Stormwater Treatment & Water Quality Management Plan_April2014
Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn AD
RO
NORTH
S
ON
S
AR
PE
PARTIAL-AREA LIMIT, FOR CALCULATION OF
PRE-DEVELOPMENT FLOW RATES
No 2, PEARSONS ROAD
ELM
STREET
PRE-DEVELOPMENT SCENARIO
AD
RO
S
S ON
AR
PE
PARTIAL-AREA LIMIT, FOR CALCULATION OF
POST-DEVELOPMENT FLOW RATES
No 2, PEARSONS ROAD
44
43 FLOW
42 IN EXCESS S
OF Q5
39
ELM
45 38
37 33
36
35 BIO
STREET
34
46
FLOWS UP
TO Q5
47 48 49
50
51
52
53 56
54
55
57
POST-DEVELOPMENT SCENARIO
0 SCALE 100 m
28 Apr 2014
VALKEV PTY LTD - ELM STREET AND LAKE MACDONALD DRIVE, COOROY
PROPOSED CHANGE IN DISCHARGE SCENARIOS TO No 2 PEARSONS ROAD FIGURE 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.