Original source · versioned page text
Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3. Pits, pipes and inflow areas Section 1 Section 2 Maintenance Required? Maintenance Performed? Yes No Yes No Perforated pipes (C/RCLE — full blockage/partial blockage/damage) oO oO oO oO Inflow areas (CIRCLE — scour/excessive sediment deposition/litter blockage) oO oO oO oO Overflow grates (CIRCLE — damage/scour/blockage) oO oO oO oO Pits (CIRCLE — poor general integrity/sediment build-up/litter/blockage) oO oO oO oO Other stormwater pipes and junction pits (C/RCLE — poor general integrity/sediment build-up/litter/blockage) oO oO oO oO 4, Submerged zone Section 1 Section 2 Maintenance Required? Maintenance Performed? Yes No Yes No Weir/up-turned pipe (C/RCLE — full blockage/partial blockage/damage) oO oO oO oO Water level (C/RCLE — at design level/drawn down) SOME DRAWDOWN DURING DRY PERIODS IS EXPECTED Oo oO Oo Oo 5. Additional Comments
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.