Attachement 2 - Body Corporate Consent
BODY CORPORATE FOR RIVERSIDE NOOSA CTS 26987 CT
S 40848
RESOLUTION VOTED ON OUTSIDE A MEETING
pursuant to Section 60-61 of the Body Corporate and Community Management Act
(Accommodation Module) Regulation 2020
NOTICE OF MOTION given on 4 August 2022 to ALL Committee Members
CHAIRPERSON Mr Craig O’Neill
SECRETARY Mr Les Lewis
TREASURER Mrs Robyn Hobbs
Ordinary Members of Committee Ms Marg Walton
Mrs Jane Wilson
Ms Helen Bailey
Mr Kumaradevan Mahadevan
BODY CORPORATE FOR RIVERSIDE NOOSA CTS 26987
MOTIONS FOR COMMITTEE CONSIDERATION
Motion 3: FOLDING ARM AWNING - Committee Resolution – Submitted by the owners of Lot 8
(unit 4) Raymond and Meagan Smith
That the Body Corporate permits the owners of Lot 8 (unit 4) Raymond & Meagan Smith to install a
folding arm awning to the front balcony their lot as described in the application attached hereto on the
following conditions:
AND FURTHER THAT the authorisation granted pursuant to this motion is subject to and conditional
upon;
1. that the improvement is in accordance with the description provided to the Body Corporate;
2. that the owner of Lot 8 (unit 4) is responsible to meet the entire cost and expense of the works and
the on-going maintenance, replacement and all future associated costs of the improvement;
3. that approval is subject to the owners of Lot 8 (unit 4) providing Riverside Noosa Body Corporate
with a copy of Council Building Approval and Building Certification Permits from Pacific BCQ
Certifier PRIOR to installation of the awning;
4. that the installation does not compromise any safety standards or fire regulations of the building
including QLD Cladding regulations;
5. the owner of Lot 8 (unit 4) indemnifies the Body Corporate against any claims arising from the
works project;
6. any damage caused to common property as a result of Tradesmen being reimbursed by Lot 8 (unit
4);
7. that all Tradesmen engaged in the works are qualified, licensed and holding the required
Contractors All Risk, Public Liability, Workers Compensation insurances for the works and that all
Workplace Health and Safety Standards are maintained at all times;
8. that the owner of Lot 8 (unit 4) indemnify the Body Corporate against any claims arising from and
in connection with the works, including any damage caused to the common property;
9. that the owners of Lot 8 (unit 4) provides appropriate consultation with the contractors in relation to
contractor parking to ensure that the access to the property is not impeded in any way;
10. that all work place, health and safety standards are maintained at all times.
11. That the Body Corporate is provided a works schedule detailing noise related days and times in
order for owners to update their guests and letting agents (requesting 7 days’ notice in advance).
MOTION CARRIED YES – 5 NO – 0 ABSTENTIONS – 0
Explanatory Note: Lot 8 owners have advised the following:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
Don Grehan (Certifier from Pacific BCQ has advised that the application submitted to Council to install the awning is required to be accompanied by the approval of the Body Corporate. Should Lot 8 receive approval from the Building Certifier and Noosa Council through to the point of installation they are happy to document the process and provide to the Committee should any other Owners wish to submit an awning application. Committee Members that voted on this resolution: Ms Helen Bailey Mrs Robyn Hobbs Mr Craig O’Neill Mrs Jane Wilson Ms Marg Walton Dated this 12th day of August 2022 This correspondence is sent to all owners for information purposes and is required to be sent under the provisions of the Body Corporate and Community Management Act 2020.