Decision Notice - DBW23 0059 [As Published]
Front Fence
8. Front fencing is to allow for casual surveillance from the property boundary to the street by
containing openings or materials that ensure it is 50% transparent (including driveway gates)
and has a height not exceeding 1.8 metres.
Built Form
9. The storage/equipment area on the southern side boundary is to comply with the side and
rear boundary clearance requirements of the Queensland Development Code MP1.2 A2(d).
Environment
10. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
11. A minimum of 20% of the site must be retained as soft landscaping.
12. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
13. Dense landscaping, comprising a mix of native coastal species of ground cover, scrubs and
trees, is provided for a width of 5 metres from the seaward or rear boundary of the site to
provide adequate landscape buffering to protect the coastal dune systems. The landscaping
is to be in accordance with PSP2 – Landscaping.
14. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
15. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
16. All planting areas on the garden and concrete roofs must be planted and maintained at all
times, with replacement planting undertaken promptly where plants fail or do not have a
healthy and vigorous growth.
Stormwater Drainage
17. Stormwater runoff from the development must be discharged to Lorikeet Drive or disposed
of on-site without causing scour or damage to the subject site or any adjoining property.
Damage to Services and Assets
18. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Page 3 of 7
Document Set ID: 22539754
Version: 3, Version Date: 14/08/2023