Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
RETAINING WALL
(SLEEPERS)
ACCESS GATE FOR 7
22 MAINTENANCE
+--+ --—-- —.,
p=
DRAWINGS FOR ROAD AND
REFER TO STAGE 1A
OPERATIONAL WORKS
DRAINAGE LAYOUT
GROSS POLLUTANT
TRAP (GPT)
1.
CENTRAL BIORETENTION BASIN SPECIFICATIONS
SERERAL BIURE TENTION BASIN SPECIICA TIONS.
FILTER MEDIA AREA: 650.25m‘
* /|BIORETENTION BASIN
CENTRAL
F
i ee
NO PONDING (i.e. DEPRESSIONS OR
MOUNDS) THAT WOULD PROHIBIT
FISH HOVERENT BETWEEN ZONES
1
“gn WATER QUALITY CONTROL POND)
(INCLUDING DETENTION STORAGE)
i
om Nenigen WALL
AND SPA
Cc
PERMANENT SIGNAGE 3.
FOR BIORETENTION BASIN
(REFER TO NOTE 11) 4
CLUB HOUSE
ene
om SAFETY
: Ry F FENCE
™\
NTRAL B
RETAINING WALL
(SLEEPERS)
BOWLING a
5
SIGNAGE TO BE ERECTED
AROUND POND AND OUTDOOR
BBQ AREAS TO DISCOURAGE
FEEDING OF BIRDS
ANY SOFT CLAYS TO DEPTHS OF APPROXIMATELY 0.3m IS REQUIRED.
THE STRIPPED SURFACE AND EMBANKMENT FOUNDATION IS TO BE INSPECTED AND TESTED BY A GEOTECHNICAL
ENGINEER.
SUBJECT TO THE GEOTECHNICAL ENGINEER INSPECTION EXCAVATION OF A CUTOFF KEY ALONG THE NEW
EMBANKMENT CENTRELINE AT LEAST 0.5m - 1.0m INTO THE FOUNDATION MATERIALS SHALL BE REQUIRED.
POND TO BE LINED WITH IMPERVIOUS SURFACE, ie: CLAY OR OTHER APPROVED MATERIAL, i.e. BELOW NOL RL
99.20.
ROCK RETAINING WALL
10m OVERFLOW WEIR
RL 100.90
cone
FOR THE ENTIRE NEW EMBANKMENT AREA STRIPPING OF VEGETATION AND ANY HIGHLY ORGANIC TOP SOILS AND
sta POND) SPECIFICATIONS
NORMAL OPERATING LEVEL: RL 99.20
NORMAL OPERATING AREA: 1,940m?
PERMANENT PONDED VOLUME: 1,840m?
TEMPORARY PONDING SURFACE LEVEL: RL 99.60
EXTENDED DETENTION DEPTH: 400mm
DEEP WATER ZONE SURFACE AREA: 1,495m?
MACROPHYTE PLANTING AREA: 443m?
NOTIONAL DETENTION TIME: 48.4 hrs
EQUIVALENT PIPE DIAMETER: 55mm
Pera wns
———
CARPARK DESIGN TO BE 7
CONFIRMED DURING
DETAILED DESIGN mise) /
3
7
DESIGN SURFACE CONTOUR
{0.2m INTERVALS)
“TTT TTT” BATTERS (GRADE AS SPECIFIED)
PROPOSED BOULDER RETAINING WALL
PROPOSED SLEEPER RETAINING WALL
PROPOSED FENCE
EXISTING STORMWATER PIPE
PROPOSED STORMWATER PIPE
FUTURE STORMWATER PIPE
© 100% SUBSOIL AND CLEANOUT PITS
SUBSOIL COLLECTOR
ROCK SCOUR PROTECTION
ae) ur
MACROPHYTE ZONE
REINFORCED TURF
MAINTENANCE ACCESS TRACK
(REINFORCED TURF)
THE CLAY FILLING FOR THE WETLAND SHOULD BE PLACED IN TWO HORIZONTAL LAYERS OF 150mm THICKNESS.
CLAY LINER SHOULD HAVE A MINIMUM THICKNESS OF 300mm AND COMPACTED TO A DENSITY RATIO WITHIN THE TES:
RANGE 98% - 102% STANDARD COMPACTION (AS 1289.5.1.1). PLACEMENT MOISTURE CONTENTS SHOULD BE
OPTIMUM MOISTURE CONTENT FOR STANDARD
WITHIN THE RANGE OMC - 1% TO OMC
COMPACTION).
+ 2% (WHERE OMC =
CLAY LINER SHOULD HAVE A MAXIMUM HYDRAULIC CONDUCTIVITY OF 1x10-? m/s.
NON-DISPERSIVE CLAYS ARE DESIRABLE.
1, REFER TO LANDSCAPE ARCHITECTS DRAWINGS FOR PLANTING
DETAILS.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH LATEST
ISSUE OF CALIBRE CONSULTING REPORT No. 16-001014-01.
TOPSOIL MUST BE TESTED BY N.A.T.A. ACCREDITED LABORATORY IN ACCORDANCE WITH A.S. 4419 (SOILS FOR
LANDSCAPING AND GARDEN USE) AND SHOULD BE PLACED TO A MINIMUM DEPTH OF 300mm.
TOPSOIL MAY BE TREATED WITH GYPSUM OR LIME.
3. REFER TO DRG No. 16-001014-403 TO 16-001014-406 FOR
BASIN SETOUT DATA.
2. FILTER DEPTH: 0.4m 10. TOPSOIL LAYER (OVER CLAY LAYER) REQUIRED FOR MACROPHYTE PLANTING AREAS.
3. EXTENDED DETENTION DEPTH: 0.3m 11. PERMANENT SIGNAGE TO READ: “BIORETENTION BASIN - THIS BIORETENTION BASIN REDUCES THE POLLUTION OF 4. REFER TO DRG No. 16-001014-400 FOR GENERAL NOTES AND
4, BASIN SURFACE LEVEL: 100.05m AHD OUR WATERWAYS BY REDUCING THE AMOUNT OF HEAVY METALS, LITTER, SUSPENDED SOLIDS, AND NUTRIENTS DETAILS.
DISCHARGED TO SIX MILE CREEK"
N.S.C. REF NO. MCU15/0111 & REC15/0031
pa AMEWOMENT DETALS eson concn vous Umm sesnoren"™ | SURVEYOR: ML_SURVEYS a cameo
re Cc 38 Leybourne Street, Chelmer QLD 4068 PALM LAKE WORKS PTY LTD CONSULT AUSTRALIA CENTRAL BASIN
E . M wu 2 0 2 4 6 8 1 “ Mob: 0412 744 223 E: [email protected] - LAYOUT PLAN
€ \ PROWCT Ha
is —— coo ne a oe PALM LAKE RESORT Calibre Se aa _—_
Ne cM = Telephone 07 3895 3444 Focsinle 07 3895 3400 enon 46-001014-403 A
sir FOR & ON’BEHALF OF CALIBRE CONSULTING (QLD) PTY LTD STAGE 2 CONSULTING ‘Wabane Canbere lobourne Syénny Singapore Sunsine Const Lie 4064 =" =
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.