Council archive · source document
Attachment 7- Amended Ecological Assessment Report MCU12/208 · MCU12/0208
Very large file (32.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 242, section 1. The text section number identifies this passage in the reader.
Ecological Assessment Report
Noosa on Weyba
AGENCY / ISSUE RESPONSE
safe/effective protection and evacuation in the case of a bushfire emergency. The
alignments must be in accordance with Specific Outcome O12 of the Natural Hazards b) cul-de-sacs or no-through roads are provided with fire trails or access
and Natural Resources Overlay Code of the Noosa Plan. easements, capable of being navigated by conventional vehicles, that link to
through roads
The proposed road network complies.
ENVIRONMENTAL HEALTH
Issue Refer to report prepared by:
The site will be subject to significant impact by biting insects (mosquitoes, biting midge)
at times, particularly during Summer. Darryl McGinn
Director and Medical Entomologist
Mosquito Consulting Services Pty Ltd
ACN 095 739 067
PO Box 339, Mt Ommaney 4074
Ph./Fax: (07) 33761856
Mobile: 0404043867
e-Mail: [email protected]
ABN: 16 095 739 067
DNRM RFI – Ref IC0213NAM0001_SC14279.
2. Vegetation Management Act 1999
Results of preliminary assessment
The referral of your application was not accompanied by sufficient information
demonstrating compliance with the MCU Policy and RVM Code.
It is apparent from the submitted Property Vegetation Management Plan (PVMP) and
information that the intent of the project is to avoid clearing remnant vegetation by
ensuring infrastructure is adequately setback from vegetation. The exception is the
clearing proposed for access to the site from Hollett Road.
A preliminary assessment has been conducted based on provided plans, specifically
the Master Plan, Proposal Plan, Structure Plan and Koala Habitat and Vegetation
Offset areas. There is an inconsistency in these plans in identifying the extent of
development proposed which results in uncertainty about the amount of vegetation
clearing required.
Northbrook Corporation Pty Ltd Version 2 11 October 2013
Ecological Assessment Report V2.docx Commercial in Confidence
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7- Amended Ecological Assessment Report MCU12/208Related documentApplication case desk ↗
About this file
- File size
- 32.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.