Original source · versioned page text
Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn"Roadways | Lot 20 to25 - Yard Lot 20 to25 - Roof Area 17,19 - Roof Area Lot 1 to 4- Yard, Roadways from Blue Wren Place Lot 17,19-Yard | Lot 26-28 - Yard Lot 26-28 - Roof Areal = 5 | _Raingardens x3_ — | of ft | Lot $ to16 - Ys te ahve BioBasin 3- Park Callaghan & Toth Civil, Environmental & Hydraulic Engineers 8/41 Sunshine Beach Road PO BOX 2305 NOOSA HEADS 4567 Ph: 54749081 Fax: 54749041 www.callaghanandtoth.com.au 1 to 4-Roof, 28m2 Roadside BioBasin 1 Bioretention Swale 1 10m2 Roadside | | Lot 33-57 - Roof Area Lot 29 to 32- Roof Area Pal Bioretention Swale 2) ‘Lot 33-57 - Yard (Completed) from Blue Wren North section of trom Blue Wren Place Lot 18 - Yard. Lot 18- Roof Area Joining Road from Blue Wren Place | Junction - Ck off Blue Wren Place’ | Junction - east west gully | Junction west side stg5 gully RaceWing Node -T of Six Mile Ck project 57 LOTS RESIDENTIAL RECONFIGURATION MUSIC MODEL location 55 LAKE MACDONALD DRIVE / PEARSONS ROAD COOROY Figure 4.1 Date: APRIL 2014 Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.