Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTABLES
Table 1-1: Approved Bioretention Basin Sizing ........................................................................ 1
Table 1-2: Summary of Responses to Approval Conditions Relating to Stormwater
Management ........................................................................................................ 3
Table 3-1: Existing Scenario Catchment Details ................................................................... 7
Table 3-2: XP-RAFTS Calibration Parameter Summary ....................................................... 8
Table 3-3: Existing Peak Flow Results .................................................................................. 8
Table 3-4: Existing Peak Flow Comparison at Discharge Location B ................................... 9
Table 3-5: Developed Mitigated Scenario Catchment Details ............................................... 9
Table 3-6: Stormwater Detention Basin Concept Details .................................................... 11
Table 3-7: Northern Basin Stage Storage Discharge Relationship ..................................... 11
Table 3-8: Central Basin Stage Storage Discharge Relationship ........................................ 12
Table 3-9: Developed Mitigated Scenario Peak Flow Comparison ..................................... 12
Table 3-10: Developed Mitigated Scenario Basin Water Surface Levels .............................. 13
Table 3-11: Extreme Storm Event Weir Assessment ............................................................ 13
Table 4-1: Load Reduction Water Quality Objectives .......................................................... 15
Table 4-2: Bioretention Basin Modelled Parameters ........................................................... 19
Table 4-3: Generic Node Treatment Removal Efficiency (Aged Care Facility) ................... 20
Table 4-4: Pond Node Configuration ................................................................................... 20
Table 4-5: 20th Percentile Hydraulic Residence Time Results (Simplistic Approach).......... 21
Table 4-6: MUSIC Modelling Results .................................................................................. 21
FIGURES
Figure 2-1: Approximate Location of Site (Source: UBD 2006) .............................................. 5
APPENDICES
APPENDIX A CONCEPT MASTERPLAN LAYOUT
APPENDIX B RATIONAL METHOD CALCULATION
APPENDIX C DETENTION BASIN CALCULATIONS
APPENDIX D XP-RAFTS LAYOUT SUMMARY
APPENDIX E STORMWATER DESIGN CALCULATIONS
APPENDIX F MUSIC MODELLING DETAILS
APPENDIX G CONCEPT DRAWINGS
APPENDIX H OPERATIONAL WORKS DRAWINGS
APPENDIX I COUNCIL CORRESPONDENCE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.