07/2450 - Approved Plans [As Published] · 142007.2450
Plans and drawings: the text below has words only, no drawings.
NEW STORMWATAR MANHOLE FOR
FUTURE CONNEQTION, REFER
HYDRAULICS DOCUMENTATION
CUT AWAY EXISTING BACK OF KERB AND CONSTRUCT NEW
CHANNEL TO FORM SPOON DRAIN TO CHANNEL STORMWATER PAST ACCESS — REFER DEAL.
NEW KERB ONLY TO ACCESS DRIVEWAY
KERB RETURNS WITH FOOTPATH VERGE
BEHIND GRADED AT +3% AND JOINED NEATLY WITH
EXISTING SURFACE — TURF FINISHED
m
NEW BASEMENT CARPARK ACCESS
REFER OPW PLANS FOR BUILDING
NEW KEEP LEFT SIGN FIXED TO
NEW SPLITTER ISLAND NOSE INFRONT OF
ONTROT PAN
DAVID LOW WAY
2m WIDE FOOTPATH ACROSS DRIVEWAY
THRESHOLD TO BE COLOURED CONCRETE
TO HIGHLIGHT PEDESTRIAN WAY
OKEN| LINES
CESS |DRIVEWAY
\ 35 |
| |
NEW COLOUR IMPREGNATED ISLAND INFILL
BROOM FINISHED TO MATCH EXISTING
ISLAND INFILLS IN DAVID LOW WAY
PRAM CROSSING TO NSC STANDARD
FFL.6.740
| Fs06.740
EXISTING KERB GULLY PIT JOBE MODIFIED WITH NEW
900x600 HEAVY DUTY GAWANISED
CENTRE MEDAN WORKS BY Fr Lait GRATED LID 'V' SHAPEQ/TO SUIT SPOON DRAN PROFILE
NOOSA SHIRE] COUNCIL
hes
|
EXISTING CROSSOVER TO BE REMOVED AND KERB UPSTAND
CONSTRUCTED TO COUNCIL STANDARDS TO MATCH EXISTING
LINEMARKING TO BE UPGRADED TO PROVIDE NEW EXCLUSIVE BIKEWAY GREEN ZONE (1.5 WIDE)
ADJACENT TO THE SUBJECT SITE TO COUNCIL STANDARDS BETWEEN KERB & EXISTING EDGE LINE
SECTION OF EXISTING WHITE EDGE LINE NEAR ROUNDABOUT TO BE REMOVED AND RELOGAT
KRB
EXISTING OVERHEAD POWER LINES TO BE
RELOCATED UNDERGROUND AND POLES TO BE REMOVED
DESIGN AND DOCUMENTATION BY OTHERS
FILE CoPY
TO NEIGHBOURING FOOTPATH
‘a Lu
is a
a | 7 ——— | eee Ss
: LEGEND !
wo fe
: = EXISTING SEWER TO REFER HYDRAULICS Li
CONSULTANT FOR DETAILS ae
anna EXISTING ELECTRICAL LINE a Y a
tis
T ———————_ pvIsTING TELSTRA UNE C
———- EXISTING WATER MAIN = i | ZZ
ee ee egg oe PROVIDE SMOOTH TRANSITION
iC
EXISTING SITE SPOT LEVELS REINSTATE & MAKE GOOD ANY DAMAGE\)
+ KERB & CHANNEL DIMINISH INTO
PEDESTRIAN CROBSING REMOVE EXISTING
CROSSOVER
_ EXISTING SITE CONTOURS
EXISTING SEWER
340 PROPOSED FINISHED BASEMENT
FFL7 MANHOLE. RAISE
@SL7 340 — AS REQUIRED
HANDRAIL ADJACENT — . NEW RAIBED SHARED ZONE
LENGTH OF RAMP PEDESTRIAN CROSSING CONSTRUCTED
RAMP UP TO
BUILDING LEVEL
FFL 6.000 5
FSL 6.000
* INSLXA
SMUOM 4
| NEW SPLITIER
| ISLAND AND
; LANDSCAPING BY
EXISTING OVERHEA\
EARNER e Be eS eee elena eee ee eee eee mrt ene aren re ses
RELOCATED
UND AND POLES TO BE REMQ = : Lh —— OO UCN z
EXISTING TELSTRA PIT LID LVEL
RAISED AND PROFILED TO SUIT
NEW PATH TO THE APPROVAL OF ce : : a tee pase sah theres lerabersameriiin ee)
TELSTRA ee ee
NEW BARRIER KERB AND CHANNEL =
AND PRAM CROSSING TO DETAIL
SMOOTH TRANSITION TO
EXISTING KERB ALIGNMEN
AND LEVEL
(DASHED) REMOVE WHERE
REQUIRED
NEW SW INLET AND
PIPE BY N.S.C.
HERON ST REPROFILE BY N.S.C]
(DEEP LIFT ASPRALT)
Sy ane een e eee ae
N.S.C,
W-) EXISTING SEWER
Y MANHOLE
VA
jens
Se
HERON ST REPROFILE BY N.S.C,
(DEEP LIFT ASPHALT)
NEW MOUNTABLE KERB TO CREATE NEW
KERB RETURN ISLAND
RETURN KERBING AND
DIMINISH INTO
PEDESTRIAN RAMPING
NEW RAISED SHARED ZONE
PEDESTRIAN CROSSING CONSTRUCTED
TO DETAIL The design ond associated details contained on this and associated drawings are
DO NOT SCALE FROM THIS DRAWING
copyright and are not to be used or reproduced without the written permission of
SCG Consulting Engineers.
| i Pe oaee
SELECT 2m WIDE REFUGE
NOTE:— ALL FOOTPATHS TO BE CONSTRUCTED TO ENSURE NON-SLIP SURFACE FINISH
AND EVEN GRADED SURFACE AND TRANSITION TO EXISTING
EXTERNAL WORKS PLAN
Scale 1: 150
Pst ek
EE eT ae ee [PREPS AS RASS AAT:
' ' =
I 1
SS ee iE Paee| one | vesero i
' ' I , \ AMENDMENTS:
RE-CONFIGURATION WORKS || | a
T \ .
i THIS Sie BY Mice COUNCIL itn eee CONSTRUCTION
Hl | | | { | | DEBUILD T/A
i! | BAR CONSULTING ENGINEERS
i ee Structural - civil - geotechnical
(eee eee eS eee eee Ses mecerer rece Sac sewse pou g pop opal ABN 40 098 481 899 ‘ ;
18 DUKE STREET SUNSHINE BEACH QLD.4567
NOOSA SHIRE COUNCIL Ph (07) 5447 5544 Fax (07) 5447 2634
DEVELOPMENT PERMIT OPERATIONAL WORKS No. Title:
IDES Yosscnneaseonsnneoaey . DATE :
a DAT CONSTRUCTED EXTERNAL WORKS
AMERO ORD BY... .ccsssavesveconces DATES.
RECOMMENDED FOR APPROVAL seal
roject
CUMS Cc MAY THE PLAN @
Moss Ge SErAreb. FROM WaTHOUt TH PEREGIAN BOARDWALK
APPROVAL of the MANAGER LAI EVELOPMENT
ce | 6 Heron St, PEREGIAN
PLANS APP
DATE ..22)...4...)..2227 MANAGER LAND DEVELOPMENT Date:
duly 06 | Scale: 1:150 | Drawn: 66.
Org No. 15406-EW1
Rev.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2450 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.