Ecological Assessment Report
Noosa on Weyba
5.8.1 Pre-construction (Detailed Design) Phase
Table 5-7 provides a non-exhaustive list of the biodiversity management issues and measures that are of
relevance to the pre-construction (detailed design) phase of the Noosa on Weyba project.
Table 5-7 Pre-Construction phase biodiversity management issues and measures
Management Issue Proposed Management Measures
Compliance with BDOA Formal transfer of ownership of the Noosa on Weyba Send land to the State for
Agreement incorporation into the Noosa National Park.
Noosa on Weyba Nature Preparation of a formal application to the State for registration of a Nature Refuge
Refuge Declaration agreement over the Noosa on Weyba estate.
Effective Integrated Initiation of a Noosa on Weyba Biodiversity working group involving representatives
Management of Protected from the developer, the State Government, Council and the stewards of the Tainsh’s
Areas Nature Refuge. The purpose of this working group would be to discuss and resolve
issues associated with the management of the protected areas (e.g. control of wild
dogs).
Environmental Offsets Commencement of preliminary environmental offset works within the Noosa on
Weyba Send and Receive land. The environmental offset works would be
undertaken in accordance with the requirements of:
> Offsets for Net Gain of Koala Habitat in South East Queensland Policy (DERM
2010); and
> Policy for Vegetation Management Offsets Version 3 (DERM 2011b).
Compliance with Conditions It is anticipated that any approval of the current MCU application will include a range
attached to the MCU of Conditions requiring the preparation of detailed management plans that would
Approval guide and support applications for future stages/phases of the Noosa on Weyba
project, such as:
> a Vegetation and Fauna Management and Monitoring Plan (VFMMP);
> an Open Space Conservation Zone Management Plan; and
> an Environmental Management Plan.
Street Lighting The detailed design of the estate shall be achieved such that:
> lighting is located and orientated to minimise negative impacts on wildlife and
environmentally sensitive areas; and
> the vertical illumination resulting from direct, reflected or other incidental light
emanating from lighting does not when measured at the boundary of
environmentally sensitive areas and protected estate boundaries at any level
from ground level upward, exceed the relevant lux levels specified in the
approved VFMMP.
Nature Conservation Act Necessary applications for permits for clearing protected plants and/or interfering
Permits with an animal breeding place would be obtained from DEHP.
5.8.2 Construction Phase
Table 5-8 provides a non-exhaustive list of the biodiversity management issues and measures that are or
relevance to the construction phase of the Noosa on Weyba project.
Northbrook Corporation Pty Ltd Version 2 11 October 2013
Ecological Assessment Report V2.docx Commercial in Confidence Page 43
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7- Amended Ecological Assessment Report MCU12/208Related documentApplication case desk ↗
About this file
- File size
- 32.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.