Decision Notice [As Published] · 132008.175

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                          2008/175



         MATERIALS ON-SITE                  DESTINATION
                                            Re-use and Recycling                      Disposal
         Expected     waste    Estimated    On-site            Off-site               *specify
         materials             volume       *specify proposed *specify                contractor    and
                               (m³)         re-use or on-site contractor      and     landfill site or
                                            recycling          recycling outlet       other     disposal
                                            methods                                   site
          Excavation
          material
          Green waste
          Bricks
          Concrete
          Timber-please
          specify
          Plasterboard
          Metals - please
          specify
          Asbestos
          Other - please
          specify
        Note * If a demolition contractor is undertaking works, then the Waste Management table is to
        be completed by the demolition contractor.
         The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
         effective reuse and recycling of such materials. Additionally Council rewards those who
         segregate waste by significantly reducing disposal fees at the landfill some items are free.
         Higher gate fees are charged for loads of mixed waste.
Noise
76.     Noise emission from mechanical equipment shall comply with the following requirements:
        76.1.   Air-conditioning and Refrigeration
                 7am to 10pm: Maximum background + 5dB(A)
                 10pm to 7am: Maximum background + 3dB(A)
        76.2.   Pumps
                 7am to 7pm: Maximum background + 5dB(A)
                 7pm to 10pm: Maximum background + 3dB(A)
                 10pm to 7am: No audible noise.
77.     Written certification from a suitably qualified person shall be submitted confirming that the
        noise levels from all mechanical equipment comply when measured at either the residential
        boundary or outside the most exposed part of an affected building, whichever is the closest to
        the equipment.
        The assessment and certification is required immediately after installation of the equipment
        and prior to any occupation of the building, and in a format approved by Council. All
        equipment should be operating at the same time to test the overall noise level created.
        NOTE: It is highly recommended that the person you engage to certify the installation is
        involved at the plan development stage so they can recommend where this equipment is best
        located. They can also advise about noise enclosures and can make other suggestions to
        avoid noise problems. It is a lot more costly to try to deal with noise problems after everything
        is built.


                                                                                      Page 11 of 25

Used in these records

About this file

File size
579 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice [As Published].pdf · 579 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.