Skip to the record
For the highest quality transcripts.

Council archive · source document

Decision Notice [As Published] · 132008.175

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

    2008/175




Page 17 of 25


[OCR of page images]
2008/175

 

Schedule A — Glossary
Cleanng, for vegetation

*® means remove, cut down, ringbark, push over, poison or destroy in any way
including by burning, flooding or draining, but

eS NOt I ide Gest ig Slant Qe lation

   

Cleanng as a result of the MCU includes
© cleanng of assessable vegetation that will result from the change in use,
consisting of any of the following
~ clearing for infrastructure—including buildings, stormwater management
systems, water supply and sewerage systems—that are proposed as part
of the MCU application
=  cleanng for roads, vehicle parking, vehicle and pedestnan access, utilites
corndors, services, fences, firebreaks and fire management lines that are
proposed as part of the MCU application
= clearing that may not be necessary for developing infrastructure but is
associated with the use applied for
And
* clearing of assessable vegetation that will become exempt if the development
application is approved This includes any of the following examples
= Clearing for routine management and essential management purposes
associated with the approved development including cleanng to maintain
proposed infrastructure, facilities, roads, access routes, utilties, services
and fences, and cleanng to maintain the safety of persons and property
that will be associated with the development
— clearing for necessary fire breaks and fire management lines associated
with the development This will be assessed as follows
1 all built infrastructure other than underground services, roads and
fences will be assessed as requinng clearing for firebreaks with a
width of 15 times the height of the tallest vegetation adjacent to the
infrastructure, or 20m, whichever is the greater However, evidence
may be provided to NRW that confirms that an alternative firebreak
width is required that is consistent with the State Planning Policy
(SPP) 1/03 Guideline
i all proposed allotment boundanes will be assessed as requiring
clearing for fire management lines with a width of 10m constructed
on either side of the allotment boundary, unless NRW is provided
with evidence that confirms that an alternative width of fire
management line 1s required or an alternative configuration of fire
management lines are required that is consistent with the SPP 1/03
Guideline
m in the case of evidence being presented that demonstrates
alternative fire management guidelines as being sufficient and
consistent with the SPP 1/03, NRW may condition the development
so that the full extent of exempt cleaning prescnbed for essential
management under Schedule 8 of the IPA cannot be cared out by
current or future landholders
— where there is a concurrent application for Reconfigunng of a Lot (RaL)
for the same land that has not yet been decided—clearing as a result of
the RaL as set out in the Ral Policy item 2 will be assessed
Endangered Regional Ecosystem means a regional ecosystem that is prescribed
under a regulaton and has either—
(a) less than 10% of its pre-clearing extent remaining; or

Department of Natural Resources and Water COSO8NAMO0001 Page 3 of 4

Page 17 of 25

Used in these records

About this file

File size
579 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice [As Published].pdf · 579 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.