Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

 

LEGEND STAGED WORKS

 

STAGE 1 WORKS AREA - OPW13/0417

STAGE 2 WORKS AREA — OPW13/0616
STAGE 3 WORKS AREA
STAGE 4 & 5 WORKS AREA

 

 

 

 

  

ROAD IS TOO FLAT FOR KERB,
2m OFF EDGE OF SHOULDER.

 

INSTALL TYPE 22 CONCRETE INVERT
TURF EITHER SIDE OF INVERT.

 

 

  
 
 
  
  
  
   
   

 

  

RP20685

+TUBE STOCK

MULCH & REVEGETATION

0.1m DEEP COARSE SAND

TRANSITION LAYER (0.5mm-2mm) ——_—L |

0.15m MINIMUM DEEP S-2mm WASHED SCREENINGS &
SLOTTED RIGID SEEPAGE PIPES & 0.5% MIN GRADE.

 
  

LEGEND:

 

SW

 

 

+

 

 

+ ee

 

  

 

 

EXISTING FLOWS TO ADJACENT LOT ARE ATTENUATED TO
PRE-DEVELOPMENT LEVELS BY REMOVING Q5 FLOW TO
BIO-RETENTION BASIN FOR TREATMENT. OVERLAND FLOW

CONTAINED BETWEEN LOTS 39 &40.

 

 

 

NTS

rE

36

 

 

SAG PITS TO TAKE Q5, OVERFLOW TO
FLOW PATH BETWEEN LOTS 39/40

 

 

sw
sy

 

INTERLOT STORMWATER PITS |]
TO CATER FOR ADJACENT
LOTS 3 & 4 RP206856

 

 

 

=

a

 

 

 

 

|

=

A

SW,

5
RP206856

 

RPI0635EG | BUS STOP_HARDSTAND TO TRANSLINK ’REGULAR STOP”
REQUIREMENTS. 4mx4m CONCRETE HARDSTAND
150mm ABOVE GROUND LEVEL. WIDEN SHOULDER TO
3m WITH TAPERS IN ACCORDANCE WITH TRANSLINK
REQUIREMENTS.

|
—~| 0.80 1.20 ++ 1.00 +++ 1.20 --| FLUSH KERB
TS2000 SAND ROAD EDGE

 
   

TOPSOIL & TURF
@8/sqm

 

LOW POINT OF LOT 5 RP206856,
LOCATION OF FUTURE STORMWATER
DRAINAGE THROUGH LOT 12 RP134343

 

 

  
  

 

 

 

 

LINED BIO SWALE

SCALE NTS.

12
RP1 54343

35

Ss
634 3

—_ Lo
&

Tee

<—

ROAD 3 >
STAGE 4

 

 

 

 

 

 

 

fe %
Cos
6
SP218739

Sp

=
GR

ae

 

— Faioo

NNN

   
 
  
 
 
  
 
 
     

         
 

PROPOSED STORMWATER PIPE

PROPOSED INTERLOT DRAINAGE PIPE WITH
RAINGARDEN

PROPOSED INTERLOT DRAINAGE PIPE
WITH PITS

PROPOSED BIORETENTION BASIN

( Callaghan & Toth )

Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road

Phone 54749081, Fax 54749041

www.callaghanandtoth.com.au

i!

=|

 

TO TYPICAL DETAIL FIGURE 4.2

designed | ADT datum AHD DERIVED

 

drawn BM cM

 

PROPOSED BIORETENTION SWALE TO

 

PS
checked | AH Origin (B.M.) RL *

 

TYPICAL SECTION SHOWN BELOW

PROPOSED GULLY PIT WITH

 

approved

 

BIORETENTION
EXISTING/PROPOSED FLOW DIRECTION

PROPOSED LAY BACK TYPE KERB M1/M4 TO
IPWEAQ STD DWG R-0080

PROPOSED FLUSH KERB ER2 TO IPWEAQ STD
DWG R-0080

FINAL Q100 FLOOD LINE
EXISTING TOP OF BANK

EXISTING TREE

EXISTING TREE LINE

 

PREVIOUS ROAD
RESERVE. BDY

   

 

 

   
 
 
  

 

SURVEYED _BY
MAX WATTERSION & ASSOCIATES

PHONE 54 426 121
a

(SS

project

PROPOSED 57 LOT SUBDMSION
55 LAKE MacDONALD DRIVE
COOROY

_O————————L—L————,
Client

VALKEV PTY LTD

$d

_O——————————L————,
title

STAGE 4 STORMWATER MASTER

PN

_—_—————————————————————.

LOT 136 on MCH978

Parish of TEWANTIN

County of MARCH

SUNSHINE COAST COUNCIL
Locality of LAKE MacDONALD

Ce )

_—————————————————
SCALE

 

 

 

 

 

 

 

 

0 5 10 15 20 25 een 50
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) D0_NOT SCALE FROM THIS DRAWING

USE ONLY DIMENSIONS PROVIDED

REVISIONS
detai

FILES

 

 

COMPUTER DIRECTORY

 

X:\JOBS\CT Projects in progress\1225 30 lots
lake MacDonald Drive\\Design\Current_DWG—BASE

 

FIGURE 3.1

 

Sheet 2 of 10 sheets

 

drawing number

PAGE 10

 

 

 

 

date 10-3-14

 

 

 

 
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.