Stormwater Treatment & Water Quality Management Plan_April2014

Attached to the e-mail REC13/0146 - Response to Information Request - Email 2.

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                  Callaghan & Toth


3.       SITE DESCRIPTION
The site consists of four (4) rural lots which are mostly cleared land for rural pursuits. The site
is bounded by Lake MacDonald Drive to the south-east, residential development to the south-
west and north.

Two watercourses run through the site as shown on Drawing Number 1225-50 Revision A.
The watercourses join just downstream of this development and eventually flow to Six Mile
Creek, a tributary of the Mary River. This site is subject to the ponding of floodwaters. The Q100
year ARI flood levels indicate that the extent of flooding does not impact on the proposed lots,
as shown in BSM Flood Report in Appendix 4.

The Cooroy and Lake MacDonald Biodiversity Overlay (Map OM3.1) from the Noosa Plan also
shows that these watercourses are subject to Riparian Buffer Areas along most of their lengths.

These two watercourses are tributaries of Six Mile Creek and shall hereafter be described as
the eastern and western tributaries (see Drawing Number 1225-50).


3.1      Proposed Works

The overall proposal is to reconfigure these four lots into a total of 57 lots. The overall
reconfiguration will include:

        Construction of new roads;
        Construction of pathways;
        Allotment shaping;
        Dedication of parkland – active and passive, including riparian buffer areas; and
        Construction and provision of services.

As a result of these works stormwater drainage and treatment devices are required to drain the
site, attenuate flows and treat stormwater runoff to acceptable levels.

Figure 3.1 shows the stormwater layout for Stage 1 and 2 (already completed), Stage 3 and
Stage 5 while Figure 3.2 shows the stormwater layout for Stage 4.




55 Lake MacDonald Drive – Stage 1 to 5                                                        pg. 8
Log in to download the original file

Stormwater Treatment & Water Quality Management Plan_April2014.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.