Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn5 WATERWAY STABILITY MANAGEMENT The SPP 2014 waterway stability requires the limiting of the 63% AEP post-development peak flows within the receiving waters to be below a minimum of pre-development peak flows. Section 3.2.6 of this report includes analysis of peak flows for a 63% AEP rainfall event in which developed peak flows have been mitigated back to existing conditions in all recurrence intervals. Therefore, the waterway stability management objectives has been met. 16-001014-01B | STORMWATER MANAGEMENT PLAN COOROY RETIREMENT COMMUNITY, TRADING POST (SWMP) | PALM LAKE RESORTS ROAD, COOROY | 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.