Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
WQCP ‐ Energy Dissipater Calculations (Derived From QUDM, 2013)
Pipe Outlets

Sizing of the scour rock protection for pipes was determined using calculations specified in Section
8.7 of QUDM, 2013. Below indicates rock protection requirements and the adopted outlet rock
protection configuration at each pipe outlet.




                                           Central Bioretention Basin   South Discharge into   Central Pond Outlet into
Location
                                            Outflow into Pond (375)      Central Pond (900)      Existing Swale (825)
Q (m3/s)                                             0.23                      1.275                     2.2
Area (m2)                                             0.1                       0.6                      0.5
Outlet Velocity (m/s)                                  2                        2.0                      4.1
Pipe Diameter                                        0.375                      0.9                     0.825
Multiple Cells?                                       NO                        NO                       NO
Multiplication Factor for Multiple Cells             N/A                       N/A                      N/A
Length Ratio D:L                                       3                         3                        5
Width (m)                                             1.4                       2.6                      3.1
Length (m)                                           1.125                      2.7                     4.125
d50 (mm)                                              200                       200                      300
Thickness of Rock Protection (mm)                     400                       400                      600
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.