Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 7- Amended Ecological Assessment Report MCU12/208 · MCU12/0208

of 250

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (32.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

Ecological Assessment Report
Noosa on Weyba



Queensland Wetland Buffer Planning Guideline (DERM 2011a) recognises the following types of buffer
elements as being effective in managing impacts to wetlands and waterways.
1.       Vegetation Retention/Restoration Works which:
         > filter nutrients and other pollutants travelling to wetland from surface run-off;
         > reduce speed overland flow reducing erosion hazard;
         > trap pesticides and herbicides;
         > block unwanted views;
         > provide competition for invasive pest plants; and
         > provide habitat for native fauna.
2.       Boardwalks, jetties and viewing platforms which are often built above ground level to allow access to
         wetlands while limiting disturbance. Their construction through or on the edge of a wetland buffer may
         allow reduction of the buffer distance needed for disturbance and recreational use. Benefits include:
         > facilitating recreational and educational enjoyment of a wetland or watercourse;
         > limiting negative impacts of physical disturbance by constraining users to a defined pathway
           avoiding altering hydrological regime;
         > allowing for fauna movement;
         > minimum disturbance during construction; and
         > access to open water for viewing or fishing.
3.       Water Sensitive Urban Design (WSUD), which is a multidisciplinary approach used to avoid or
         minimise urban development impacts on the natural water cycle and environmental values. It
         minimises stormwater run-off quantity and maximises stormwater quality. Used upstream of a
         wetland, it may reduce the separation distance required.
The Noosa on Weyba Concept Master Plan makes provision for the preservation of managed buffers
between areas of urban development and the following wetlands and waterways.

1.       Lake Weyba. The Noosa on Weyba site has approximately 1.6 km of frontage onto Lake Weyba with
         the majority (~75%) being contained within those areas that are proposed to be dedicated to the State
         for incorporation into the Noosa National Park. The balance of the Lake Weyba frontage will support a
         buffer between proposed urban Precinct 1 and the edge of Lake Weyba that ranges in width between
         50 to 90m. No new buildings are proposed within Lot 12 on RP893393 where an existing house and
         associated infrastructure is proposed to be retained and used as a community facility. It is proposed
         to enhance this facility with an in-ground swimming pool and a tennis court (no lighting) both located
         behind (west of) the lake front line of the existing dwelling on Lot 12 on RP893393.
         Lake Weyba buffer elements that are proposed include a full town sewerage system (i.e. no septic
         systems), water sensitive urban design, vegetation retention and enhancement and the establishment
         of appropriate infrastructure to facilitate sustainable forms of public pedestrian access to and
         enjoyment of the Lake Weyba foreshore. The cessation of livestock grazing within this sensitive
         foreshore area will also be beneficial to the ecology of Lake Weyba.
         The proposed buffers to Lake Weyba are consistent with the recommendations of FHG 003 and are
         generally superior to those which exist within the Eumarella Shores and Weyba Downs developments
         to the immediate south. In this respect it is noted that:
         a) the Eumarella Shores development has at least five dwellings, associated septic systems, and
            communal barbeque facilities located within 50m of the Lake Weyba foreshore as illustrated in the
            extract from the approved plan of development presented below; and




Northbrook Corporation Pty Ltd                        Version 2                                  11 October 2013
Ecological Assessment Report V2.docx            Commercial in Confidence                                Page 35

Used in these records

About this file

File size
32.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 7- Amended Ecological Assessment Report MCU12_208.pdf · 32.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.