Original source · versioned page text
Response to NDN - Condition 3 - Bounce Hostel
Attached to the e-mail Amended plans submitted in relation to Negotiated Decision Notice - MCU18/0102.
Very large file (12.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
SIGN A SIGN B SIGN C SIGN D SIGN E SIGN F SIGN G SIGN H SIGN I
NEW PLAN TO SHOW PARKING
SIGNAGE IN RESPONSE TO MCU18/0102
SLOW DOWN FLOOD BARRIER AHEAD
PEDESTRIAN LOW HEAD ROOM DO NOT PROCEED
TRAFFIC WHEN IN OPERATION
SIGN C SIGN E SIGN I
SIGN C SIGN E SIGN I
SIGN B SIGN A
line of pool over
C Information Request MCU18/0102 22/03/2019
Issue Description Date
SIGN F
Project
BOUNCE NOOSA
line of pool over
line of pool over
Plan Client Name
SIGNAGE LAYOUT LEVEL 1 1 : 100
Fuqiang Investments Pty Ltd
Project Address
SIGN F
14-16 MARY STREET
SIGN G
NOOSAVILLE QLD 4566
Designer (s) Drawn by
ICB JM
SIGN G
Drawing Title
line of pool over
SIGNAGE LAYOUT PLAN
SIGN H
SIGN G
SIGN H
SIGN H
SIGN H
SIGN B
ZEST DESIGN STUDIO
Plan P
A
| 07 5474 1664
| 1A/12 Action St, Noosaville, QLD 4566
SIGNAGE LAYOUT BASEMENT 1 : 100 E | [email protected] ABN: 37 601 151 508
LEVEL W | www.zestbuildingdesign.com.au Q.B.C.C Lic. No: 1307012
Project Number Sheet Number
18001 A.016
N
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
BA C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.