Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.4.4.2 GENERIC NODE

        A generic treatment node was used for the proposed treatment system for the Aged Care Facility. The following
        treatment efficiencies were modelled.

                     Table 4-3:     Generic Node Treatment Removal Efficiency (Aged Care Facility)
                                                           Treatment Removal
                                            Pollutant
                                                               Efficiency
                                          TSS                     90%
                                          TP                      60%
                                          TN                      45%
                                          GP                      90%

        The future proposed stormwater quality treatment system for the Aged Care Facility must achieve this pollutant
        removal efficiency or greater. This is to be demonstrated in future Development Applications for the Aged Care
        Facility.

4.4.4.3 POND NODE

A separate MUSIC model was configured, including the WCQP to determine Hydraulic Residence Time (HRT), which is
an important feature of the pond required for avoiding outbreaks of algae (as discussed below). Table 4-4 indicates the
pond node configuration adopted in MUSIC. Further details of the WQCP are indicated on the Drawing No. 16-001014-
402 in Appendix G.

                                          Table 4-4:    Pond Node Configuration

                                         Pond Parameter                Central Basin
                                  Surface Area (m²)                        1,940
                                  Extended Detention Depth (m)              0.40
                                  Permanent Pool Volume (m³)               1,840
                                  Notional Detention Time (hrs)             48.4
                                  Equivalent Pipe Diameter (mm)              55

        Since the Issue A report only the permanent pool volume has been changed from 1,845m2 to 1,840m2. As this is
        such a minor change the previous HRT analysis of the pond is considered to be still applicable (i.e. no update to
        the modelling is required).

Hydraulic Residence Time/Turnover Period

An important factor in determining pond sustainability is the turnover period, or Hydraulic Residence Time (HRT). Ponds
with high residence times are considered to be at risk of algal bloom and poor water quality.

Water By Design’s Urban Lakes Discussion Paper-Managing the Risk of Cyanobacterial Blooms dated Febuary 2012
recommends 10 to 15 days Hydraulic Residence Time for a lake. Other Queensland publication recommend 20 days
maximum hydraulic retention time. As such, we have recommended a Performance Indicator of a maximum Hydraulic
Residence Time of 15 days for the Central Basin / WQCP.

Using a simplistic approach as detailed in WSUD Engineering Principles – Stormwater (2005), the 20th percentile
Hydraulic Residence Time of 12 days was determined over a 30-year period (1973-2003) based on available data. Refer
to Table 4-5 below.




16-001014-01B | STORMWATER MANAGEMENT PLAN                        COOROY RETIREMENT COMMUNITY, TRADING POST
(SWMP) | PALM LAKE RESORTS                                                                    ROAD, COOROY            | 20
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.