                                                                                      2007/2399



33.   The carparking area shall be drained and the sealed pavement constructed to access road
      standards. Plans and specifications for these works shall be submitted in conjunction with an
      application for a Development Permit for Operational Works.
34.   All carparking shall be kept maintained and line-marked in a condition fit for use to the
      reasonable satisfaction of Council.
Power
35.   An underground electricity service shall be provided to each lot.
      In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
      with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.

      The detailed designs shall then be submitted to ENERGEX for approval and a copy of their
      approval submitted to Council in conjunction with a “Certificate of Electricity Supply for
      Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
      prior to Council endorsing the Plan of Survey.
      Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
      be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
      purchasers of the proposed lots.
36.   Street lighting and pathway lighting throughout the subdivision shall have a high energy
      efficient rating to the reasonable satisfaction of Council and shall generally be provided in
      accordance with the principles of Council’s Engineering Design Standards.
Telecommunication
37.   The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
      provision of new underground telephone services to the proposed lots. In this regard written
      confirmation from an approved telecommunication agency shall be submitted to the Council
      prior to Council endorsing the Plan of Survey.

Roof Water
38.   Roof runoff from any new dwelling/building shall be directed to a rainwater storage system or
      tank that is installed to ensure water from the rainwater storage system or tank is used for
      external uses (such as watering gardens, irrigation, ornamental ponds, water features,
      topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in
      washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
      installed in accordance with the Queensland Development Code (QDC) current at the time of
      building approval, and shall be part of the plumbing application for approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system.
Stormwater Management
39.   A Stormwater Management Plan (SMP) for the construction and operational phase of the
      development shall be submitted in conjunction with any application for a Development Permit
      for Operational Works that demonstrates that the proposed stormwater treatment train can
      meet the water quality objectives for the Noosa Springs development and that the lakes have
      the capacity to treat the runoff from this additional development. Experts in the relevant field
      shall prepare the SMP.
40.   The authors of an SMP shall be responsible to oversee that the SMP is carried out and to take
      appropriate action in the event of any breach of the SMP likely to cause environmental harm.
41.   All stormwater drainage shall be designed in accordance with the provisions of the Australian
      Rainfall and Runoff (A.R.R.), and Noosa Council Standards. Pipe and channel drainage
      systems shall be designed to cater for Five (5) year Average Recurrence Interval design storm
      (ARI.). In all cases the major event surface flow paths shall be designed to cater for the one
      hundred (100) year ARI.
                                                                                    Page 6 of 24

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUEPRSEDED Decision Notice - Advice Agency - DNRW [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.