APPROVED PLAN
MCU22/0016
NOOSA COUNCIL
16 AUGUST 2022
G F E D C B A
4,480 3,700 8,590 2,800 5,910 2,300
PF TD PF TD BLK REN AFW AFW CS AFW CS hoodAFW CS PW PW AFW hood hood BLK REN BLK REN
PB PB
line of sliding door dock division
2,650
ENTRY
STAIR VOID VOID
PLANTER
4,730
TF
UPPER LEVEL PB PB PB UPPER LEVEL
join
FFL 15.910 FFL 15.910
2,650
2,650
DECK LIVING ROOM
PB PB
2,580
retractable awning
TF TF FOYER
5 NGL
4
3
2 TF
1
MAIN LEVEL PB PB PB PB PB PB MAIN LEVEL
join
FFL 12.970 FFL 12.970
AFW CRAFTS GL
MPR bov e N
2,710
<1 M a
ceiling
3,070
join
POOL DECK
join
NGL RW
1,910
join
STORAGE
TF TF FT FT TF CS
LOWER LEVEL POOL LOWER LEVEL
acrylic pool window
FFL 10.770 FFL 10.770
SF
SF
NGL
SF WD.60% Work In Progress
issue issue / amendment
SF 11.08.22 LF AB JH
EXT. FINISHES LEGEND FCA fibre cement awning. PF compliant pool fencing
issue date
client
drawn by
SECTION E
Ingrid & Nick Hutton
AS aluminium screen. FC fibre cement ext. cladding. PW parapet wall.
SF project
AL aluminium louvres, refer sched. FG fascia gutter. PS patio slab. Hutton Plover St
SCALE 1:100 @ A3 location
ASD aluminium sliding door. FT1 floor tile (no refers to type). PV photovoltaic cells. 24 Plover St Peregian Beach
AFD aluminium framed door. fire fireplace RWT rain water tank. SECTION E
AFW aluminium framed window. flue flue kit SBJ silicone butt jointed glass. Aboda Lee Foster • director Scott Falconer • director
Design p - 0424 620 247 p - 0431 267 157
Group e - [email protected]
BA sun control battens, refer detail. GS garage slab. SP structural post, refer engineer. the aboda design group trust
e - [email protected]
Level 2 1794 David Low Way Coolum Beach,
ABN 56 266 884 746 Q. 4573. PO box 2449 Noosa Heads Q 4567
BAL1 balustrade-(no refers to type). HWS hot water service. SF structural footing, ref. eng. t/a aboda design group • BSA License -150580097 • www.aboda.com.au
• This drawing is to be read in conjunction with engineers drawings & reports • Construction
BLK masonry blockwork. HR handrail. TIM timber cladding. to comply with all relevant SAA & NCC Codes & standard Bldg By-law 1975 & as amended •
Copyright for design & drawings remain the property of the authors • Verify all dimensions on
site prior to commencement of any works • These drawings are not to be used for scaling.
C carpet LPG LPG gas bottle. TD timber deck.
scale as shown @ A3 issue
CS concrete slab. NGL NRG board
TF timber floor. drawing no.
WD.
DP
DS
down pipe.
driveway slab.
MR1
NGL
metal roof - (no refers to type).
natural ground line.
TFD
VER
timber framed door
vergola.
WD.603 60%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.