Original source · versioned page text
Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 21: _ 100 Year Flood Levels (m) With Manning’s n 0.150 On All Overbank Areas XPStorm Node Flood Level 3 101.78 4 101.67 5 101.16 6 101.15 % 101.11 8 101,00 9 100.98 10 100.98 i 100.91 12 100.81 13 100.55 14 100.43 15 100.16 23 101.53 24 101.27 25 101.00 26 100.83 oT 100.70 28 100.50 29 100.30 30 100.00 8.0 CERTIFICATION I hereby certify that the findings described in this report have been deduced by industry-standard analytical procedures and that the Sunshine Coast Regional Council can rely on those findings in their considerations of the relevant development application. Denis Ogle, RPEQ 2405, 30 April 2014 Rrithane Gtarmwater Manacemant PhT 4d Naenment File: ‘ValleavSk Nac Page 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.