Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Submission MCU 19 0117 BC Beach Rd Holiday Homes - Beach Rd BC · MCU19/0117

Attached to the e-mail PM Submission - The Body Corporate, Beach Road Holdiay Homes - MCU19/0117 .msg.

of 45

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Title Reference 50689326 Page 17 of 42

r

“|

 

[ SCHEDULE D OTHER DETAILS REQUIRED/PERMITTED TO BE INCLUDED |

1.

1.1.

1.2,

1.3.

1.4.

1.5.

1.6.

2.1.

PROGRESSIVE DEVELOPMENT

To facilitate the progressive development of the Beach Road Holiday Homes Community Titles Scheme (as
identified in Schedule "B"), the original owner may, at any time, enter on the Scheme Land (or any part of it), the
common property and any Lot in the Beach Road Holiday Homes Community Titles Scheme to undertake works of
any kind necessary or incidental to establishing utility Infrastructure, utility services (any connection thereto) and
future development of further Lots and common property, including, but not limited to, the following work:

(a) excavation and general earth works;
(b) the construction of common properly areas (including roads);

(c) the construction on the common properly of such improvements and facilities as maybe considered
necessary by the original owner to establish infrastructure, utility services and connections thereto and future
development to further Lots and common property; and

(d) the construction of services infrastructure whether public or private including, but not without limiting the
generality thereof, connections for sewerage, gas, electricity, telephone, fibreoptic or any other lawful service
available to the public,

all of which works are collectively called the "Utility Infrastructure and Future Developments Works".

The original owner may bring upon the Scheme Land any machinery, tools, equipment, vehicles and workmen to
facilitate the carrying out of the Utility Infrastructure and Future Developments Works.

The original owner shall use reasonable endeavours to ensure that the Utility Infrastructure and Future
Development Works will be carried out in a manner which minimises (so far as is practicable) the inconveniences (if
any) caused to the Body Corporate or to owners and occupiers of Lots in the Scheme.

The Body Corporate and each owner and occupier of Lots in the Beach Road Holiday Homes Community Titles
Scheme may not object or claim compensation against the original owner in respect of any noise, dust, traffic or
nuisance of any type which may arise in connection with the Utility Infrastructure and Future Development Works.

The Body Corporate and each owner and occupier of Lots in the Beach Road Holiday Homes Community Titles
Scheme agrees that the original owner shall be entitled to free and uninterrupted access over and to the common
property and to any Lot to carry out and undertake the Utility Infrastructure and Future Developments Works.

The expressions "Utility Infrastructure" and "Utility Service" shall have the same meaning assigned to theme as in
Schedule 6 of the Body Corporate and Community Management Act 1997 as amended from time to time, The
expression the "Original Owner" means the party identified in Item 5 of this Community Management Statement
together with any successor or assign of any undeveloped part of the Scheme Land.

SERVICE LOCATION
Service Location Diagram over Lots 1-24 on SP 186174, Lot 91 on SP 215773, Lots 25 - 48 on SP 21 5779 and Lot

500 on SP 215779 and that part of Common Property in Beach Road Holiday Homes Community Titles Scheme in
the form annexed marked “SLD”.

 

Lot on Plan or CP Statutory Easement Service Location

 

Common Property of
the Beach Road

Holiday Homes Support, Water, Electricity, Sewer, Stormwater, Telstra, Gas Plan SLD 08/05/08
Community Titles PP ¥ and 11/12/08
Scheme 37583

 

Lot 1 on SP 186174 | Support, Water, Electricity, Sewer, Stormwater, Telstra, Gas_| Plan SLD 08/05/08

 

Lot 2 on SP 186174 | Support, Water, Electricity, Sewer, Stormwater, Telstra, Gas | Plan SLD 08/05/08

 

 

 

 

 

Lot 3 on SP 186174 Support, Water, Electricity, Sewer, Stormwater, Telstra, Gas_| Plan SLD 08/05/08

 

   

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Submission MCU 19 0117 BC Beach Rd Holiday Homes - Beach Rd BC.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.