Council archive · source document
20150426 - Engineering Drawings · 132007.2062
Attached to the e-mail OPW16/0050 - Operational Works Application 1 of 2.
[LLL LLL EL EEE LEME LIE EL OLE EL ENOL EP EAL EEE =} [4] [eea) peace Zara iI i J =e = -— 4]! pa == ay | mil | ap : | on le | He 14 iW - ——4 Pu ye | BLOCK WALL =u gy i ! eA are [2] | Pr—14 | ! _ J Ll oe Lind fe LL_LELEE LETZTE LETELIZ MLE GS A L qT TTT TOT TTT TTA TI7 —— rc pea | Ll Ly | Ea | it = Ad 1 ) In=vja_ + — I n=) | tg We | | | TEs ee] t~ i | | | Le pi dasas scart Nyt L | | | nt ++) | | | ri H- | 1 [za] | [eal Were epee ZZ ZZZZPEIEL | | \ | | >) I | J ee 5 . BRACING NOTES —_—-_ - INDICATES BRACING WALL AND ANCHOR RODS. |.2P INDICATES PLYWOOD NAILED TO STUDS AS PER METHOD A OF ASIG84 TABLE 8.18(h) AND HOLD DOWN WITH ANCHOR RODS AT EACH END TO ACHIEVE 6.4KN/m BRACING STRENGTH. BR - Mlé CROSS ROD BRACING [email protected] EACH. BRACING DETAILS AS PER ASI684 - PART 2 FOR N3 WIND CLASSIFICATION, ALL BRACING WALLS ARE TO BE CONNECTED TO THE CEILING FRAMING AS PER ASI684 TABLE 8.22 TO TRANSFER THE DESIGNATED FORCES, R:\rienmacfiles\Rienmac\15\Large\15330 - Lt 219 Corsair Cr, Sunrise Bch - Steve+Dianne Selby - Des Crawford\15330.dwg, Model, 26/11/2015 9:20:53 AM, L Roth, Rienmac Pty Ltd, CutePDF Writer, A3, 1:100 'e' ANCHOR ROD LOCATIONS AS PER ASI684 FOR BRACING WALLS ONLY. PETER RIENECKER - RPEQ 2088 FORCE REQ'D = |82kN PROVIDED = 203kN FORCE REQ'D = 204kN PROVIDED = 2/2kN RIENMAC ery ito ABN. 52 010 666 430 AC.N. 010 666 430 CONSULTING CIVIL & STRUCTURAL ENGINEERS SUNSHINE COAST OFFICE: SUITE 5, FIRST FLOOR, SAINT CIRINO, [37 BRISBANE ROAD, (PO BOx 144) MOOLOOLABA @LD 4557 P:- (07) 5478 250d F:- (07) 5444 lI58 Email:- info@rienmac. biz [email protected]! Web:- www.rienmac. bi: CLIENT: CONNETIVITY PTY PROJECT: PROPOSED UNITS LOT 219 CORSAIR CRESENT LTD SUNRISE BEACH @LD 4567 REAL PROPERTY DESCRIPTION # COUNCIL: LOT 219, RP 135364 PARISH OF WEYBA, COUNTY OF MARCH SUNSHINE COAST REGIONAL COUNCIL DRAWING TITLE: GROUND FLOOR BRACING PLAN Designed: PLR Drawn: LR SCALES: 1:100 Engineer: PLR |DATE: 25 MAY [5 pamsion Hom Riemnec Coiling Engreers [JOB NUMBER DWG No. |_ISSUE DO NOT SCALE OFF DRAWINGS, | A3 |SHEET 6 OF 21 |CHECKED: — PLR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20150426 - Engineering Drawings.pdfRelated documentApplication case desk ↗
20150426 - Engineering Drawings.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.