Appendix E - Stormwater Management Plan

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
•        Stormwater Management Construction and Maintenance Plan (SMCMP) Report (No. B14158.W-06A dated
         November 2015);
•        Response to Information Request Letter No. B14158.W-11A dated 22 April 2016; and
•        Queries Clarification Letter (No. B14158.W.14 RFI.AMcP.lms Response to RFI.docx dated 6 June 2016) –
         Addressing Council Officer Cherie O’Sullivan’s further queries in email dated 27 May 2016.

Overall Site Layout - MCU Development Application
• Concept Stormwater Management Plan Report (No. B14158.W-03A dated November 2015);
• Concept Stormwater Management Construction and Maintenance Plan (Concept SMCMP) Report (No. B14158.W-
   09A dated January 2016)
• Response to Information Request Letter No. B14158.W.10A-Response to RFI.docx dated 5 February 2016.
• Outstanding Information Request Response Letter No. B14158.W.10LA.AMcP.ms.docx dated 21 April 2016.

Overall Site Layout – Stage 2 Operational Works Application
• Response to Stormwater Management Approval Conditions Letter (No. 16-001014.01L.ms.cm.docx dated 12
   September 2016) – provides a summary of responses to Council’s Approval Conditions regarding stormwater
   management.
• Stormwater Management Plan (SWMP) Report (No. 16-001014-01A dated September 2016) – provides details of
   the stormwater management strategy, detailed response to Council’s Approval Conditions, with corresponding
   analysis and investigations.
• Stormwater Management Construction & Maintenance Plan (SMCMP) Report (No. 16-001014-02A dated September
   2016) – provides design checklists, construction management and operation maintenance procedures for proposed
   stormwater devices.

The above reports have been considered in the latest analysis.



1.3           RESPONSE TO APPROVAL CONDITIONS
A summary of the responses to Council’s Approval Conditions relating to stormwater management are provided in
Table 1-1 below. Some responses have been addressed in other submissions, such as the SMCMP Report
(No. 16-001014-02B dated January 2017).

Table 1-2: Summary of Responses to Approval Conditions Relating to Stormwater Management
    Item      Brief Summary of Item                    Response to Item
    59        Adequate flood immunity maintained       Design of roadworks and drainage network throughout the site ensures
              during local and regional events.        adequate management of local flows. Refer to Roadworks and
                                                       Drainage Plans. Section 3.2.6 in this report indicates basin water
                                                       surface levels provide adequate freeboard to allotment levels.
                                                       Section 1.1 in this report provides details of regional flood levels below
                                                       developed lots.
    60        Site earthworks does not adversely       Section 1.1 in this report provides details of regional flood levels
              impact flood conditions on adjacent or    and site filling well outside of regional flood extents.
              downstream properties                    Furthermore, Section 3.2.6 indicates a reduction of peak flows back to
                                                       or below existing levels discharging from the site, which demonstrates
                                                       no adverse impact to flooding downstream.
    61        Design of stormwater drainage and        Stormwater drainage and basin detailed design drawings have been
              management devices to be certified by    certified by RPEQ. Refer to Drawing No. 16-001014-400 series for
              RPEQ specialising in hydraulics.         details.
    62        Minor Drainage System Capacity – 10%     Stage 2 Operational Works drainage has been designed accordingly.
              AEP storm, Major Drainage System         Refer to Stage 2 Operational Works Design Package for details. Future
              Capacity – 1% AEP storm                  stages will also be designed accordingly. Details are also provided in
                                                       Section 3.2.8 of this report.
    63        No adverse impact to downstream peak     Section 3.2.6 in this report demonstrates that proposed detention
              flows up to and including the 1% AEP     basins are adequate in reducing peak flows to meet this requirement.
              Storm



16-001014-01B | STORMWATER MANAGEMENT PLAN                          COOROY RETIREMENT COMMUNITY, TRADING POST
(SWMP) | PALM LAKE RESORTS                                                                      ROAD, COOROY                        |3
Log in to download the original file

Appendix E - Stormwater Management Plan.pdf · 13.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.