Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Source Node Input
      Sub-Catchment              Area (ha)   Impervious Percent    Pervious Percent        Surface Type
         A1 Road                   0.265             80                   20               Urban_Road
         A1 Roof                   0.495            100                   0                Urban_Roof
        A1 Ground                  0.225             50                   50              Urban_Ground
         A2 Road                   0.300             80                   20               Urban_Road
         A2 Roof                   0.641            100                   0                Urban_Roof
        A2 Ground                  0.421             50                   50              Urban_Ground
         A2 Park                   0.146             0                   100              Urban_Ground
       EXT B1 Road                 0.372            100                   0                Urban_Road
      EXT B1 Ground                1.760             0                   100              Urban_Ground
         B2 Road                   0.648             80                   20               Urban_Road
         B2 Roof                   1.011            100                   0                Urban_Roof
        B2 Ground                  0.724             50                   50              Urban_Ground
         B3 Road                   0.594             80                   20               Urban_Road
         B3 Roof                   0.925            100                   0                Urban_Roof
        B3 Ground                  0.541             50                   50              Urban_Ground
         B4 Roof                   0.300            100                   0              Commercial_Roof
        B4 Ground                  0.100             50                   50            Commercial_Ground
         B4 Park                   0.649             10                   90              Urban_Ground
       EXT C1 Road                 0.342             80                   20               Urban_Road
      EXT C1 Ground                0.975             20                   80              Urban_Ground
         C2 Road                   0.308             80                   20             Commercial_Road
         C2 Roof                   1.065            100                   0              Commercial_Roof
        C2 Ground                  0.651             50                   50            Commercial_Ground
         C3 Road                   0.750             80                   20               Urban_Road
         C3 Roof                   1.398            100                   0                Urban_Roof
        C3 Ground                  0.781             50                   50              Urban_Ground
         D2 Road                   0.249             80                   20               Urban_Road
         D2 Roof                   0.369            100                   0                Urban_Roof
        D2 Ground                  0.433             50                   50              Urban_Ground
        D2 Car Park                0.200            100                   0                Urban_Road
         D3 ROAD                   0.174             80                   20               Urban_Road
         D3 ROOF                   0.291            100                   0                Urban_Roof
       D3 GROUND                   0.090             50                   50              Urban_Ground
   D3 GROUND BYPASS                0.026             0                   100              Urban_Ground
           Total                  18.217              -                    -                     -




Results
                                                Source                Residual             Reduction
Flow (ML/yr)                                                 214                  211                   1.2
Total Suspended Solids (kg/yr)                             36300                 7780                  78.6
Total Phosphorus (kg/yr)                                    76.8                 23.4                  69.6
Total Nitrogen (kg/yr)                                       480                  239                  50.2
Gross Pollutants (kg/yr)                                    4620                  249                  94.6


[OCR of page images]
ce Node Input

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-Catchment Area (ha) Impervious Percent Pervious Percent Surface Type
A1 Road 0.265 80 20 Urban_Road
Al Roof 0.495 100 0 Urban_Roof

Al Ground 0.225 50 50 Urban_Ground
A2 Road 0.300 80 20 Urban_Road
A2 Roof 0.641 100 0 Urban_Roof

A2 Ground 0.421 50 50 Urban_Ground
A2 Park 0.146 0 100 Urban_Ground

EXT B1 Road 0.372 100 0 Urban_Road

EXT B1 Ground 1.760 0 100 Urban_Ground
B2 Road 0.648 80 20 Urban_Road
B2 Roof 1.011 100 0 Urban_Roof

B2 Ground 0.724 50 50 Urban_Ground
B3 Road 0.594 80 20 Urban_Road
B3 Roof 0.925 100 0 Urban_Roof

B3 Ground 0.541 50 50 Urban_Ground
B4 Roof 0.300 100 0 Commercial_Roof

B4 Ground 0.100 50 50 Commercial_Ground
B4 Park 0.649 10 90 Urban_Ground

EXT C1 Road 0.342 80 20 Urban_Road

EXT C1 Ground 0.975 20 80 Urban_Ground
C2 Road 0.308 80 20 Commercial_Road
C2 Roof 1.065 100 0 Commercial_Roof

C2 Ground 0.651 50 50 Commercial_Ground
C3 Road 0.750 80 20 Urban_Road
C3 Roof 1.398 100 0 Urban_Roof

C3 Ground 0.781 50 50 Urban_Ground
D2 Road 0.249 80 20 Urban_Road
D2 Roof 0.369 100 0 Urban_Roof

D2 Ground 0.433 50 50 Urban_Ground

D2 Car Park 0.200 100 0 Urban_Road
D3 ROAD 0.174 80 20 Urban_Road
D3 ROOF 0.291 100 0 Urban_Roof

D3 GROUND 0.090 50 50 Urban_Ground

D3 GROUND BYPASS 0.026 0 100 Urban_Ground
Total 18.217 a a S

 

 

 

 

 

 

 

Residual Reduction

Flow (ML/yr)

Total Suspended Solids (
Total Phosphorus (kg/yr)
Total Nitrogen r

 

Gross Pollutants (kg/yr.
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.