Decision Notice - Approved by Delegation of Authority OPW26 0100 (As Published)
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
D26/127335 - Figure 3: Indicative carpark layout 20 July 2026
Prepared by SEQwater
Amended by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 24 July 2028, unless an application to extend the currency period is
approved by Council.
SITE SPECIFIC CONDITIONS
3. All site surfaces must be effectively stabilised using methods which have achieved effective
short-term stabilisation and will continue achieve effective stabilisation in the medium- to
long-term. Stabilisation must be established, inspected and accepted by a Council delegate
no later than 31 May 2029 unless otherwise agreed to in writing by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
4. All necessary approvals from external service providers and external parties on which the
development works are proposed have been obtained and a copy supplied to Council.
5. A condition report including photographs of the frontage of the site and the mapped waterway
to the west of the works site must be completed and submitted to Council prior to the prestart
meeting.
6. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Erosion and sediment control works; and
c. Other relevant parties.
7. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
8. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
9. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
Page 2 of 8
Document Set ID: 25013511
Version: 3, Version Date: 28/07/2026