Original source · versioned page text
Appendix E - Stormwater Management Plan
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2 SITE CHARACTERISTICS 2.1 LOCATION The 15.83ha development site is located on four existing properties in the NSC local government area. The site is bounded by Trading Post Road and rural zoned area (Noosa Plan, 2013) to the east, rural zoned area to the north, Pearson’s Rd to the south and Cooroy Connection Road (Elm Street) to the west. The property description are: • 1/RP215922 - 19 Trading Post Road; • 4/RP215922 - 20 Trading Post Road; • 2/RP165418 - 4 Lamonts Road, Cooroy; and • 1/RP165418 - 2 Lamonts Road, Cooroy. Figure 2.1 below indicates the approximate location of the site. SITE COOROY CONNECTION ROAD Figure 2-1: Approximate Location of Site (Source: UBD 2006) 16-001014-01B | STORMWATER MANAGEMENT PLAN COOROY RETIREMENT COMMUNITY, TRADING POST (SWMP) | PALM LAKE RESORTS ROAD, COOROY |5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.