Council archive · source document
Decision Notice [As Published] · 132008.175
Officer: Denis Wallace
Direct Telephone: (07) 5449 5179
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2008/175
Your Reference: 00475 LO1 NG
12 August 2009
CBD Settlers Cove Pty Ltd
CARE Martoo Consulting Pty Ltd
PO Box 1684
NOOSA HEADS QLD 4567
Dear Madam
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 6 August 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2008/175
Street address: 16 Serenity Close, Noosa Heads
Real property description: Lot 9 SP 195871
Planning Scheme: Superseded Planning Scheme (Schedule to the Planning
Scheme & Strategic Plan 1997)
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - Multiple Dwelling (22 units)
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are prepared by DBI Architecture and
are listed in the following table:
Page 1 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 24 pages
Page 2
2008/175
Plan No. Rev. Plan / Document Name Date
9.1 - Lower Ground Level - Site Plan -
9.2 - Ground Level - Site Plan -
9.3 - Level 2 - Site Plan -
9.4 - Level 3 - Site Plan -
9.5 - Level 4 - Site Plan -
9.6 - Survey & Building Heights Detail – Site Plan -
9.12 - Elevations -
9.12 - Elevations -
and as may be amended by the conditions herein.
General
2. All relevant conditions of Development Permit 23118 DA and the approved Management
Plans for the site shall be complied with prior to the commencement of the approved use.
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
4. The buildings shall be finished in natural, muted tones as generally indicated on the
architectural renderings - Drawings “9.12 Elevations”.
Building Height
5. The finished height of the building, including any rooftop plant or structures, shall not exceed
15 metres above natural and finished ground levels.
6. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
Energy & Water Efficiency
7. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
8. All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation
Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and
Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or
current equivalent standards as may apply, with toilets to comply with the AAAA Water
Conservation Rating System. All new tap ware and shower roses shall not exceed a
maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
requirement.
Landscaping
9. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared Landscape Plan prepared by a suitably
qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
the premises being occupied and maintained at all times thereafter. The Landscaping Plan
shall include the following:
Page 2 of 25
Page 3
2008/175
9.1. Koala and Glossy Black Cockatoo food trees in accordance with the associated
Environmental Protection Authority (EcoAccess) approval conditions for the site and the
approved Settler’s Cove Ecological Restoration Plan and Landscape Master Plan.
9.2. Locations of nesting boxes for Glossy Black Cockatoos shall be indicated on the
landscape plans and installed on existing trees to be retained.
9.3. Vegetation to adequately screen and provide filtered views of the development and
shade hardscaped areas.
Vegetation
10. Existing trees on the site and within road reserves are to be retained except where required to
be removed due to building operations, requirements of the Bushfire Management Plan & the
Ecological Restoration Plan or the conduct of the approved use.
11. During construction, the boundaries of areas of retained and protected vegetation shall be
fenced to prevent access into these areas thereby protecting the vegetation and habitat
values.
12. A fauna spotter shall be employed to oversee the removal of any native trees within the site.
Prior to felling or lopping all trees are to be checked for wildlife (eg. koalas, cockatoos,
possums). If wildlife species are present, the tree shall not be felled or lopped until the wildlife
has left the tree.
13. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
13.1. Re-use for building materials.
13.2. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
13.3. Disposal for firewood.
13.4. Disposal for landscaping purposes.
13.5. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
13.6. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
The Applicant is advised that burning off is an unacceptable method of disposal.
Environmental Covenant Area
14. The registered environmental covenant area within the site (Covenant E) shall be:
14.1. Managed to protect and reinforce its environmental values, particularly its Koala
habitat and corridor values, Glossy Black Cockatoo habitat values, scenic amenity
values and water quality protection function.
14.2. Managed and maintained in accordance with the approved Environmental
Management Plan, Fauna Management Plan, Fire Management Plans and Ecological
Restoration Plan.
14.3. Separated from adjacent development by a 1.2 m high fence. The fence shall be
‘fauna-friendly’ but shall deter unauthorized people from entering the area. Suitably
located lockable gates shall be provided to allow appropriate access by authorised
personnel.
Page 3 of 25
Page 4
2008/175
14.4. Have signs placed on the fence to inform people that the ‘Private Open Space for
Conservation & Waterways Protection’ area is for conservation and waterways
protection purposes and access is prohibited.
14.5. Maintained by authorized people only permitted in this area as appointed by the owner
responsible its management and protection.
14.6. Protected from infrastructure, tracks, drainage, water control devices, etc. or other
development.
14.7. Protected so that native trees and vegetation are not removed, pruned, lopped,
damaged or otherwise adversely affected without written approval from Council.
14.8. The area shall be restored and managed in accordance with the Ecological
Restoration Plan and the Fauna Management Plan.
Fencing
15. Any fencing provided in conjunction with the development is to be setback at least 1 metre
from the road frontage with at least half of any fence setback 2 metres. Dense landscaping is
to be provided between the road frontage and any fencing.
Signage
16. Any advertising sign or device is to comply with Council's policies on advertising.
Community Management Statement Requirements
17. The Applicant and all future owners of the site shall comply with the Environmental
Management Plan (EMP) for Settlers Cove Development 23118 DA and compliance with the
EMP shall be referenced in any community management statement over the site.
18. The Fire Management Plan is to be implemented by the Developer and future owners of the
site and is to be referenced in any community management statement.
Development Permits
19. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Compliance Bond
20. Security in the form of a cash bond or trading bank guarantee for the sum of $50,000 must be
submitted to secure performance of all conditions of this approval prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
21. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Relevant Period
22. The Development Permit for a material change of use lapses if the use has not happened by 6
August 2013, unless an application to extend the currency is approved by Council.
Vehicle Access
23. A vehicular access driveway to serve the development shall be constructed from the Serenity
Close frontage of the site with a maximum width of 6.0m within the road reserve.
Page 4 of 25
Page 5
2008/175
24. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.
PLEASE NOTE: a step between the driveway and the footpath shall be avoided, as it is
preferred to have the footpath continue at a constant grade to minimise the potential for
pedestrians to trip or fall.
25. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall comply with the
minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval and Building Works approval.
26. All vehicles shall enter and leave the site in a forward direction.
Internal Driveways/Ramps
27. The internal driveway and access ramps of the development shall be designed and
constructed in accordance with AS/NZS 2890.1-2004.
Service Bay
28. One of the 2 visitor car parking spaces (excluding the disabled space), at ground level towards
the frontage of the development, shall be used as a shared service bay for small
delivery/maintenance vehicles. This space shall be clearly line-marked and sign posted for
use by Service Vehicles between the hours of 6am to 6pm. Outside of the specified hours the
space can be used as a standard visitor space.
29. The size of the “service bay space” must be sufficient to accommodate a Small Rigid Vehicle
with sufficient length to allow the rear doors of a delivery vehicle to be opened without
protruding into the circulating aisle as well as room for a delivery person to load and unload
the vehicle.
Car Parking
30. Carparking shall be provided within the site as shown on drawings titled 9.1 Lower Ground
Level and 9.2 Ground Level – Site Plan prepared by DBI Architecture as submitted as part of
the Request for Further information Response, except as modified herein.
31. The Lower Ground Level carparking area shall be revised as follows:
Carspaces 1 and T1 must be deleted and that part of the Lower Ground Level revised to
provide motorcycle and/or bicycle parking whilst maintaining suitable access to the
adjacent storage areas.
The tandem car park spaces within the Lower Ground Level (numbered T2-T13 and
T15-T17) must be line-marked and signed so that visitors can only park behind the car
parking space assigned to the resident that they are visiting. For example, if space
number T2 is assigned to Unit 2, then space number 2 must be assigned as a visitor
space for Unit 2.
Six (6) of the single car park spaces within the Lower Ground Level must be line-
marked and signed specifically as resident spaces.
The remaining single spaces in the Lower Ground Level must be line-marked and
signed specifically for “Visitor Parking Only”.
Page 5 of 25
Page 6
2008/175
32. Unobstructed access shall be provided to the Lower Ground Level at all times. Should a
security gate or similar barrier be constructed to prevent unauthorised access to the Lower
Ground Level the property owner shall install an intercom system. The intercom system shall
be sufficient to permit entrance to the basement by visitors of all of the units.
33. A small sign shall be installed within the site (in a clearly visible location for all vehicles to see
near the entry to the car parking area) to advise visitors that visitor car parking spaces are
provided within the basement car park and to use the intercom system (if applicable) to
contact the unit manager or the unit occupier they are visiting to enable entry to the basement
and to these spaces.
34. The Ground Level car parking area alignment shall be revised to be perpendicular to the
access driveway. The revised layout shall provide sufficient manoeuvring area within the
carspaces and access driveway to permit vehicles to access the spaces, manoeuvre and
leave the site in a forward gear in a total of 3 movements.
35. A minimum of 3 uncovered car park spaces and 41 covered car park spaces shall be provided
on site, including 2 clearly defined disabled car park spaces.
36. The car parking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.3m.
37. The proposed turning area at the end of the aisle that serves proposed car park spaces 8 to
14 shall be line-marked with chevrons and have the words “No Parking” painted on the
pavement. A sign shall also be provided to indicate that the area is a “Turning Area Only” and
that “No Parking is Permitted”.
38. All car parking shall be kept, maintained and line-marked in a condition fit for use.
Frontage Works
39. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Serenity Close frontage of the site in accordance with Planning Scheme Policy PSP03
Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
40. All redundant vehicular crossings to the site shall be removed and replaced by kerb and
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council’s Standard specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
41. A stormwater management plan shall be prepared by a RPEQ, specialising in stormwater and
water quality management incorporating the principles of the Environmental Management Plan
for the Settlers Cove Development (23118 DA), that demonstrates water reuse strategies,
infrastructure capacity and effective treatment methodology. The use of rainwater harvesting
tanks for irrigation purposes shall be incorporated in the overall design plans. These plans
shall be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works.
42. Roof runoff from any new building should be directed to a rainwater storage system or tank
(minimum 23,000 litres) that is installed to ensure water from the rainwater storage system or
tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the approved Stormwater and Water Quality Management Plan
and the Queensland Development Code (QDC) current at the time of building approval, and
shall be part of the plumbing application for approval. The location and capacity of the tanks
shall be clearly shown on the plans submitted for Building Works/Operational Works approval
and any overflow shall be directed to the stormwater drainage system.
Page 6 of 25
Page 7
2008/175
43. All stormwater drainage shall be collected on site and discharged so there is no net increase
in stormwater runoff from the site.
44. To ensure that polluted run-off does not enter the water table, the adjoining waterways or
Council’s stormwater drainage system, stormwater run-off from the car parking areas and the
driveways shall have the first flush (the first 12mm of rainfall or hose-down) collected in a
grease/oil arrestor/gross pollutant trap provided on site prior to being permitted to discharge
into the larger drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to
obtaining a Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
45. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
46. The applicant must provide reticulated sewerage services to the proposed development in
accordance with The Noosa Plan.
47. A registered easement shall be created over the zone of influence of all sewers not currently
within an easement within the subject site. The easements shall generally be parallel to and
centred over the sewer main and be equivalent in width to twice the depth to invert level of the
sewer at the deepest point within the allotment (measured from the finished surface) and be
no less than 3.0 metres wide overall. A licensed surveyor shall accurately locate all sewer
mains and determine the necessary width of the easement which shall be shown on any plans
submitted for Operational Works or Building Works approval. The surveyor shall certify that
the sewer and the zone of influence is wholly contained within the easement to be created.
48. Buildings and structures shall maintain a minimum of 1.5 metres clearance from Council
sewerage infrastructure within the development site and shall be located clear of any existing
or proposed easement.
49. Proposed landscape planting within existing or proposed sewer easements shall be low
growing when mature and be suitable approved varieties in accordance with Council
guidelines for such plantings. Proposed tree plantings must be located a minimum of 1.5
metres from the Council rising main located in the adjacent lot.
50. A clear area of 1.0 metre must be maintained around the sewer inspection opening.
Town Water Supply
51. The applicant must provide reticulated water supply services to the proposed development in
accordance with The Noosa Plan.
52. The applicant must supply the development site with reticulated water via a single Council
installed primary water meter located outside the property boundary and in an easily
accessible location. For a community title or sub-lease scheme additional water meters must
be installed for each separate title. These meters must be supplied and installed in
accordance with Council’s requirements.
Page 7 of 25
Page 8
2008/175
53. The applicant shall provide a fire service (fully testable single detector check with metered
bypass), where applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire
hose reels).
54. Any construction works to be undertaken in the vicinity of Council’s existing water supply or
sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of existing infrastructure must be met by the
applicant.
Service Easements (Sewer / Stormwater)
55. No building or other structure shall be constructed or encroach over an easement.
Construction Issues
56. A Traffic Management Plan for the each construction phase of the development shall be
submitted to and approved by Council at least 5 working days prior to the commencement of
any Building works or at least 5 working days prior to the pre-start meeting for Operational
Works. The Traffic Management Plan shall include but not be limited to:
Limiting the routes for the heavy vehicles to the major road network and prohibit the
use of the local roads as access to the site;
Indicate provision for on-site and off-site parking for the required workforce;
Indicate the location of loading and unloading areas,
Indicate the location of any “holding” areas for heavy vehicles and
Operating hours.
57. Construction staff shall not park on Serenity Close or elsewhere on-street. Parking shall either
be on site, an adjacent vacant site or at a suitable off-site location serviced via a shuttle bus.
58. A Condition Survey must be carried out on existing structures and services prior to any
excavation or construction works taking place on site. If distress already exists, a
photographic survey should be undertaken, the distress measured and a plan to monitor
changes to distress shall be implemented.
Earthworks
59. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands and/or services within the development site or that
border the development site. Fences that are affected shall be replaced prior to the Building
Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall
be clearly shown on the plans submitted for Operational Works approval.
60. Plans and details outlining the extent of earthworks required on site and any trees to be
retained shall be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works.
61. All major excavations (including the basement and driveways) shall be shored to prevent
batters extending into areas and vegetation that are to be retained. All trees to be retained
should be adequately tagged to Council’s satisfaction and enclosed with a barrier fence to the
drip line to prevent damage.
62. A geotechnical engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land and/or services, and make
recommendations on the type of foundation system(s) best suited for the proposed
development. The recommendations of this report shall be incorporated into the design and
construction of the proposed development.
Page 8 of 25
Page 9
2008/175
63. A geotechnical engineer or similar qualified expert shall supervise and certify the earthworks
required on site and measures to ensure stability of adjoining buildings and/or structures
and/or land and/or services.
64. Earthworks shall not cause the ponding of water on any adjoining lands or the blockage of, or
interference with, any natural watercourses or overland flow path.
Erosion and Sediment Control
65. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment prepared in
accordance with the “Manual for Erosion and Sediment Control” Version 1.2 prepared by the
Sunshine Coast Regional Council are required to be submitted to the Council prior to obtaining
a Development Permit for Operational Works.
General (Engineering)
66. A suitably qualified registered professional engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
67. Digital detailed designs, including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational
Works in respect of roadworks and stormwater drainage works. The design shall be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards –
Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans. To
facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
68. A construction management plan/strategy to ensure no damage occurs to Council services
shall be prepared by a suitably qualified registered professional engineer and submitted to
Council in conjunction with any application for Operational Works.
69. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
70. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
71. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
72. As Constructed drawings and data shall be certified by a qualified experienced civil engineer
for design intent, and a licensed surveyor shall certify the cadastre and the location, level and
type of all services and structures, all of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Page 9 of 25
Page 10
2008/175
Refuse
73. General refuse and recycling collection and storage system to include:
73.1. Use of 1.1 cubic metre low noise bulk bins.
73.2. A bin wash facility within each of the three basement waste storage areas.
73.3. Refuse chutes must be provided in accordance with Council’s Policy for “Refuse
Chutes and Accessories in Multi Storey Buildings”.
74. General refuse and recycling disposal system to include:
74.1. Deletion of the proposed landscaping from the north western corner of the lot to allow
for an external bulk bin storage area. The Landscaping plan submitted for approval
shall show this change.
74.2. A paved flat and level area adjoining the front boundary and the western side of the
driveway. This area is to extend along the driveway for 5 metres length with a 1.5
metre depth.
74.3. The adjoining 5 metre length of driveway to be level without any step up or down
between the driveway and the storage area.
74.4. The driveway not having any step at the roadway gutter.
74.5. The development permit for operational works to show compliance with these
requirements for the storage area and driveway, and be submitted to Council’s Healthy
Places Unit for approval prior to issue of the permit.
74.6. The storage area being suitably screened from public places and neighbouring
properties.
74.7. The storage area only being used for bin storage the day prior to collection and on the
collection day.
75. A Construction Waste Management Plan shall be submitted and approved by Council’s Waste
Management Section prior to issue of a development permit for operational works. Waste
Management Plans are required to be in accordance with Planning Scheme Policy 11, Waste
Management Plans see table below. Waste storage areas are to provide for adequate
separation of all reusable, recyclable and waste materials. These shall be located so that they
are convenient and safe to use (refer to Noosa Council Waste Management Code).
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
Page 10 of 25
Page 11
2008/175
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify proposed *specify contractor and
(m³) re-use or on-site contractor and landfill site or
recycling recycling outlet other disposal
methods site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
Noise
76. Noise emission from mechanical equipment shall comply with the following requirements:
76.1. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
76.2. Pumps
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
10pm to 7am: No audible noise.
77. Written certification from a suitably qualified person shall be submitted confirming that the
noise levels from all mechanical equipment comply when measured at either the residential
boundary or outside the most exposed part of an affected building, whichever is the closest to
the equipment.
The assessment and certification is required immediately after installation of the equipment
and prior to any occupation of the building, and in a format approved by Council. All
equipment should be operating at the same time to test the overall noise level created.
NOTE: It is highly recommended that the person you engage to certify the installation is
involved at the plan development stage so they can recommend where this equipment is best
located. They can also advise about noise enclosures and can make other suggestions to
avoid noise problems. It is a lot more costly to try to deal with noise problems after everything
is built.
Page 11 of 25
Page 12
2008/175
78. Noise from building works associated with residential development shall comply with the
following –
78.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
78.2. All reasonable measures are taken to minimise noise emissions.
78.3. Not permitted on Sunday or public holidays.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Vegetation Concurrence Department of PO Box 573
Management Natural Resources
NAMBOUR QLD 4560
& Water
Koala habitat area Concurrence Department of Koala Conservation Unit
Environment & LeveL 8, 160 Ann Street
Resource CITY EAST QLD 4002
Management
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan No. Rev. Plan / Document Name Date
9.1 - Lower Ground Level - Site Plan -
9.2 - Ground Level - Site Plan -
9.3 - Level 2 - Site Plan -
9.4 - Level 3 - Site Plan -
9.5 - Level 4 - Site Plan -
9.6 - Survey & Building Heights Detail – Site Plan -
9.12 - Elevations -
9.12 - Elevations -
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
Page 12 of 25
Page 13
2008/175
Existing Development Approved Development
Existing Use Class Approved Use Class
Existing Quantity Approved Quantity
/ Use / Use
Multiple Housing - 16 x 3 Bedroom
Detached House 1 Dwelling Type 4 – Units &
Conventional 6 x 2 Bedroom Units
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $38,299 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from March 2009 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
4. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, storm water drain or a
watercourse. On the spot fines apply for such offences.
5. The plans for the proposed building work have not been assessed for compliance with the
requirements of the Building Code of Australia as they relate to people with disabilities. Your
attention is drawn to the matter that either or both the Disability Discrimination Act 1992
(Commonwealth) and the Anti-Discrimination Act 1991(Queensland) may impact on the
proposed building work.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
Page 13 of 25
Page 14
2008/175
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Operational landscaping, access and car parking, site civil works,
Works stormwater drainage, excavation of materials to fill
another site and erosion & sediment control.
Development Permit for Building Works Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
12 SUBMISSIONS
There were no properly made submissions about the application.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997.
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Denis Wallace
SENIOR DEVELOPMENT PLANNER
Page 14 of 25
Page 15
2008/175
Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
<
Page 15 of 25
Page 16
2008/175 Page 16 of 25 [OCR of page images] 2008/175 documents’ and, if required, to provide an ASS Management Plan NRW requested this information from the applicant in written correspondence dated 15 May 2008 The penod prescnbed within the /ntegrated Planning Act 1997 for the provision of this Referral Agency Response 1s about to expire and NRW has yet to receive adequate supporting information fromthe —applicant—reiating—to—the —identification—and— management of ASS _ As section 5 3 of SPP2/02 requires an Assessment Manager to confirm whether ASS 1s present within the area to be disturbed by the proposed development, NRW suggests that the Assessment Manager may wish to defer any decision on the application until an ASS investigation report and, if required, an ASS Management Plan ts submitted and assessed This will provide an opportunity for NRW to give the Assessment Manager appropriate technical advice regarding the ability of the proposal to meet Development Outcome 1 enunciated within SPP 2/02 4. THIRD PARTY MATTERS The Chief Executive of the Department of Natural Resources and Water provides the following advice to assist the Assessment Manager to fully consider the application Aboriginal Cultural Heritage Act 2003 NRW also takes this opportunity to advise the Assessment Manager of the responsibilities of applicants under the Aboriginal Cultural Heritage Act 2003 The Assessment Manager may wish to include this informaton as an Advisory Note on the Decision Notice issued for the applicaton Under section 23 of the Abonginal Cultural Heritage Act 2003 a person who carnes out an activity must take all reasonable and practicable measures to ensure the activity does not harm Abonginal cultural hentage (the “cultural hentage duty of care") Maximum penalties for breaching the duty of care are $750,000 for a corporation and $75,000 for an individual Applicants will comply with the duty of care in relation to Abonginal cultural hentage if they are acting in accordance with cultural heritage duty of care guidelines gazetted under the Abonginal Cultural Heritage Act 2003, available on the NRW website, or in accordance with an agreement with the Abonginal party for the area or a cultural hentage management plan approved under part 7 of the Abonginal Cultural Heritage Act 2003 Applicants are also encouraged to undertake a search of the Abonginal Cultural Hentage Database and the Aboriginal Cultural Hentage Register, administered by the Cultural Heritage Coordination Unit, NRW Application forms to undertake a free search of the Cultural Heritage Register and the Database may be obtained by contacting the Cultural Heritage Coordination Unit on (07) 3238 3838 or on the NRW website www nrw gid gov au/cultural_hentage Beare ional Manager, Planning and Development mbour — South East Region Authorised Delegate 6 June 2008 Attachment 1 Schedule A — Glossary ' SPP 2102 and the SPP 2/02 Guideline are available from waw ipa gid gov aulcodes/codespoliaes asp The associated technical documents are available trom http (www new gid gov au/land/ass/products htrnt Department of Natural Resources and Water ICOS06NAMO0001 Page 2 of 4 Page 16 of 25
Page 17
2008/175 Page 17 of 25 [OCR of page images] 2008/175 Schedule A — Glossary Cleanng, for vegetation *® means remove, cut down, ringbark, push over, poison or destroy in any way including by burning, flooding or draining, but eS NOt I ide Gest ig Slant Qe lation Cleanng as a result of the MCU includes © cleanng of assessable vegetation that will result from the change in use, consisting of any of the following ~ clearing for infrastructure—including buildings, stormwater management systems, water supply and sewerage systems—that are proposed as part of the MCU application = cleanng for roads, vehicle parking, vehicle and pedestnan access, utilites corndors, services, fences, firebreaks and fire management lines that are proposed as part of the MCU application = clearing that may not be necessary for developing infrastructure but is associated with the use applied for And * clearing of assessable vegetation that will become exempt if the development application is approved This includes any of the following examples = Clearing for routine management and essential management purposes associated with the approved development including cleanng to maintain proposed infrastructure, facilities, roads, access routes, utilties, services and fences, and cleanng to maintain the safety of persons and property that will be associated with the development — clearing for necessary fire breaks and fire management lines associated with the development This will be assessed as follows 1 all built infrastructure other than underground services, roads and fences will be assessed as requinng clearing for firebreaks with a width of 15 times the height of the tallest vegetation adjacent to the infrastructure, or 20m, whichever is the greater However, evidence may be provided to NRW that confirms that an alternative firebreak width is required that is consistent with the State Planning Policy (SPP) 1/03 Guideline i all proposed allotment boundanes will be assessed as requiring clearing for fire management lines with a width of 10m constructed on either side of the allotment boundary, unless NRW is provided with evidence that confirms that an alternative width of fire management line 1s required or an alternative configuration of fire management lines are required that is consistent with the SPP 1/03 Guideline m in the case of evidence being presented that demonstrates alternative fire management guidelines as being sufficient and consistent with the SPP 1/03, NRW may condition the development so that the full extent of exempt cleaning prescnbed for essential management under Schedule 8 of the IPA cannot be cared out by current or future landholders — where there is a concurrent application for Reconfigunng of a Lot (RaL) for the same land that has not yet been decided—clearing as a result of the RaL as set out in the Ral Policy item 2 will be assessed Endangered Regional Ecosystem means a regional ecosystem that is prescribed under a regulaton and has either— (a) less than 10% of its pre-clearing extent remaining; or Department of Natural Resources and Water COSO8NAMO0001 Page 3 of 4 Page 17 of 25
Page 18
2008/175 Page 18 of 25 [OCR of page images] 2008/175 (b) 10% to 30% of its pre-clearing extent remaining and the remnant vegetation remaining ts less than 10000ha Realonal Ecosystem means a vegetation community in a boregion thal i Remnant Vegetation for an area of Queensland within a regional ecosystem map, means the vegetation mapped as being within remnant endangered regional ecosystems, remnant of concem regional ecosystems and remnant not of concern regional ecosystems shown on the map Urban area Is an urban area as defined in the /ntegrated Planning Act 1997. Urban Purpose ts an urban purpose as defined in the Integrated Planning Act 1997. Vegetation is a native tree or plant other than the following * grass or non-woody herbage * a plant within a grassland regional ecosystem prescribed under a regulation * amangrove Department of Natural Resources and Water ICOSOBNAM0001 Page 4 of 4 Page 18 of 25
Page 19
2008/175
Page 19 of 25
[OCR of page images]
2008/175
wa, currence Agency Response
‘
~ * This nti sued ty the Department of Envionmant and Resource Management pursuant to Sections 2.3 16 and
3.3.18 of the Infegrated Planning Act 1997, to advise ofa decision or action.
CBD Settlers Cove Pty Ltd-
,G/- Marto Consulting + oa
: "PO Box-16R4 2° .
:; NOOSA HEADS QLD 4967 ©
et CI- Intemational Coastal Management”
fees #S0L0 COAST MCQLD § 9726, brs
ek rae gy SS
' Dear Sir/Madam et,
Re: ‘Referral for Concurrence Agency Response
. . The Deparimé te of Efivronniant anc Resource | Mansgement (DERM) wishes to advise that the referral for a
1 ‘concirretite’ agency ‘fesponge relating fo,the Nature Conservation (Koala) Conservation Plan 2006 and
Mariagenient Plan 2006-2016 (the Koala Phan). received o on 2 May 2008, has been assessed and Gecided
6n 6 April 2009. *; ~* er i: te
aa . | ; a teop white
Property/Location: Soe “ome
Street address - Serenity Close NOOSA HEADS QLD 4567
<*, LovPlan - Lot 603 Plan $P188270
eres
7
ey / iy
nt Concurrence Resporise for Development ina ala Habitat Area” “os :
fA material change of use of premises ina Koala Conservation Area
Recommendation
Approve in full with conditions
Ve Queen: iensland Governnient.
Ervironmental Protection Aven
* Quesmnnd as od ide ere ‘
ey |
< é ay
Page 19 of 25
Page 20
2008/175 Page 20 of 25 [OCR of page images] 2008/175 orrevorunanial Weenoes And permts Notice Concurrence Agency Response The approved plans The approved plans and/or documents for this approval are: Plan/Document Pian/Document Name Date No. R79130 Fauna Management Plan - Settlers Cove, Noose Heads May 2005 Prepared by: C & 8 Group Settlers Cove Noosa Reskjential High Density Environmental Management 515184 Plan EMP?) 22 July 2005 Prepared by: WBM Oceanics Australia . 04.05.2005 Settlers Cove Nooss Landscape Master Plan _ a May 2005 veces is sweet] nts oe oe Prepgredtby:LandGrsphi ve ne cee afer ee Loo Lot 9 Residential Apartments January 2008 Settlers Cove DA Prepared by: DBI Architects DERM Concurrence Conditions of Approval The following conditions are to be placed on the final decision notice which pertain to fulfilling the requirements of the Koala Plan for committed development in a Koala Conservation Area. - . 1. Development mus! be wholly contained within the portion of the lot designated for development. Building envelopes and associated infrastructure must be placed in the location as shown on the Settlers Cove Master Plan and in accordance with the plans listed above. Clearing of Koala Habitat Trees 2. No koala habitat trees on the subject site will be removed or disturbed as a consequence of the operational works except for those identified within the building envelopes as outlined in the Fauna Management Plan (May 2005). The clearing of koala habitat trees on the subject site must be undertaken in accordance with sections 15 and 16 of the Koala Plan. Koala habital trees are defined in the Nature Conservation (Koala) Conservation Plan 2006, They include tree species of the Angophora, Corymbia, Eucalyptus, Lophostemon and Melaleuca genera, and have a height of more than 4m or 2 trunk with a diameter of more than 10cm at 1.3m above the ground. t 3. Rehabilitation of koala habitat is to be underlaken in accordance with the Koala Plan. The proposed Revegetation Plans are to be submitted to the DERM and Sunshine Coast Regional Council six (6) months prior to the commencement of operational works. 8) The location of the rehabilitation site should be based on its ability to provide connectivity to other areas of bushiand and/or providing for improved koala movement across the site. b) Plant species assemblage, density and distribution including the understorey should resemble the surrounding regional ecosystem. Cc) All koala habitat tree species are to be denved from local seed stock d) Suitable protective measures are required to be installed around the renabilltation area(s) at the time of planting and remain in ptace until the maintenance period has finished. Page 2 of $+ AFOS0109 Department of Environment and Resource Management Page 20 of 25 ‘ re
Page 21
2008/175
Page 21 of 25
[OCR of page images]
2008/175
7g + 9 . = "et 7
’ : ~ _¢ t :
ecoaccess . ere we:
' environmental (corices and permits . eee = 7
Sg Do . ee Notice .
EM ee tae" ' Concurrence Agency Response
: . : , ‘ « . :
—o™ ° 38) All revegetation must be compleie3 within one (1) year of the date’ an operational; works approval
” is issued by Sunshine Coast Regional Council
. ts af Maintenance of all completed revegetation is fo be undertaken by the Saplicant over. a period of
. . two (2) years, commencing from the date revegetation is completed. Maintenance. actions are to
+, eddress the following: .
_ js ® " -# Stabilisation of soil structure; tg
oe + replacement of dead or diseased ree. plantings:
a ‘ * reguiar watering, “taking into Consideration’ currant water. Festictions; and
. * removaland management of nxious nae and eAvirofiniental weed species. ”
. , ao
tae 7 wi Mee te. -9 (Mae y
Landscaping a! 4 S on oye ,
4. Landscaping of the subject site is to. be underiaker | in sccbvdants with the Koala Plan {at least 70% * > ai
boat - ye Australian planis, of-which 50% are;native to. area, including koala:habitet trees, native, to the area). Thi i
+ _* | proposed Landscape Plans are to be Submitted: tothe DERM; ‘ane Sunshine Coast Regional Council six t /
‘ (6) months” peor to the commencement of operational works, ~ ree
Construction in a Koala Habitat Area” eh ef “pl
-4g “5. Clearing and construction on the subject sit must bé limited to'the hours between Gam and 6pm ate
“a 26. During construction. the driving and parking of vehicles, as weil as Stockpiling of Soil and other
: . materials, must be carried out away from the foot zone OF frees to be retained.
Te ge 7. “The applicant shall ensure:thal all employees, contractors, “subcontractors, agents or any other person
engaged or employed to carry out building works under this Development Permit comply at all times
. * with the requirements of this Development Permit and do not clear any vegetation that is not approved
' + >. tobe cleared-under,this Development Permit or in.a. manner that is inconsistent with it
‘ “> 8! The applicant shalt notify the ‘Department of Erivironment arid Resource Management (DERM)
Customer Service Centre on phone (07) 3227 8185 or email at koala [email protected] cov au at least 5
business days prior to the commencement of any clearing of koala habitat trees on the subject site of
the date clearing is to commence and the koala spotter to be used. ae
9. Domestic dogs are not permitted on the site during construction,
Traffic .
: 10. Traffic entering and exiting the site should be kept to a minimum between the nours of 6pm and fam.
: _+ . 11. Signage depicting a koala and a maximum speed limit of 20kmih should be erected at the entrance to
oo. te the site to inform vis visitors that Koolps may se present onthe site. “ty * og e
Le
-f i ‘ 12. Traffic calming: devices” thust te instalted™along:the smains; Enirance! and: internal roads where ‘they ofa *
. oe al aa with, ot are drecty adigcent to koala movement corridors on mi the site . . .
ar it ~ “ ee so
. . “of 1
* Lighting .
43. Artificial lighting on the subject site must be opefated to ensure it is directed away from adjacent
conservation areas and other fauna corridors to minimise impacts to koalas and other wildlife inhabiting
or moving through the site. .
Education
14. The applicant is required to develop educational material for the intended use by residents and guests
to raise awarenass of the sites koala habitat values and ‘koala sensitive’ design aspects of the
development
* . ,
. “
. . »
* . .
* ' .
“e- rr Fe orn = =
+ Page JofS$-arogorog Ty wy * Department of Environment and Resource Management
< . a
Page 21 of 25
Page 22
2008/175 Page 22 of 25 [OCR of page images] 2008/175 ecoaccess eran ACERCES and DANS Notice Concurrence Agency Response Definitions s . “Koala exclusion fencing” means a fence that is made of materials that a koala cannot easily grip, including, for example tin panels and has 2 gap of less than 10cm between the ground and appropriate fencing material, Nearby trees and shrubs should be at least 3m away from the exclusion fencing “Koala friendly fencing” is defined as a fence that a. allows koalas to easily climb through or over the fence by choosing materials such as post and rail and leaving at least a 30cm gap between ground level and the first rail or strand; or » b. Provide a means for koalas to get over a fence that cannot be easily climbed by: i. installing a timber post leaning against the fence at a 45 degree angle on either side; ii. planting vegetation within close proximity on either side of the fence to provide a natural ladder; iii, instatiing planks or panels horizontally along the top of the fence to provide-a walkway; and iv. building the fence around existing trees and vegetation, -~ ~~ “Subject site” refers to Lot 9 of Lot 603 on SP188270. =: Ser Advice to Applicant and Council The clearing of koala habital trees must be undertaken in accordance with sections 15 and 16 of the Nature Conservation (Koala) Conservation Plan 2006*and Management Plan 2006-2016. The applicant shall notify the Department of Environment and Resource Management (DERM) Customer Service Centre on phone (07) 3227 8185 of email at koala plan@epa gid gov au at least S business days prior to the commencement of any clearing of koala habitat trees on the subject site of the date clearing is to commence and the koala spotter to-be used. Koalas that are identified on the site during construction are not to be captured and relocated. Translocation is prohibited under the Nature Conservation Act 1992. Should a koala be found sick or injured the fauna spotter must either take it to the nearest treatment facility or contact the DERM hotline on 1300 130 372. The above DERM concurrence conditions are the full responsibility of the applicant and new landholders. The DERM recommends that Sunshine Coast Regional Council place a notation on the proposed allotments. which alerts potential landowners when conducting a property search to the development conditions on the property, in particular, koala sensitive dog ownership. Assessment Manager Responsibilities Please note that It is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997 that a copy of the final Decision Notice (which includes the DERM's concurrence response) for this appiication issued by Sunshine Coast Regional Council, be forwarded to each referral agency. Therefore could you please send a signed hardcopy to the DERM’s Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST 4002 ang an electronic copy to eco.access(@epa gid gov.au. Page 4 of 5» AFO80103 Department of Environment and Resource Page 22 of 25
Page 23
2008/175
Page 23 of 25
[OCR of page images]
2008/175
ecoaccess
arwronmenial ieances and perms
Concurrence Agency Response
ay
a, .
lf you require more information, please contact Brett Manning, the Projet Manager, 04 the telephone
number listed below.
a5
ta ‘
Yours sincerely
Enquiries:
Brett Manning
. Koala Conservation Unit 4
meet kD Threatened Species . vad
= Sustainable. Communities a
wee Pv no eens Envvronsnigr Bs Resoude mane
ou
evel 8, 160 Ann Street *
ores atot4bo2 +a
‘Phone: (07) 3227'8487,
Fax: (07) 3227 6386
* Email:[email protected]
vike
6Aprii2009, .
Y.
=
Page 23 of 25
Page 24
2008/175
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
4.1.27.(1) An applicant for a development application Appeals by advice agency submitters
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development
development approval for a development application
application;
if-
(b) a matter stated in a development approval,
(a) the development application involves impact
including any condition applying to the
assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a
application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period;
days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant.
4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
(3) If a person withdraws a submission before the scheme.
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
(4) If an application involves both impact against a deemed refusal of the request.
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the
(no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
a. (a) a notice giving a decision on a request to change
1
or cancel a condition of a development approval.
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 24 of 25
Page 25
2008/175
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
a.
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 25 of 25
Used in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 579 KB (small file)
- File type