Original source · versioned page text
2017-08-08 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 08 AUGUST 2017
Retention of Existing Trees
6. Existing trees on the site and in the road reserve must be assessed by a qualified arborist
and retained and protected where possible. Where mature trees are to be removed,
reasonable grounds must be given by the qualified arborist. Any tree removed must be
replaced with a similar suitable tree species in a similar location, where practicable.
7. In order to protect existing vegetation and natural habitat values, waste water must not be
disposed of on-site and must be collected and appropriately treated or disposed of off-site.
8. Pest plant species, including “Undesirable species” as listed in Planning Scheme Policy 3
Landscaping Plants and Guidelines and Noosa Council’s Pest Management Plan as
amended from time to time, must be controlled on site.
Bushfire and Natural Hazards
9. The development must be carried out in accordance with section 6 of the Bushfire Risk
Assessment and Bushfire Risk Management Plan for the Noosa North Shore Beach
Campground Upgrade Revision 1 March 2017 prepared by Ecological Natural Area
Management.
10. A copy of the Bushfire Risk Assessment and Bushfire Risk Management Plan for the Noosa
North Shore Beach Campground Upgrade Revision 1 March 2017 prepared by Ecological
Natural Area Management must be provided to the nearest fire authority.
11. The development must be carried out in accordance with the Bushfire Risk Assessment and
Bushfire Risk Management Plan for the Noosa North Shore Beach Campground Upgrade
Revision 1 March 2017 prepared by Ecological Natural Area Management.
Vegetation Management
Works within Protected Land
12. The following works must be undertaken within the land generally located east of the site and
to the north of the site to remedy historic camping encroachment on the dune system.
a. Restoration of the cleared areas of the dune system to a natural state similar to dune
vegetation structure found at immediately north of the Third Cutting.
b. Restoration works must occur between the latitudes of -26.3307 and -26.3357.
c. The establishment of restoration works must commence within 12 months from date
this development permit takes effect.
d. Restoration establishment works must be successfully completed within 36 months
from date this development permit takes effect.
e. The restoration works must be maintained in good order for the life of the development.
f. Public access from the camp ground, through the esplanade, to the beach must be
controlled to prevent disturbance to the restoration area.
Fencing to Protected Land
13. A permanent fence must be constructed along the entire length of the eastern interface of
the site. The fence must be constructed to protect the esplanade from public access generally
in accordance with the alignment on the approved plan and include:
a. Controlled beach access points;
b. Signage promoting the restoration works.
Page 24 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.