Original source · versioned page text
20230025_RECOR_MCU Engineers Letter_20.12.24
Verification Certificate – SQIDEP VC
Reference Number: SA-2021/006/VC
• The Hydrochannel media is estimated to have an effective life of 1 year. It is
suggested that a 12 month maintenance cycle include replacement of the
media.
• Performance is contingent upon the installation being similar to that shown in
this trial. Alternative installations may result in different outcomes.
Independent Mr Andrew Allan, Afflux Consulting
Reviewers
Mr Damian McCann, Australian Wetlands Consulting
Accepted by
17th June 2021
Governance Panel
Accepted by
22nd June 2021
Stormwater Australia
Board
© Stormwater Australia 2021 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.