Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.2 RAINGARDEN MAINTENANCE PROCEDURES
Objective        To maintain the raingarden systems to ensure that it continues to remove pollutants from stormwater runoff, as
                 intended during the design phase.
Actions          Description                                                               Responsibility Timeframe
General                Remove accumulated litter / debris to pond and grates              Developer      Every three months for first
Maintenance                                                                                               year of operation – during
                       Remove accumulated sediments at inlet                                             On-maintenance period
                       Remove impermeable layer if water ponds for more than a
                        few hours
                       Remove weeds and dead plants
                       Replace plants where necessary
                       Water plants as necessary
                       Reinstate areas that have eroded and holes in media
                       Ensure energy dissipation at entry and exit points is adequate
                        and repair if necessary
                       Control erosion and sediment loss upstream or within system
                        where necessary
                       Check builders working upstream block inlet to biopod with
                        filter bags and ring edge with sediment fence. If not compliant,
                        ring building compliance officer.
Following Off-         Remove accumulated litter / debris to pond and grates              Householder    Every six months (or as
maintenance                                                                                               necessary) following first
                       Remove accumulated sediments at inlet                                             year.
                       Remove impermeable layer (such as oily or clayey sediment)
                        if water ponds for more than a few hours
                       Remove weeds and dead plants
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.