                                                                                       2007/2399



Contributions Towards Council Infrastructure
73.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
      upgrading various infrastructure at the rates applicable at the time of payment. An estimate
      only of the contribution amounts under the current Council policies and requirements is
      outlined in the table below:


                                                                                  Amount:
       Contribution Required For:
                                                                    Stage 1       Stage 2           TOTAL
       PSP12 – Public Open Space Contributions (Park)                $ 3,126     $ 81,286           $ 84,412
       PSP16 – Sewerage Headworks Contributions                       $1,318       $34,270           $35,588
       PSP17 – Water Supply Headworks Contributions                   $4,892      $127,204          $132,096
       PSP20 – Pathway Trunk Network Contributions                      $703       $18,271           $18,974
       TOTAL Contribution Amount =                                  $ 10,039      $261,031          $ 271,070
       Please note, that these amounts are all subject to variations in the Consumer Price Index, All
       Groups Brisbane from JUNE 2008 until the date of payment.

      All contributions must be paid prior to Council endorsement of the plan of survey.

General
74.   A suitably qualified Registered Professional Engineer Queensland shall prepare engineering
      drawings and specifications for all engineering works, which shall be submitted in conjunction
      with an application for a Development Permit for Operational Works. In this regard a
      DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in
      conjunction with any application for Operational Works.
75.   Digital detailed designs including drawings, calculations, specifications and a schedule of
      works, shall be submitted with any application for a Development Permit for Operational
      Works in respect of roadworks and stormwater drainage works. The design shall be in
      accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
      Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
      existing and proposed services required by the development shall be shown on the plans.
76.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
77.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
78.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
79.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
80.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
                                                                                    Page 11 of 24

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUEPRSEDED Decision Notice - Advice Agency - DNRW [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.