Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
South Bioretention Basin
Critical Section
CROSS SECTION DETAILS                                                         10% AEP                           1% AEP
     POINT       CH                    Z            n              wA           wP       n x wA        wA         wP        n x wA




                   1         ‐11.2     101.2     0.060
                   2         ‐11.2       101     0.060
                   3           ‐10     100.7     0.060             0.11           0.95    0.01        0.14          1.11     0.01
                   4            10     100.7     0.060             4.62          20.00    0.28        5.37          20.00    0.32
                   5            12     101.2     0.060             0.11           0.95    0.01        0.14          1.11     0.01




                                                                  wA       wP     n x wA     wA       wP     n x wA
                                               TOTAL           4.833444 21.90487 0.290007 5.658369 22.21411 0.339502
                            S
                          0.005                                    R               n       Q            R             n       Q
                                                               0.220656          0.060    2.08       0.25472        0.060    2.68
                                                      Flow                        2.08                               2.68

                                                     WSL                       100.931                          100.9685

                       Calculated by Manning's Equation                           2.08                              2.68
                                               Vel (m/s)                          0.43                              0.47

                                                             Basin Section
                                                               101.4


                                                               101.2


                                                                   101
  Height (m AHD)




                                                               100.8


                                                               100.6


                                                               100.4


                                                               100.2


                                                                   100
      -15                   -10                -5                         0               5                    10              15
                                                                   Width (m)

                                               Existing Sur face              10 % AEP     1% A EP



As indicated in the results above, velocity is below 0.5m/s during both the major and minor storm
events. The potential for scour or damage to vegetation is therefore low and below requirements
specified in WSUD Technical Design Guidelines (2006)
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.