Council archive · source document
20150426 - Engineering Drawings · 132007.2062
Attached to the e-mail OPW16/0050 - Operational Works Application 1 of 2.
APPENDIX A
REQUIREMENTS FOR SITE DRAINAGE,
LAYOUT FOR WET SITE
v
TO OUTFALL
2 c«—-—-
S
ola DQ
Oe} =)
Wx Ss
O/~
y efi
AX
Vv
TO OUTFALL
ae
8 Ke
s/s
2
Fe
Yv ~
B. DRAINAGE
TO OUTFALL TO OUTFALL
A, TYPICAL DRAINAGE LAYOUT
L TO OUTFALL
C. DRAINAGE LAYOUT FOR CUT & FILL SITE
THE SITE MUST BE
ACCORDANCE WITH THE ABOVE PRINCIPLES
2. PROVISION OF PAVING, SURFACE GUTTERING OR UNDERGROUND PIPING WILL
DRAINAGE.
4. DRAINAGE
R:\rienmacfiles\Rienmac\15\Large\15330 - Lt 219 Corsair Cr, Sunrise Bch - Steve-Dianne Selby - Des Crawford\15330.dwg, Model,
26/11/2015 9:25:52 AM, L Roth, Rienmac Pty Ltd, CutePDF Writer, A3, 1:100
— > 7 La cot
Ve
\
\
) GROUND OUTSIDE
~~ ) RESIDENCE TO FALL TO
EARTH DRAIN AT 1:100
EARTH DRAIN REQUIRED IF
FACE IS LIKELY TO SCOUR
N\-
~~ EARTH DRAIN
(FALL 1:100)
SLAB CAST ABOVE GROUND
LEVEL TO SUIT DRAINAGE
CONDITIONS AND FALLS TO
SEWERS AS PER LOCAL
AUTHORITY ORDINANCES.
SO GRADED AND DRAINED THAT THE WATER IS SHED FROM THE BUILDING PLATFORM IN
- ALL ASSIST IN ACHIEVING GOOD
3. GOOD DRAINAGE MUST BE MAINTAINED THROUGHOUT CONSTRUCTION AS WELL AS AFTER PRACTICAL COMPLETION
MUST NOT BE DIRECTED AT AN ADJACENT LOT IN A CONCENTRATED FORM.
COMPACTED CUT
MATERIAL
CHECK a on
APPENDIX B SITE PREPARATION AND EARTHWORKS.
BANK WIDTH [800mm OR AS FOLLOWS FOR VARIOUS SOIL TYPES
WELL GRADED GRANULAR FILLS.
A- 1.5 d - WEATHERED ROCK :
B- 2.0 d - CLAYS : SILTY, SANDY AND GRAVELLY CLAYS
C- 3.0 d - SILTS : SANDS AND SOFT CLAYS
FLOOR SLAB
|
DRAINAGE SYSTEM
REFER APPENDIX A
WHERE 'd' EXCEEDS |200mm, REFER TO ENGINEER FOR
RE-APPRAISAL OF FOOTING AND SLAB DESIGN,
CAN NOT BE ATTAINED DUE TO SITE CONSTRAINTS
ETAINING WALL AND/OR PIERS TO NATURAL GROUND.
WHERE BANK WIDTHS SPECIFIED ABOVE
REFER TO ENGINEER FOR DESIGN OF
NOTES:-
THE CONFINES OF THE BUILDING SITE ARE TO BE RIPPED AND ALL VEGETATION REMOVED FROM
THE BUILDING AREA. GRUB HOLES ARE TO BE BACKFILLED AND COMPACTED AS INDICATED IN NOTE
2.
2. WHERE SLAB AND FOOTINGS ARE TO BE FOUNDED IN FILL, BUILDING PLATFORMS SHALL BE BUILT
UP IN LAYERS AND COMPACTED TO ATTAIN A MINIMUM UNIFORM FIELD DENSITY OF 98% STANDARD
COMPACTION FOR COHESIVE FILL MATERIAL AND A MINIMUM DENSITY INDEX OF 70% RELATIVE TO TEST
E6.1 FOR GRANULAR (NON-COHESIVE) FILL MATERIAL.
3. SOIL MOISTURE CONTENT SHOULD BE MAINTAINED NEAR OPTIMUM DURING COMPACTION, SMOOTH
DRUM ROLLERS MAY BE USED FOR GRANULAR FILLS, VIBRATING SHEEPFOOT ROLLERS ARE
RECOMMENDED FOR CLAYS.
THE QUALITY OF COMPACTION SHOULD BE TESTED BY A RECOGNISED TESTING AUTHORITY - IT IS THE
BUILDER'S RESPONSIBILITY TO ENSURE THAT THE TES
ACROSS THE WHOLE PLATFORM
RIENMAC ery ito
ABN. 52 010 666 430 AC.N. 010 666 430
CONSULTING CIVIL &
STRUCTURAL ENGINEERS
SUNSHINE COAST OFFICE:
SUITE 5, FIRST FLOOR,
SAINT CIRINO, F
[37 BRISBANE ROAD, Email
(PO BOx 144)
MOOLOOLABA QLD 4557
P:- (07) 5478 250d
(07) 5444 |I5q
[email protected]
[email protected]!
Web:- www.rienmac. bi:
CLIENT:
CONNETIVITY PTY LTD
PROJECT:
PROPOSED UNITS
LOT 219 CORSAIR CRESENT
SUNRISE BEACH @LD 4567
REAL PROPERTY DESCRIPTION # COUNCIL:
LOT 219, RP 135364
PARISH OF WEYBA, COUNTY OF MARCH
SUNSHINE COAST REGIONAL COUNCIL
DRAWING TITLE:
APPENDIX A é B
JILDE TY TO ENSURE THAT THE TEST (or TESTS) GIVE AN ACCURATE INDICATION Designed: PLR Drawn: LR
OF THE QUALITY AND DEGREE OF COMPACTION OF THE FILL THROUGHOUT THE ENTIRE DEPTH AND SCALES:
Engineer: PLR |DATE: 25 MAY [5
Inet ote eis mitt wttn | JOB NUMBER DWG No.| ISSUE
PETER RIENECKER — RPEQ 20881 [po nor scace ofr prawnes. | AS [SHEET 21 OF 2 (CHECKED: PLR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20150426 - Engineering Drawings.pdfRelated documentApplication case desk ↗
20150426 - Engineering Drawings.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.