.38/0.47/0.56/0.71/0.81
19 0.09 | 0.72 | 24 65/ 73/ 98/ 116/ 130/ 152 / 166 | 1.99 | 0.21/0.25 / 0.37 / 0.46 / 0.54 / 0.70 /0.79

 

 

 

 

 

 

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc

Page 25

 

Page 86

                                      Appendix C



          Rational Method Calculations Of Floodway Inflows, Post-Development




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc            Page 26

Page 87

Concentration Times


Subarea 7

As per “Pre-Development”, Tc = 16 mins



Subarea 8

QUDM std inlet time, 6 – 7% slope = 10 mins



Subarea 9

Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins.



Subareas 10 - 18

50 m sheet flow across lawn @ 8% = 13 mins
50 m swale/pipe @ 1%             = 1 min
Total:                            = 14 mins



Subarea 19

30 m sheet flow across lawn @ 3% = 10 mins
45 m pipe / swale @ 2%           = 1 min
Total:                            = 11 mins



Subarea 20

Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins



Subarea 29 - 35

70 m sheet flow across lawn @3% = 17 mins
65 m pipe/kerb @ 2 m fall       = 1 min
160 m pipe @ 6 m fall           = 2 mins
Total:                           = 20 mins



   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc     Page 27

Page 88

Subarea 36

QUDM std inlet time for 8% grade = 10 mins
70 m wq-swale & pipes @ 1% = 2 mins
Total : = 12 mins

Subarea 37

As per “Pre-Development” : 16 mins

 

Subarea 38
QUDM std inlet time for 1.5% grade = 15 mins
5-10 m pipe = 0 mins
Total: = 15 mins
Q=0.00278 x FxCxIx A (F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)
Subs Fi C10 Tc I (mm/hr) A Q (m3/s)

(min) 1/2/ 5 / 10 / 20 /50 /100 | (Ha) 1/ 2/5/10 / 20/50 / 100

 

0.30 | 0.76 16 80/90/ 120/140 / 158/ 183/202 | 2.25 | 0.30/ 0.36/ 0.54 / 0.67 / 0.79 / 1.00/ 1.15

 

oo;

0.60 | 0.82 10 97/109 / 147/171 / 194/ 224/245 | 0.29 | 0.05/0.06/ 0.09 / 0.11 /0.13 /0.17/0.19

 

9 0.00 | 0.70 5 121/137 /185 / 216 / 247 / 288 / 318 | 0.72 | 0.14/0.16/ 0.25 /0.30/ 0.36 / 0.46 / 0.53

 

10-18 | 0.50 | 0.80 14 84/96 / 128 / - / - / -/ - | 1.35 | 0.20/0.24/0.37/ ----/ ---- / ---- / ----

 

19 0.60 | 0.82 11 94/106 /143 / 166 / 189 / 218/238 | 0.37 | 0.06/0.08 / 0.11 /0.14/0.17/0.21 /0.24

 

20 0.00 | 0.70 5 121/137 / 185 / 216 / 247 / 288/318 | 0.99 | 0.20/0.22 / 0.34 / 0.42 / 0.50 / 0.64 /0.74

 

29-35 | 0.46 | 0.79 20 71/80/106/ --- / --- / --- /--- | 3.09 | 0.39/0.46/0.68/ --- / --- / --- /---

 

36 0.45 0.79 12 92 /103 /138/ 160 / 183/211 /231 | 1.32 | 0.21/0.25/0.38/ 0.48 / 0.56 / 0.70 /0.80

 

37 0.08 | 0.72 16 80/90 / 120/140 / 158/ 183/202 | 0.84 | 0.11/0.13 / 0.19 / 0.24 / 0.28 / 0.35 /0.41

 

38 0.60 | 0.82 15 82/92 / 124/ 144/ 164/ 188/206 | 0.40 | 0.06/0.07 / 0.11 / 0.13 / 0.16 / 0.20 / 0.23

 

 

 

 

 

 

 

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 28

Page 89

                                      Appendix D



                              Floodplain Storage Volumes




Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc   Page 29

Page 90

PRE-DEVELOPMENT FLOODPLAIN STORAGE VOLUMES (CUBIC METRES)

USNODE DSNODE 1YEAR 2YEAR SYEAR 10YEAR 20 YEAR 50 YEAR 100 YEAR

3 4 273 =286 356 398 438 490 549
4 5 127 136 178 204 225 250 273
5 6 583-612 724 815 900 957 988
6 7 648 669 776 910 1031 1075 1090
7 8 139 178 341 465 535 560 702
8 9 197 227 318 392 499 563 635
9 10 175 200 281 340 422 497 564
10 11 300 345 491 592 712 842 947
11 12 247 9282 403 480 561 668 750
12 13 314 362 523 590 663 827 960
13 14 470 558 867 988 1071 1262 1462
14 15 310 386 615 718 792 900 1000
23 24 224 256 329 369 425 497 547
24 25 114 136 193 225 262 307 340
25 26 312 352 440 485 535 598 641
26 27 158 192 278 321 379 447 493
27 28 185 221 317 368 428 505 554
28 29 260 311 454 526 611 715 786
29 30 420 475 631 741 863 1026 1212
TOTAL 5456 6184 8515 9927 11352 12986 14493

POST-DEVELOPMENT FLOODPLAIN STORAGE VOLUMES (CUBIC METRES)

USNODE DSNODE 1YEAR 2YEAR SYEAR 10YEAR 20 YEAR 50 YEAR 100 YEAR

3 4 208 217 253 293 326 375 420
4 5 85 8691 114 148 168 195 229
5 6 646 667 785 896 929 951 1030
6 7 650 673 812 955 990 1000 1108
7 8 144 187 413 511 760 966 1065
8 9 225 263 436 568 681 756 818
9 10 197 229 364 492 588 650 699
10 11 339 396 624 830 993 1095 1179
11 12 280 322 473 573 683 764 823
12 13 347 = 397 567 649 819 952 1047
13 14 523 607 941 1074 1268 1520 1697
14 15 323 400 630 736 822 953 1053
23 24 224 261 346 392 446 511 560
24 25 161 191 264 303 352 413 456
25 26 285 331 444 510 590 687 751
26 27 235 280 382 437 502 583 638
27 28 223 275 395 459 534 626 680
28 29 305 373 538 626 735 862 924
29 30 381 9 431 568 669 790 948 1063
TOTAL 5781 6591 9349 11121 12976 14807 16240

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 30

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.