Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2107-23530 SARA to change response - 61 Noosa Springs Dr, Noosa Heads - MCU21/0110

of 27
                                                                                              2107-23530 SRA



Attachment 1—Changed conditions to be imposed


 No.     Conditions                                                                    Condition timing
 Material change of use
 Schedule 10, Part 10, Division 3, Subdivision 3, Table 1, Item 1—Koala habitat area in SEQ region—
 The chief executive administering the Planning Act 2016 nominates the Director-General of the
 Department of Environment and Science to be the enforcement authority for the development to which
 this development approval relates for the administration and enforcement of any matter relating to the
 following conditions:
 1.      The development must be carried out generally in accordance with the          At all times
         following documents:
          Proposed Site Plan with Koala Habitat Overlay, prepared by Marchese
            Partners International Pty Ltd, dated 12/11/2020 8/03/2023, Dwg. No.
            SK.01, Revision 1 2.


 2.      Clearing is limited to the removal of 19 non-juvenile koala habitat trees     At all times
         identified with a red ‘X’ on Proposed Site Plan with Koala Habitat
         Overlay, prepared by Marchese Partners International Pty Ltd, dated
         12/11/2020, Dwg. No. SK.01, Revision 1.
         Retention of native vegetation within the Koala Habitat Area,
         identified within following documents, is to be maintained:
              Proposed Site Plan with Koala Habitat Overlay, prepared by
                  Marchese Partners International Pty Ltd, dated 8/03/2023,
                  Dwg. No. SK.01, Revision 2
              Noosa Springs – Koala Habitat Area Tree Schedule,
                  prepared by Gondwana Ecology Group, dated 9/03/2023
 3.      Prior to any building or operational works being undertaken, prepare a        (a) to (e) Prior to
         Koala Management Plan, which must:                                            any clearing,
             (a) Identify the clearing and construction activities that may increase   building or
                  the risk of stress, injury or death of koalas; and                   operational works
                                                                                       being undertaken
         (b) Detail the management measures that will be implemented during
             clearing works to prevent the risks identified in part (a) of this
             condition, including but not limited to all of the following:
             i.       Details of pre-clearing inspections of the vegetation to be
                      cleared;
             ii.      Measures required under the Nature Conservation (Koala)
                      Conservation Plan 2017, including the staging and
                      sequencing of clearing and provisions for a koala spotter
                      during clearing operations;
             iii.     Procedures for the recovery of koalas;
             iv.      Measures for dealing with trapped, injured, orphaned and
                      deceased koalas;
             v.       Contact details for the contractor for reports of at risk or
                      injured koalas;
             vi.      Procedures for checking machinery for koalas; and
             vii.     Measures to protect retained koala habitat and vegetation
                      (including open land) in accordance with Australian Standard
                      AS4970-2009;

         (c) Detail the management measures that will be implemented during
             construction works to prevent the risks identified in part (a) of this
             condition, including but not limited to all of the following:
             i.        Procedures for dealing with trapped, injured, orphaned and


 State Assessment and Referral Agency                                                             Page 4 of 9


[OCR of page images]
2107-23530 SRA

Attachment 1—Changed conditions to be imposed

 

 

No. | Conditions Condition timing

 

 

 

Material change of use

 

Schedule 10, Part 10, Division 3, Subdivision 3, Table 1, Item 1—Koala habitat area in SEQ region—
The chief executive administering the Planning Act 2016 nominates the Director-General of the
Department of Environment and Science to be the enforcement authority for the development to which
this development approval relates for the administration and enforcement of any matter relating to the
following conditions:

 

1. The development must be carried out generally in accordance with the At all times

following documents:

e Proposed Site Plan with Koala Habitat Overlay, prepared by Marchese
Partners International Pty Ltd, dated 4244/2020 8/03/2023, Dwg. No.
SK.01, Revision 4.2.

 

 

 

 

 

 

 

 

 

2. At all times
Retention of native vegetation within the Koala Habitat Area,
identified within following documents, is to be maintained:
e Proposed Site Plan with Koala Habitat Overlay, prepared by
Marchese Partners International Pty Ltd, dated 8/03/2023,
Dwg. No. SK.01, Revision 2
e Noosa Springs — Koala Habitat Area Tree Schedule,
prepared by Gondwana Ecology Group, dated 9/03/2023
3. ildi i i

   

 

 

 

 

 

State Assessment and Referral Agency Page 4 of 9

Log in to download the original (2107-23530 SARA to change response - 61 Noosa Springs Dr, Noosa Heads - MCU21_0110.msg)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.