Original source · versioned page text
Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 14: Discharge Points From Urbs Hydrologic Model To XPStorm Hydraulic Model Pre-Development Scenario Post-Development Scenario Urbs Subareas (Location, Figure 4) XPStorm Node (Location, Figure 6) Urbs Subareas (Location, Figure 5) XPStorm Node (Location, Figure 6) 1-5 1 1-5 1 6 3 6 3 7 4 7 4 8 8 8 7 9 13 9 8 10 16 10 - 18 10 11 20 19 11 12-16 23 20 13 17 25 21 16 18 28 22 20 19 - 20 31 24 - 28 23 21 32 29 - 36 27 22 35 37 28 23 38 3823 29 44 31 45 32 46 35 47 38 Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.